Radar Vectors
FAA Order Cancelled Issued Nov 9, 1992 AOS-310 1 pages Copy saved Nov 22, 2026

Order 6100.4 ELECTRONIC Equipment Modification Handbook Peripheral, Adapter Module Replacement (PAMRI)

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

Federal Aviation Administration A

Memorandum

Date: March 15, 2007

To: Al Spence ABA-20, Agency Directives Manager From: Henry Gonzalez

ATO-E Program Manager Prepared by: Sandy Denham, ATO-E Subject: Cancellation of Order 6100.4, Electronic Equipment Modification Handbook Peripheral Adapter Module Replacement (PAMRI), and Order 6110.6, Project Implementation Plan Peripheral Adapter Replacement Module Item.

Order 6100.4, Electronic Equipment Moifcation Handbook Peripheral Adapter Module Replacement (PAMRI), and Order 6110.6, Project Implementation Plan Peripheral Adapter Replacement Module Item, should be cancelled, as the system that these Orders reference has been retired.

Henry Gonzalez Directór of En Route Program Operations