Order 6000.49 Regional Tracking Program Management/administration Handbook
This order establishes the Regional Tracking Program (RTP) as the primary management software system used by the regions and Aeronautical Center for internal budget preparation, planning, facilities and equipment (F&E) projects from inception through capitalization. This order establishes the RTP as the primary management software system used by the Technical Center for F&E budget preparation and submission. In addition, this order describes the subsystems comprising the RTP and the management and oversight organizations responsible for the program.
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Text read by OCR from a scanned file. Check the original, as some words may be misread.
ORDER U.S.DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION 6000.49
ORDER U.S.DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION 6000.49
4/14/95
REGIONAL TRACKING PROGRAM SUBJ:
1. PURPoSE. This order establishes the Regional Tracking Program (RTP) as the primary management software system used by the regions and Aeronautical Center for internalbudget preparation, planning, resource estimating, project tracking, and upward reporting on facilities andequipment (F&E) projects from inception through capitalization. This order establishes the RTP as the primary management software system used by the Technical Center for F&E budget preparation and submission.Inaddition, this order describes the subsystems comprising the RTP and the management and oversight organizationsresponsiblefortheprogram.
2. DISTRIBUTION. This order is distributed to the division level within Airway Facilities, Office ofCommunications,Navigation, and SurveillanceSystems, Office ofAcquisitions, AirTrafficService, Office of Budget and Accounting,Office of Aviation Policy and Plans, Office of Information Technology, and the Office of System Architecture and Program Evaluation in Washington headquarters; to the director level at the Aeronautical Center and the FAA Technical Center; to the branch level in the regional Airway Facilities divisions.
3. BACKGROUND. The RTP,formerly known as the Regional Project Management System (RPMs), consists ofa set of software and hardware tools designed to automate the F&E project life-cycle management functions.The F&E project life cycle encompasses planning, budgeting,financial control, procurement,scheduling, engineering,construction,installation,and capitalization.These functionsinclude activities such as estimatingresource requirements, submitting budget requeststo theoffice ofBudget, authorizing and assigning projects, identifying project tasks and milestones, determining material required, cost tracking, and reporting on facilities commissioned. The F&E Reporting System (FERS), the F&E Manpower System (FEMS), and manyregionally developed programswere used to managethe F&E processes before the development ofthe RTPsubsystems. The RTP subsystems replace these systems and provide a set of uniform definitions and procedures for managingF&Eprojects.
4. RELATED PUBLICATIONS. See Appendix 1, RTP Reference Documents, forpublications that relate tothisorder.
Distribution: A-W(AF/ND/SU/AT/BA/PO/IT/SD)-3; Initiated By:ANS-100 A-YZ-1;A-X(AF)-3
6000.49 4/14/95
5. SCoPE. This order assigns responsibilities for maintaining various project related data and procedures in accordance with user guides and manuals.Additionally, the order requires the submission of specific information to headquarters periodically.
6.RESPONSIBILITIES.
a. Primary. The RTP is managed by the NAS Planning and Support Division, ANS-100.ANS-100will provide overallprogram direction; coordinaterequirementsand specificationswith users; calltechnical reviewand user meetings;assign development priorities;publishmanuals,guides,and other documentation;and establishand administer contracts to provide software and hardware tosupporttheprogram.
b.Headguarters.
(1) The Program Control Branch, ABU-320, is the office of primaryresponsibility(OPR) for the contents, schedules, and procedures concerning the F&E program budget software.
(2) The Financial Management Division, AFZ-400, is theOPR for establishing direct F&E staffing requirements.AFZ-400is jointly responsible with ABU-320 andNAS Programming and Financial Management,F&EDivision, ASD-310,for establishing the F&E budget informationsystemrequirements.
(3)The Telecommunications Support andInternational Communications Division, AOP-600, is the OPRfor the inclusion of telecommunications management and operations (TM&o)resource requirements applicable to TM&o work. All requirements for the TM&o portion of the budget software are the responsibilityof AOP-600.
(4) F&E program offices will enterorprovide program budgetrequest submissions, budgetvalidations, and project material listmodifications.
c. Regions and Centers. Each regional Airway Facilities (AF) division, the Aeronautical Center (AMP),and theFAA Technical Center(FAATC)shalluse the RTP relevantapplication software and followthe coding standards outlined in Appendix 2,RTP Coding Standards;Appendix 3, RTP Standard Activities; andAppendix4, Facility Coding.
7. COMMITTEES.
a. General. The RTP application software is beingdeveloped and implementedin accordance with the requirements and specifications of the F&E users in theregions, centers, and headquarters.The RTP Executive ProgramCommittee,the headquarters and regional RTP users groups, and the National RTP Technical Committee are established to provide a forum for the F&E users. The committees may reviewissues and recommend actions in
Page 2 Par 5
4/14/95 6000.49
the areas of program requirements, specifications, procedures, processing,reporting,andstandardization.
b. RTP Executive Program Committee. This committeewill be chairedby the manager of ANs-100. The committee will be made up of management representatives from four tosix regional AF divisions.Thisgroup shall be responsible for setting the proceduresfor regional submissionof F&Estaffingrequirements, establishing a charter,for reviewingissues raised by the regions concerning the RTP, for advising theprogram office on policy and procedures, and for creating an environment in which the regions can obtain the most benefits from the RTP. The committee shall establish a standing sub-committee to review requests for regional data submissions.This sub-committee ofthree regional andone program office representatives shall determine if RTP can provide the required data.
c. National RTP Technical Committee. This committee is made up of RTP software users who will provide the RTP with technical advice and evaluations. The committee shallconsistof two representatives from each regional AF division. There will be one representativefromthe AeronauticalCenter,AMP-1A,the Resource ManagementService (ACM)atthe FAATC, AOP-600, AFZ-400, ABU-320, and ASD-310. The committee shall meet at least annually. The committee, by majority vote, shall select a chairperson and vice chairperson to serve for 18-month terms.The chairperson shall serve as the point-of-contact on a day-to-day basis for the program office. The technical committee may establish subcommittees to define hardware and software requirements, review functional specifications, and evaluate application software deliveries.
d.Headquarters RTP Users Group.A committeeof headquarters users of the F&Eprogram budget, project schedule and statusdata, and headquartersfinancialplanningsoftware is established.This committee shall provide headquarters user requirements, advise the RTP on procedures and reviewapplication software.The committee will consist of representatives from ANS-100, AFZ-400, ABU-310/320, ASD-310, AND-1, AUA-1, and F&E program office. ANS-100 will chair andcallthe meetings.
e. Regional RTP Users Groups. Because theRTPsponsored software serves a broad range of F&Eand maintenance requirements including AirwayFacilities and Air Traffic training requirements, each region shall establish a RTP users group whichincludes representatives from all impacted branches and divisions. The users groups shall define regional user requirements and review specifications. The regional users groupsshall meet at leastonce every2months.
8. CONFIGURATION MANAGEMENT. ANS-100 shall develop and implement configuration management procedures and software for controlling
Par7 Page3
changes, enhancements, corrections,and modifications toRTP softwareand documentation. The National RTP Technical Committee shall review andmakerecommendations concerningthe configuration management procedures and software.
9. PROCEDURES. The documents listed in appendix 1 define the RTP procedures. These documents and procedures are incorporated and made part of this order by reference.
10. SUBMISSION REQUIREMENTS. Each region, center,or program covered by this order shall use the RTP application software tools
for thefollowing:
REQUIREMENTS SUBSYSTEM
REQUIREMENTS SUBSYSTEM
Submit F&E Regional budget data. Budget Module
Submit tele- Regional communications Budget budget data. Module
Validate F&E Budget budget Module submissions, adjustprojects.
Review and Budget correct national Module stock numbers and project material list prototypes.
Submit F&E Regional project lists for Project staffingestimates.Management
Provide major National end-itemequipment Delivery delivery dates and Forecast relateddata. Module
Submitmajor Project milestones and Schedule/ costs on projects. Status Data
ORGANIZATIONS
Regions,Centers, F&E Program Offices
Regions,Centers
F&E Program Offices
F&E Program Offices
Regions
F&E Program Offices/Regions
Regions
FREQUENCY
Annually (January/ February)
Annually
Annually
Annually
Annually (February/ March)
As changes occur
Monthly
Par 8
REOUIREMENTS SUBSYSTEM
REOUIREMENTS SUBSYSTEM
Submitfinancial Financial planning reports Planning including and Control obligation plans, fiscal status reports,expiring funds report, reprogramming actionsandbasic fiscalplans.
Submit requests Configurfor software ation changes, obtain Management status detail and document changes.
ORGANIZATIONS
Regions
Regions, ProgramOffice
FREQUENCY
As required when RTP phase III is implemented
As required
11. STANDARDS. Appendixes 2,3, and4 are incorporated by reference into this order. They establish the RTP standards of data
usage for project management.
pogui Wiekill
Joafuin Archilla DirectorofAirwayFacilities
Page 5 (and 6)
Par 10
APPENDIX 1. RTP REFERENCE DOCUMENTS
APPENDIX 1. RTP REFERENCE DOCUMENTS
1.SoFTWARE.The relevant commercial off-the-shelf software manuals and RTP application manuals will be listed in the RTP ConfigurationManagement System. The applicationmanualslisting willinclude the latest version number.
2.ORDERS.All orders are latest edition.
a. Order 1375.4, Standard DataElements and Codes, Facility Identifications, and Supplemental Standards. This order prescribes facility identification codes and explains supplemental codes used in facility related data systems, and contains criteria for the establishment and useof codes.
b. Order 4650.7, Management of NAS F&E Project Material. This order establishesobjectives, principle responsibilities,and informalprocedures for themanagement and control ofproject material required inthe establishment and modification of facilities in the NAS.
c. Order 600o.5, Facility, Service, and Equipment Profile (FSEP). This order describes the FSEP and provides instructions for updating. It also describes annual evaluations required to ensure the accuracy of the FSEP data.
d. Order 6030.45, Facility Reference Data File. This order prescribes the requirements for the establishment and maintenanceof a facility reference data file (FRDF) for each airwayfacility covered byFAA Forms 6030-1 or6030-2,Facility Maintenance Log. It also establishes the requirements for joint acceptance inspection (JAI) and for collecting and recording facility, system, and equipmenttechnicalreferencedata.
Page1
4/14/95 Appendix 2 6000.49
APPENDIX 2. RTP CODING STANDARDS
APPENDIX 2. RTP CODING STANDARDS
1. PURPoSE. The following standards shall be used throughout the FAA for encoding the resource data(personnel)of all RTP subsystems, applications, andmodules.The codingstructure described in this standard shall be used in order to provide maximum flexibility, minimum code size, and ease ofunderstanding.
2. STANDARD FOR THE SEVEN-POSITION RESOURCE FIELD.
a. The specific fields are:
POSITION 1-4 RESOURCETYPE POSITION5 RESOURCE FUNDING CHARACTER (COST CLASS) POSITION6 SPECIAL USECODE POSITION 7 EXPERIENCE/EDUCATIONLEVEL
b. The resource field must meetthe following additional requirements:
(1) Position 1 through 5 must be used.
(2) If position 5 contains an alpha character (because the resource is not funded by F&E), position 6 must be used to give source.
(3) If position 5 contains a costclass; i.e., 0-9, position 6 is used only if the laborsource is provided byother than F&E.
(4) Position 7 use is optional.
(5) All NAS Implementation Support Contract (NISC) resources willuse aminimum ofsix positions.
3. POSITION 1 THROUGH 4 = AUTHORIZED RESOURCE CODES. The following table lists authorizedresource codes. Requestsfor additions or deletions to this list must be made through ANS-100.
4 ENGINEERING AND TECHNICAL SKILLS.
AUTE AUTOMATION ENGINEERING DRFD DRAFTING(ALL) CIVE CIVIL ENGINEERING COME COMMUNICATIONSENGINEERING CONS CONSTRUCTIONS SUPPORT ELCE ELECTRICAL ENGINEERING ELTE ELECTRONIC ENGINEER INST INSTALLATIONTECHNICIANS MECE MECHANICAL ENGINEERING NAVE NAVAID ENGINEERING RADE RADAR ENGINEERING RESE RESIDENT ENGINEERING TORS TECHNICALONSITEREPRESENTATIVE
6000.49 4/14/95 Appendix2
APPENDIX 2. RTP CODING STANDARDS (CONTINUED)
APPENDIX 2. RTP CODING STANDARDS (CONTINUED)
AUTT AUTOMATION TECHNICIAN COMT COMMUNICATION TECHNICIAN TELS TELECOMMUNICATIONS SPECIALIST NAVT NAVAIDS TECHNICIAN RADT RADAR TECHNICIAN SYSE SYSTEM ENGINEER SWES SOFTWARE ENGINEERING SPECIALIST AFSS AIRWAY FACILITIESSOFTWARE SPECIALIST ESUE ENVIRONMENTAL ENGINEER ESUT ENVIRONMENTAL SUPPORT SPECIALIST
5. PROGRAM SUPPORT SKILLS.
MAGR MANAGER(NISC) ADMA ADMINISTRATIVEASSISTANT PLAN PLANNER HRAY HUMAN RESOURCE ANALYST CMPA COMPUTER ANALYST IDHS INDUSTRIAL HYGIENE SPECIALIST AFCO AIRWAY FACILITIES COMPUTER OPERATOR AADS DOCUMENT CONTROL SPECIALIST AFPC AIRWAY FACILITIESPROJECT COORDINATOR SECS CLERICAL SUPPORT SPECIALIST PRGA PROGRAM ANALYST SAFE SAFETY ENGINEER RAPM REGIONAL ASSOCIATEPROGRAM MANAGER LGSR LOGISTICS SPECIALIST - REGIONAL OFFICE LGSF LOGISTICS SPECIALIST -FIELDOFFICES AFOC NAS ONSITECOORDINATOR AFPM AIRWAY FACILITIES PROGRAM MANAGER AFTR AIRWAY FACILITIES PROJECT TEST DIRECTOR ADBM AUTOMATION DATABASE MANAGER CONM CONFIGURATION MANAGEMENT SPECIALIST TSKM TASK AREA MANAGER LADM LAN ADMINISTRATOR MISP MANAGEMENT INFORMATION SPECIALIST RESM RESOURCE MANAGER
6. AIR TRAFFIC SKILLS.
ATPC AIRTRAFFIC PROJECTCOORDINATOR ATSS AIR TRAFFICSOFTWARESPECIALIST CTRL AIR TRAFFICCONTROLLER ATPR AIR TRAFFIC PROJECTTEST DIRECTOR ATAM AIR TRAFFIC AREA MANAGER ATPM AIR TRAFFICPROGRAM MANAGER
7. TRAINING SKILLS.
ATTR AIRTRAFFIC TRAININGDIRECTOR ATTS AIR TRAFFIC TRAINING SPECIALIST AFTS AIRWAY FACILITIES TRAINING SPECIALIST
APPENDIX 2. RTP CODING STANDARDS (CONTINUED)
TRNF AIRWAY FACILITIESTRAININGINSTRUCTOR TRNT AIRTRAFFICTRAINING INSTRUCTOR
TRNF AIRWAY FACILITIESTRAININGINSTRUCTOR TRNT AIRTRAFFICTRAINING INSTRUCTOR
8. POSITION 5 = RESOURCE FUNDING CHARACTER. (Must be uSed).
a. Cost class numbers 0 through 9 will be used here if F&E is funding the work. This F&E funding must come from regional project or PCB&T funds to qualify to be assigned a numeric cost class.
0 ASSET/EXPENSE TRANSACTION 1 PLANTS ENGINEERING 2 ELECTRONICS ENGINEERING 3 CONSTRUCTION 4 INSTALLATION 5 FLIGHT INSPECTION 6 DRAFTING(OPTIONAL) 7 (Not Assigned) 8 (NotAssigned) 9 TSSC A-Z F&E WILL NOT ACCOMPLISHNOR FUND
b. Resource codes not qualifying for a numeric code (i.e. not doing regional direct project work)will be assigned an alpha character. The following is a list of alpha characters that are designated to be usedfor specific job areas. All other alpha characters may be regionally assigned.
N PROGRAM SUPPORT(NISC) REGIONAL SUPPORTMANAGER(NISC) ADMINISTRATIVEASSISTANT
N PROGRAM SUPPORT(NISC) REGIONAL SUPPORTMANAGER(NISC) ADMINISTRATIVEASSISTANT
A AUTOMATIONSUPPORT RTP PERSONNEL (LAN ADMINISTRATOR and DATA BASE MANAGER) OTHER REGIONAL AUTOMATION SUPPORT PERSONNEL
P PROGRAM AND PLANNING SUPPORT SUPPORT TOREGIONAL ASSOCIATE PROGRAMMANAGERS(RAPM) TRANSITION PLANNING STRATEGIC PLANNING PROGRAM ANALYSTS TRAINING SPECIALISTS
H HAZARDOUSMATERIAL (HAZMAT) and OCCUPATIONAL SAFETY& HEALTH ADMINISTRATION(OSHA)PROGRAMSUPPORT
H HAZARDOUSMATERIAL (HAZMAT) and OCCUPATIONAL SAFETY& HEALTH ADMINISTRATION(OSHA)PROGRAMSUPPORT
E ENGINEERING SUPPORT COMPUTER-AIDED ENGINEERING GRAPHICS(CAEG)DRAFTSMAN ENGINEERING SUPPORT TO TELECOMMUNICATIONS (NON-F&E) ENGINEERING SUPPORT TO MAINTENANCEOPERATIONS (OPS)AND SECTORS(NON-F&E)
Page3
6000.49 4/14/95 Appendix 2
APPENDIX 2. RTP CODING STANDARDS (CONTINUED)
APPENDIX 2. RTP CODING STANDARDS (CONTINUED)
L LOGISTICAL SUPPORT LOGISTICS SPECIALISTS CONFIGURATIONMANAGEMENT NAILS DEPLOYMENT READINESSREVIEW(DRR)
T FACILITYTRANSITIONINGSUPPORT AIR ROUTETRAFFIC CONTROL CENTER(ARTCC),AIRPORT TRAFFICCONTROLTOWER(ATCT)/TERMINAL,GENERALNAS (GNAS),OTHERAIRTRAFFICSPECIALIST
M TELECOMMUNICATIONSSUPPORT LEASEDINTERFACILITY NASCOMMUNICATIONSSYSTEM (LINCS)
M TELECOMMUNICATIONSSUPPORT LEASEDINTERFACILITY NASCOMMUNICATIONSSYSTEM (LINCS)
S SPECIAL PROJECTS SOUTHERN CALIFORNIA TERMINAL RADAR APPROACH CONTROL FACILITY(TRACON) POTOMAC PROJECT
9. POSITION 6 = SPECIAL USE CODE. Must be usedif position 5 contains an alpha character. Can be used if position 5 contains a cost class [0-9] to show the source of resource if F&E is funding but not providing the resource.
S SPECIAL PROJECTS SOUTHERN CALIFORNIA TERMINAL RADAR APPROACH CONTROL FACILITY(TRACON) POTOMAC PROJECT
A-J OPEN FOR ASSIGNMENT BY REGIONSFOR REGIONAL USE K NOT ASSIGNED L MAINTENANCE OPERATIONS M TM&O N MANAGEMENT AND ADMINISTRATION RESTRICTED-NOT TO BE USED P NOTASSIGNED Q NOT ASSIGNED(FORMERLY NATIONAL TSSC PROJECTS) R REIMBURSABLE S TURNKEYCONTRACTOR T TSSC U NISC V ARCHITECTUREANDENGINEERING(A&E)CONTRACTOR W DRAFTINGCONTRACTOR x CORP OF ARMY ENGINEERS Y AIR TRAFFIC OPSFUNDEDPERSONNEL Z AIRWAY FACILITYOPS-FUNDEDPERSONNEL
10. POSITION 7 = EXPERIENCE/EDUCATION LEVEL. (Non-F&E reSources only)
a. The individual must have a minimum of a 4-year college degree Bachelor ofScience (B.S.), Bachelorof Engineering (B.E.), Bachelor of Arts (B.A.), orequivalent in an applicable fieid of study and must have 5 or more years of relevant experience.
b. The individual must have a minimum ofa 4-yearcollege degree B.S.,B.E.,B.A., orequivalent in an applicable field of study.
c. The individual must have more than 5years of relevant experience.
d. The individual must have one to 5 years of relevant experience.
Page5(and6)
APPENDIX 3. RTP STANDARD ACTIVITIES
APPENDIX 3. RTP STANDARD ACTIVITIES
1. PURPOSE. This appendix lists the activities and milestones which are assigned standard activity descriptions, and defines the numbering scheme to be used when assigning sub-activity/milestone numbers. This appendix also defines which of the 23 NAs standard activitiesand milestones are designated as minimum requirements for national reporting, and which shall be used in the national prototypenetworks.
2. DEFINITIONS. To preclude any misunderstanding of terms in the Phase III system, the following definitions are listed. Since the Phase III system uses Prestige software as the heart of its project management system, most of the definitions are taken directly out ofthe Prestige user manuals.
a. Project. A large, complex task, comprising many smaller related activities. Projects may involve very routine operations that are performed repetitively but are usually either unique endeavorsor similar jobs with changeable elements.
b. Project Management. The process of achieving the project objectives within certain constraints such as available resources(machines,people, materials),project deadlines, and budget restrictions.The goal of project management is to make the most effective use of available resources.
c. Activity. A specific work operation. Activities require the performance of tasks which consume both time and resources, and have specific start and end dates. Standard activities are those activities widely used in F&E projects and listed in paragraph 5 of this appendix. The numbers assigned to standard activities are reserved and shall not be used for any other activities.
d. Network. Defines the relationships between activities. The network forms the basis for a detailed project schedule.
e. Milestone. An event that occurs at aspecific time, highlighting an importantphase ofa project.
f. Hammock. Made up of activities and milestones or groups of activities and milestones which summarize an activity or group of activities.
g. Network Analysis.Also known as time analysis or time scheduling. A structuredforward pass through a network to calculate early dates at which activities can start and finish, and a backward pass to calculate the latest dates that activities can start andfinish.
6000.49 4/14/95 Appendix3
APPENDIX 3. RTP STANDARD ACTIVITIES (CONTINUED)
APPENDIX 3. RTP STANDARD ACTIVITIES (CONTINUED)
3. NUMBERING. In the Phase III system, the numbering scheme is designed to give maximum flexibility to the user for project management planning. The first six characters of the activity numbers are for the Job Order Number (JoN), the next three digits of the activity number willidentify the primary activity or milestone, andthe lasttwo digits the sub-activity/milestone.In the sub-activity/ milestonepositions,the numbers"0o"will always be associatedwith the prime activity number. In the conversionto the Phase IIIsystem, all existing two-digit activitynumbers will be prefixed with the number "0." "0o"will also be appended as the standard suffix. This change will allow the number of prime activities and milestones to be increased to 999., with each capable ofhaving up to 99 sub-activities/milestones. For example, the Phase IIactivity"08"(Engineering, Civil) would be converted to "oo80o,"with up to99 additional sub-activities/milestones added as "00801"through "00899," all supporting activity "00800." This numbering scheme will give the regions and the national program offices the flexibility requested in assigning subactivities andmilestones.
4. NATIONAL ACTIVITIES ASSIGNMENT. The National RTP Executive Committee has assigned eleven standard activities to be used for nationalreporting and ten standard activities to be used with genericnetworks.These are:
a. National Reporting Activities. These activities are reported monthly to headquarters in the Phase III system.
Activity Number Activity Name
00000 Project Assignment 01700 Material Avail Plant 02500 SitePreparation 03700 Telecomm Available 04100 Material Avail Elect 04600 Electronic Installation 06000 Operations Maintenance Training 07000 AirTraffic Controller Training 08000 JointAcceptanceInspection (JAI) 08200 Commissioning 08300 Service Available
b. Generic Network Activities.Genericnetworks with resources with the activities listed will be available with the Phase III software for all major programs.
APPENDIX 3. RTP STANDARD ACTIVITIES (CONTINUED)
Activity Number Activity Name
00000 Project Assignment 00800 Engineering Civil 01000 Engineering Electronic 01700 Material Avail Plant 02100 Construction 03700 TelecommAvailable 04100 Material Avail Electronic 04400 Installation 08000 JointAcceptance Inspection 08200 Commissioning 08300 Service Available
5. STANDARD RTP ACTIVITY AND MILESTONE LIST. The following are standard activities and milestones with their definitions:
Activity Number Activity Name Activity Definition
00000 Projectassignment The process which beginswith headquartersfunding available in the region ends with the project assignment to a section (includes necessary work accomplished byRAPM).
00300 Perform site survey The process of selection and evaluation of potential sites for a project.
00400 Environmentalassessment Preparation and submission of the environmental assessment report or a Finding of No Significant Impact (FONSI) report.
00800 Engineeringcivil Preparation of the civil engineering package, which may also include contract submission and award.
6000.49 Appendix3
RTP STANDARD ACTIVITIES (CONTINUED)
RTP STANDARD ACTIVITIES (CONTINUED)
APPENDIX 3.
Site selection/ acquisition
Engineering electronic
The process to conduct reviews, analyze test data, conduct cost/benefitstudies, and approve a site selection.
The process of preparing the engineeringpackage which will cover all electronic equipment installation requirements.
The date major plant
Material available plant
Construction contract procurement
Plant construction
Partial JAI
site preparation
system components are expected tobe delivered to the installationlocation.
The process that begins whenengineering submits the procurement request to the Contracts Division for processing and ends with contract award.
The process of physical construction,starting with the Notice to Proceed, and ending with the Contractor Acceptance Inspection.
The joint acceptance betweenthe responsible sectormanagerand the F&E installation office of a portion of the total project. Normallyconducted at the completion of the plantconstruction.
The process of preparing the facility area in order to begin installation of electronic equipment.
6000.49 Appendix3
APPENDIX 3. RTP STANDARD ACTIVITIES (CONTINUED)
APPENDIX 3. RTP STANDARD ACTIVITIES (CONTINUED)
Telecommunications
Material available electronic
FAA electronic installation/checkout
Electronic contractor installation
Electronic contractor test and acceptance
OperationsMaintenance Training
Air Traffic Controller Training
The planning and work availabilitynecessary to provide functional telecommunications at the installation location.
The date major electronicsystem componentsare expected to be delivered to the installationlocation.
The process of performing the tasks associated with the installation and checkout of equipment by the FAA installation personnel.
The time needed by a "turn-key"contractor toinstallasystem or specificequipment.
The process of testing the equipmentinstalled by contractors and conducting the acceptance checks.
Projects the time required to train and certify the work force needed to maintain the finished facility
Projects the time required to train and certifythe AT work force needed to operate the new equipment or facility.
6000.49 Appendix3
APPENDIX 3.
RTP STANDARD ACTIVITIES (CONTINUED)
RTP STANDARD ACTIVITIES (CONTINUED)
JointAcceptance Inspection(JAI)
Commissioning
Serviceavailable
Decommission/equipment removal
Projectcomplete/ capitalization
The joint acceptance between the responsible sector managerand the F&E installation office to formally transfer a completed installation to the sector.
The process that starts at JAI and ends with the commissioning Notice to Airmen (NOTAM) being sent by the acceptingAF sector office.
The processof returninga commissioned facility to service after the JAI is completed.
Theprocessthat starts with the decommissioning of a facility and finishes with equipment removal anddocumentation.
Used to show the end of a decommissioning project, this activity will also be used to show the completion of project capitalization.
APPENDIX 4. FACILITY CODING
APPENDIX 4. FACILITY CODING
1. The RTP will use the facility contractions as shown in Order 1375.4 as a common standard. There are certain exceptions. RTP users may use the facility type "Various" or "Miscellaneous" provided the facility is not turned over for maintenance. The F&E facility codes instrument landing system (ILS), microwave landing system(MLS), and visual navigational aids(VISAIDS) are still authorized as long as the specific facilities that make up an ILs, MLS, or VISAID are entered into the headerrecord.
2. The following figuresgive the specific facility types that could be establishedundereach of these specific headings.These project/facilityrelationships willalso beadded to the facility table and a validation routine will be initiated whenever a facility type is entered in the header fields. This will preclude erroneous entries.
3. In addition, a two-position field has been provided to accommodate a coding structure required by Aop-300 toshow the specific action taken by the GNAS or ARTCC sector offices to dispose of equipment replacedin a F&E project. The AF sectors willbe responsible for entering data in this fieldin the multi-user module.
FIGURE 1. STANDARD INSTRUMENT LANDING SYSTEM
FIGURE 1. STANDARD INSTRUMENT LANDING SYSTEM
ILS - Standard Instrument Landing System (All components may not be requiredfor individual systems.)
LOC GS OM MM IM (Localizer) (Glide (Outer (Middle (Inner Slope) Marker) Marker) Marker)
LMM LOM FM LDA (Compass (Compass (Fan (Localizer Locator Locator Marker) Directional at MM) at OM) Aid)
ILSP - Instrument Landing System-Partial
LOC OM LOM (Localizer) (Outer (Compass Marker) Locator at OM)
6000.49 4/14/95 Appendix 4
APPENDIX 4. FACILITY CODING (CONTINUED)
APPENDIX 4. FACILITY CODING (CONTINUED)
FIGURE 2. MICROWAVE LANDING SYSTEM
MLS - Microwave Landing System
MLSA MLS MLSF MLSBA (MLS (MLS (MLS (MLS Azimuth) Elevation) Flare) Back Azimuth)
MLSD MLS Precision Distance Measuring Equipment
FIGURE 3. VISUAL NAVIGATIONAL AIDS
VISAIDS - Visual Navigational Aids
FIGURE 3. VISUAL NAVIGATIONAL AIDS
ALS ODALS SALS MALS Approach Omni- Shortened Medium-Intensity Lighting Directional ALS ALS without System ALS Sequence Flashers
SSALS SSALR RAIL MALSR Simplified SSALS with Runway MALS with Shortened Alignment Alignment RAIL ALS Indicator Indicator Lights
REIL LDIN GDL ARBCN Runway Lead-in Guidance Airway Beacon End Lights Lights Identifier Lights
VASI PAPI visual Approach Precision Approach Slope Indicator Path Indicator