Radar Vectors
FAA Order Cancelled Issued Feb 25, 2016 AJW-183 Copy saved Nov 18, 2026

Order JO 6030.31G National Airspace System Infrastructure Failure Response

This order establishes Technical Operations policy on the National Airspace System (NAS) infrastructure response times. This order assigns standard response codes for NAS equipment, and removes the requirement for local Service Level Agreements (SLA). This order provides guidance for strategic response planning and local operational decision making. Appendix A contains additional administrative information

This document is cancelled. Cancelled by JO 6030.31H. Check the official source before relying on it.

Official source ↗

National Airspace System Infrastructure Failure Response

This order establishes Technical Operations policy on the National Airspace System (NAS) infrastructure response times. This order assigns standard response codes for NAS equipment, and removes the requirement for local Service Level Agreements (SLA). This order provides guidance for strategic response planning and local operational decision making. Appendix A contains additional administrative information