SUBJ: CONTROL OF AIRWAY FACILITIES TECHNICAL ACTIVITIES
1. PURPOSE. This order establishes the requirement for Airway Facilities (AF) technical personnel to identify, program, and record completion or noncompletion of required facility maintenance work.
SUBJ: CONTROL OF AIRWAY FACILITIES TECHNICAL ACTIVITIES
2. _DISTRIBUTION. This order is distributed in the Airway Facilities Division to the branch Tevel;_to Airway Facilities Sectors; and their -subordinate fieldeoffices
3. CANCELLATON.Order WE 6030.32A, Control of Airway FaciJities Technical Activities, 3/15/76, is cancelled.
4. BACKGROUND. The objective of the Airway Facilities technical maintenance program is to accomplish l00% of the required maintenance on each facility. Emphasis on 100% accomplishment of scheduled perfomance checks and other maintenance tasks reinforces the need for thorough documentation of AF maintenance activities. To fulfill this requirement, WP Foms 6030-3 and 6030-3-l, AF Technical Activities Control Charts, were developed. WP Form 6030-3 is a General Purpose Controk6hartthat provides for fourteen technical activities per chart and the WP Form 6030-3-1 allows for seven technical activities per chart. In additiongmprograms have been developed and implemented at the ARTCCs that use the automated systems (STARS/MARS) for schedul ing and recording completionof their perlodic maintenance activities.
5. ACTION.
a. ARTCCs may document their periodic mainenance ctixifies using the (STARS/MARS) automated systems providing the data repofded beets with the intent of this order. All other NAs facilities terhhicians and first level technical supervisors shall continue to identify "grbud/and program periodic maintenance requirements on WP Fonn 6030-3, AF rechnical Activities Control Charts. Failure to complete all required tasks must be documented starting on receipt of this order.
b. In order to establish systematic control of the AF Maintenance Program at the facility level, technicians and first level supervisors shall:
(1) Identify facility periodic maintenan.é requirements.
Distribution: A-X(AF)-3,A-FAF-2/3/7(LTD) Initiated By: AWP-460
WP 6030.32B 7/15/82
(2) Group performance checks and other maintenance tasks into manageable work units.
(3) Program these technical activities on one or more WP Fom 6030-3. List required work according to schedule, i.e., weekly (W), biweekly (BW), monthly (M), quarterly (Q), semi-annual (SA), and annual (A). Do not include daily checks.
(4) Record completion of programmed work.
(5) Document non-completion of programmed work.
(6) Monitor and evaluate the Facility Maintenance Program.
6. DEFINITIONS.
a. Periodic Maintenance. Any scheduled preventive maintenance activities that include performance checks and other maintenance tasks mandatory to periodic maintenance activities. Examples are: Weekly, Quarterly, Annually, etc.
b. Performance Check. A periodic scheduled test, measurement, or observation of normal operating controls and functions, to determine whether a system, subsystem, or equipment is operating within its established tolerances or limits (i.e., doing its job satisfactorily at a given time). Exampies are: Receiver Band Pass, Transmitter Frequency, etc.
c. Other Maintenance Task. Any periodic scheduled task other than a performance check, which is necessary to prevent deterioration and/or ensure reliable operation of the system, subsysten, or equipment. These tasks are not performance checks. Examples are: Lubricate motors, replace filters, etc.
7. WE FORM 603O-3, AF TECHNICAL ACTIVITIES CONTROL CHART. ThiS iS a general purpose chart on which specific and detailed maintenance programs are developed. This should be done locally by those primarily responsible for the Facility Maintenance Program - the facility technician and the first level technical supervisor. Key steps are:
a. Identify repetitive performance checks and other maintenance tasks required by facility and equipment handbooks. Identify supplemental activities required by AF sector management.
(1) Include all maintenance activities required by ALL handbooks applicable to the facility. Also indicate, for ready reference, the directive specifying the maintenance requirement.
Page 2 Par 5
7/15/82 WP 6030.32B
1#v (2) Do not change minimum maintenance requirements specified in facility and equipment handbooks. The exception is that AF sector managers may increase the frequency of accomplishment (reduce recycle time) or add technical activities necessary to achieve sector goals.
b. Group facility work requirements into manageable work units, i.e., related performance checks or other maintenance tasks that nommally can be completed in one or two days work at the facility. For example:
(1) At a small RTR facility, a reasonable work unit is: Check all A/G receivers for sensitivity, squeTch action, AVC, and audio.
(2) At a large RTR, the same maintenance requirement should be examined to limit the size of the work unit to manageable proportions. One way to do this is by limiting the scope of the requirement. For example:
(a) Limit by equipment configuration: Check receivers in Row 1 for sensitivity, squelch action, AVC, and audio.
(b) Limit by sub-system or equipment type: Check VHF receivers for sensitivity, squelch action, AVC, and audio.
c. Program AF technical activities on WP Form 6030-3.
(1) Use more than one chart if necessary to program total facility maintenance requirements in manageable work units. The charts are 10" x 14" and are printed on card stock. They are meant to be posted in the work area and should show at a glance what has been done and what needs doing.
(2) Appendix 1 illustrates WP Form 6030-3. This is a partial program for an RTR facility with VFC equipment. A second chart would be used to program technical activities relating to UHF equipment and annual requirements.
d. Record completion of required work with a date and initial. Use ink.
(1) Record the date and initials when required work is complete. Indicate partial completion (work started but not complete) with dates only. This record technique provides a ready reference to appropriate entries in the facilities maintenance log that describes that portion of work completed. This is particularly valuable when quarterly, semiannual, and annual work is accomplished over a period of several months.
Par 7 Page 3
WP 6030.32B 7/15/82
(2) Keep the chart uncluttered so the status of the Facility Maintenance Program can be determined at a glance.
e. Document non-completion of required work as outlined below. The purpose of our FAA Periodic Maintenance Program is to improve facility reliability through accomplishment of ALL scheduled activities. It is sometimes impossible to complete l00% for various reasons. These cases are to be documented on WP Form 6030-3 by entering a number in the initial/date block of the uncompleted task. (See Appendix 1.) Enter this same number on the back of the form under task missed, then complete reasons and initial blocks. A separate sheet may be used to.record this non-completion information in lieu of WP Form 6030-3 as determined by the sector manager.
f. Monitor the Facility Maintenanance Program. Technical supervisors should verify satisfactory completion and review causes of non-completion of programmed work at periodic intervals and report upwards on. the status of the Facility Maintenance Program.
8. FORMS REQUESTS AND RETENTION.
a. Request AF Technical Activities Control Charts from the Airway Facilities Division. Initial supplies of new or revised charts will be distributed as they are developed.
b. Data blocks on FAA Forms 6030-3.:
appropriate schedule, i.e., W, BW, M, Q, SA, and A. (1) The block labeled "S" or sched has been retained to show the
(2) A block labeled "T" or # tasks has been added and should be used to show the number of related tasks which are grouped to make up the technical activity. This is one factor that indicates the relative size of the activity.
(3) A block labeled "U" or # units has been added and should be used to indicate the number of systems, subsystems, or units of equipment that are grouped to form the reasonable and manageable work unit. This is the second factor that shows the relative size of the technical activity.
(4) The back of each form will include space for documentation of uncompleted periodic maintenance.
Page 4 Par 7
7/15/82 WP 6030.32B
c. Retain AF Technical Actiyities Control Charts and documentation of uncompleted periodic maintenance,activities at the facility for the regular retention period of three years. This will facilitiate technical research by providing a cross reference to the FAA Fomm 6030-1, facility maintenance log, and will assure continuity of th Facility Maintenance Program.
ALEX HAMMOND Acting Chief, Airway Facilities Division
Par 8 Page 5
ONT RTR A F FACILITY IDENT & TYPE YEAR
ONT RTR A F FACILITY IDENT & TYPE YEAR
PROGRAMED WORK & REFERENCE CHK FS TONE (SMP 6000.4 P33) T CHK REMOTE CONT FUNCTIONS & ALDIO U QUALITYT 6 R (6500.5 P 215) S W CHK AUDIO QUAL A/G XTIR & RCVRS
T U RECORD XMTR PWR & VOICE MOD. (6610.1 P 47 & SMP 6500.7 P 68)
M CHK AMP. MONITOR VOICE QUAL T 6 REC (6040 1 PAR 41) RECORD U VSWR (6610.1 PAR 47) S M RECORD A/G RCVR SENS, T SQUELCI, AVC, AUD1O U (SMP 6500.7 PAR 68) S M CHK SENS VP RCVRS, CHK GAIN & T BIAS (6500.S PAR 215)
U S M VISUAL CHK ANT SYSTEM. CHX T AIR COND & VENI SYSTEM U (AFP 6970.4 P 88, APP 6970.10 P 7) S M CHECK E/C MINC T (SMP 6980.3 PAR 149) U CHX A/C XMTRS TUNING & T 1000 Hz MOD (6610.1 PAR 47)
U S CHK AUDIO LEVELS (6500.5 P 215) T CIK VF HYBRID BALANCE U (WE 6500.9 PAR 58)
VERLFY CUMPLI.TION OF PROGRAMED T WORK. CHK SUP, TEST WORK EQUIP.
i
TECHNICAL ACTIVITIES CONTROL CHART CHART 1 OF ISYS. SUB-SYSTEM,EQUIP VHF- VFC-P&S 7/15/82
TECHNICAL ACTIVITIES CONTROL CHART CHART 1 OF ISYS. SUB-SYSTEM,EQUIP VHF- VFC-P&S 7/15/82
JAN FEB MAR APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC
1 10 24 1 11 2 7 i5 19 26 15 ou aa 3 Bu 10 du 2 5 11 aa 2 9
17 24 15 25 19 44 26 3
3 5 2 ia
9
3 19 14 24 24 de 15 25 23 Bu 74 5 aa 26 26 aa aa 2 V5 aa ad 9 APPENDIX 1. SAMPLE WP FORM 5030 0
JAN FEB MAR APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC
1 19 73 3 aa 1
37 13
SAFETY FACTORS, FIRE EQUIP (6930.1 P 59)
U SA RECORD A/C XMTR FREQ T (6610 1 PAR 47) U SA CHX AUDIO FREQ RESPONSE ALL T FAA 1142 SPEC & VG LINES U (6500 5 PAR 215) SA CHK BLDG, GND, ROADS, ELECT SYS APP T 6900.9 AFP 6940.8 P 7 APP 6940.7 P 6 U SA CHK TEST EQUIP OPN T 6200.4A & SECTOR POLICY
WP FORM 6030-3 (7/82)
WP FORM 6030-3 (7/82)
2 60 FRONT
1 15 9 aa Appendix 1 WP 6030.32B
NOTE: When a scheduled PM is missed, enter a number in the initial/date block for
the uncompleted PM on the front of the form. Enter this same number of the back of this, or the optional form, under PM MISSED, then complete REASON and INITIAL blocks.
WP 6030.32B Appendix 1
7/15/82
APPENDIX 1. SAMPLE WP FORM 6030-3 - BACK
APPENDIX 1. SAMPLE WP FORM 6030-3 - BACK
WE FORM 6030-3 BACK
RECORD OF NON-COMPLETION MISSED REASON 1,2
ET INITIALS
SUPVR INITIALS
Assigned technician on S/L. No relief available
3 IX power not checked. Bad wattmeter element. 4 Sig Gen Failed. S/N 124 & 30 not completed
B.H.
A. A.
SUPVR INITIALS
Y.E.
R.W
RW.
R.H.