Order 1811.1 System Req'mnt Statement/acquisition Authorization for Second Generation Vor/vortac System
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Text read by OCR from a scanned file (3 of 10 pages). Check the original, as some words may be misread.
ORDER DEPARTMENT OF TRANSPORTATION
ORDER DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION 1811.1
SYSTEM REQUIREMENTS STATEMENT/ACQUISITION AUTHORIZATION FOR SECOND SUBJ: GENERATION VOR/ V O R ~ C SYSTEM
i 1. SYSTEM REQUIREMENT. Replacement of the electronic portion of existing i VORTAC navigation system with improved hardware i s c e r t i f i e d a s a valid System Requirement. This improved hardware s h a l l be based upon a single design concept that w i l l permit a revised remote maintenance monitoring methodology t o reduce the t o t a l operating and support cost of providing necessary a i r navigation services t o the aviation community through the year 1995. This c e r t i f i c a t i o n is granted subject t o the implementation parameters s e t forth i n Section 8 of t h i s Statement.
FEDERAL AVIATION ADMINISTRATION 1811.1
2. SYSTEM DESCRIPTION. A i r navigation service is provided i n the CONUS portion of the National Airspace System (NAS) by the VORTAC System. The Lery high frequency omnidirectional range (VOR) serves t o define the
basic route structure f o r a l l en route, t r a n s i t i o n , and terminal a i r - space. The t a c t i c a l a i r navigation system (TACAN) provides bearing *and distance information t o the military user. Through combining the two systems i n t o VORTAC, there i s bearing and distance information provided t o c i v i l and military a i r c r a f t , thus permitting compatibility between the two d i s t i n c t users f o r operation throughout the NAS. There a r e now over 900 VOR, over 700 TACAN, and approximately 20 Distance Measuring Equipment (DME) f a c i l i t i e s commissioned i n the NAS.
3. BACKGROUND. The f i r s t VOR was commissioned more than 30 years ago; the newest half of the s t a t i o n s has been operating f o r nearly 15 years. The VOR became an international ICAO standard i n the e a r l y 1950's. DME was introduced and became a national and international standard i n the l a t e 1950's. TACAN became the DOD standard i n the l a t e 1950's and was principally deployed throughout the NAS i n the e a r l y t o mid-1960's.
Operational and performance requirements f o r the c i v i l vOR/DME a r e outlined i n FAA Advisory Circular 00-31 and ICAO Annex 10. Maintenance requirements a r e provided i n FAA Order 6790.4A. Military operational and performance requirements a r e compatible with the c i v i l definitions.
The present vOR/TACAN transmitters, monitors, and auxiliary equipment a r e primarily of vacuum-tube design. Older equipment has been modified over the years; several equipment buys have been made and changes completed. A s a r e s u l t , equipment con£ iguration lacks standardization. The a v a i l - a b i l i t y of p a r t s and tubes has declined and, i n many instances, they a r e
Distribution: W- 1 (MINUS WEMIRDIAFIATI FS/ BU/VP/SP ) Initiated By: AAF-410/ASP- 120 wEM/RD/AF/AT/FS/BU/VP/SP-2 ; RATj'AF-2; NC-1; R-l
obtainable only by special procurement. This is especially applicable to that group of approximately 550 VOR transmitters manufactured in the mid-1940's (procured 1943-1946) and over 400 additional transmitters put
into service by the mid-1950's. The necessary reliability and availabil- ity of facilities using this equipment continues to be obtained only by substantial maintenance effort at a correspondingly high maintenance and support cost.
4. RELATED FACTORS
4. RELATED FACTORS
a. The Congressional Appropriations Committees have indicated that they do not intend to consider funding a "proliferation" of navigation systems until the Department of Transportation "addresses and justi- fies the need for these systems within the context of a meaningful national plan for navigation." The Committees consider the VORTAC system among these navigation systems.
b. The United States Government has a commitment to ICAO to operate and maintain the VOR/DME system for civil users until 1985.
c. There is an investment of roughly $1 billion in airborne avionics
related to the VOR/DME system. The Federal investment in the ground- based VORTAC system has been estimated at approximately $500 million. ;
d. There are currently no plans to replace the nationwide VOR/VORTAC system with any other navigation system. Experience has shown that even if a new navigation system were chosen now, it would take from 10 to 15 years to fully implement. This includes time to plan the system, procure and install the equipment, and have air- craft owners install new receivers. The replacement of the VOR/VORTAC system with solid-state equipment would be fully amortized and permit the accrual of additional savings in operation and maintenance prior to full implementation of any new system.
e. Almost all of the current VOR/VoRTAC ground systems use vacuum-tube
hardware at least 15 years old, much of it 30 or more years old. It
is highly manpower intensive, expensive to maintain, and increasingly difficult to support logistically. If this replacement program is not undertaken, a substantial capital investment will be required merely to sustain the existing system in operation, without an opportunity to realize the long-term benefits of manpower and other cost savings available in a solid-state equipment environment.
f. This System Requirement Statement applies to a program for which pre-
liminary implementation decisions have already been made by FAA management. Testimony and background information has been presented
to Congressional Appropriations Committees to support the initial funding request included in the agency FY 1978 budget submission.
Page 2 - Par 3
5. OPTIONS. Four viable alternatives for continuing to provide necessary air navigation services to the aviation community were considered in the light of projected economic growth, operational patterns, and other related factors. Basically, these alternatives are:
a. Continue operation of the VORTAC system as presently deployed using
existing equipment;
b. Retain essentially the current VORTAC system with partial replacement of older equipment with solid-state equipment of current designs;
c. Replace the entire VORTAC system with solid-state equipment having
increased reliability and maintainability, and implement a remote maintenance monitoring system; or
d. Phase in a new navigation system.
6 . COST/PAYOFF ANALYSIS. Since no plans or decisions have been made yet to replace the VOR/VORTAC system and because complete implementation of any new system would be 10 to 15 years in the future, no economic analysis was made of Option 5d.
An investment analysis did compare partial and complete replacement of
the VORTAC system with continuation of the present system. This analysis, which considered total investment cost and projected operations and maintenance (OCM) savings, showed that complete replacement with solid- state equipment incorporating a remote maintenance monitoring system is the most viable of the three remaining options.
Based upon the figures contained in the March 21, 1977, AAF-410 letter, Second Generation VORTAC CostIBenefit Study, complete replacement over four years would require an F&E investment of $104 million and $4.5 million in retraining expense; this investment in new VOR/VORTAC systems would ,
save 58% of current Operations and Maintenance costs, This combination of investment and cost savings generates a rate of return of 11.1% if the useful life of the system is 15 years; the rate of return increases to 13.6% if the useful life is extended to 20 years. This is higher
than the 10% rate of return used by OMB as a guide for investment decisions.
This rate of return could fall below 10% as a result of: (a) significant increases in FCE cost of equipment; or (b) significant decreases in projected O&M savings; or (c) a more limited combination of these factors. Appendices A and B of this statement identify specific dollar levels for both investment (FCE and retraining) and O&M saving levels at which the rate of return drops below 10%. These levels are shown for anticipated
useful equipment lives of 15 and 20 years.
Par 5 Page 3
7. CONCLUSIONS
7. CONCLUSIONS
There is a serious congressional concern about the apparent "prolifera- tion" of navigation systems. This concern should be satisfied by the Department of Transportation with a new meaningful National Plan for Navigation (NPN), which will address long-term roles of the various
candidate systems in fulfilling the navigation needs of all modes of transportation, the national defense, and providing related communi- cations capabilities. Thus, a phase-in decision for a new navigation system for the post-1985 time frame cannot be made until after the new, revised National Plan for Navigation is promulgated.
Based upon the commitment to ICAO for VORIDME, the substantial invest- ment in the various components of the VORTAC system, and the length of
time that would be needed to phase in a new navigation system, it is very unlikely that the VORTAC system could be phased out of the NAS before approximately 1995 regardless of its long-term role.
The best available cost/payoff analysis clearly shows that complete replacement of the VORTAC system with solid-state equipment and imple- mentation of a remote maintenance monitoring system will produce the best return on investment of the three viable alternatives for continued operation of the VORTAC system through 1995. Remote maintenance monitoring for certification is a proven technology presently being utilized at selected Remote Control Air-Ground (RCAG) sites.
The costlpayoff analysis indicates that a higher rate of return on
investment will be produced by a shorter implementation period of 3 years than for a 1ong.implementation period of 4 or 5 years.
There are no potential rulemaking actions as a result of implementing this program, since there will be no change in the navigation service provided to the user.
Implementation of this program will have no distinguishable impact upon NAS users, because the radio navigation signals provided will be unchanged. Thus, present avionics can continue to be used.
There will be no environmental impact as a result of implementing this program, since all new equipment will be housed in existing structures.
8. IMPLEMENTATION PARAMETERS. This System Requirement for replacement of the VORTAC system is certified subject to the implementation parameters noted below. In the event that any of these parameters cannot be met.during the
implementation of this program, the program sponsor will provide the System Requirements Group (SRG) with an assessment of the impact of the deviation on the continued validity of this System Requirement.
a. The solid-state equipment must meet the present system performance
standards of FAA Advisory Circular 00-31 and ICAO Annex 10.
Page 4 Par 7
b. The r a t e of return on the investment s h a l l continue to meet or exceed
the OMB 10% guideline. The combinations of the amount invested over a 4-year period and the level of O&M savings that must be achieved i n order to meet or exceed t h i s 10% r a t e of return standard are shown i n Appendixes 1 and 2 . Two points on 20-year project l i f e curves m e r i t special attention; i f the F&E investment for the program is held to $104 million and one-time training cost remains a t $4.5 million, the t o t a l O&M cost savings cannot f a l l below 45% and still meet t h i s rate-of-return guideline. On the other hand, i f a l l anticipated O&M cost savings a r e achieved (58%), then t o t a l program investment (both F&E and retraining) can grow t o $141 million without having the r a t e of return f a l l below 10%.
c. A site-by-site evaluation s h a l l be made t o ensure that c i v i l and military requirements for VORTAC service a r e still valid.
d. Assessments w i l l be conducted by the program sponsor a t appropriate milestone points t o ensure that the estimated t o t a l investment does not exceed the maximum allowable cost for the projected level of O&M savings. As a minimum, these reviews should be made when the Acquisition Paper is submitted to TSARC, a t contract award time, and when successive budget-year increments a r e proposed for addition to
the i n i t i a l program.
e. The program sponsor s h a l l assure that arrangements for providing the necessary l o g i s t i c support capability, training, etc., s h a l l be made concurrent with acquisition of the prime mission equipment.
f . A,cost-savings verification plan s h a l l be included a s part of the
Implementation Plan for the Second Generation VOR/VORTAC systems. For t h i s savings verification plan, early installations s h a l l be chosen so that a l l aspects of the new maintenance philosophy can be tested. The target date for completion of t h i s savings verification test s h a l l be 10 t o 15 months a f t e r the l a s t specified test site is installed.
9. KEY MILESTONE EVENTS. For planning and control purposes, the following dates have been established a s program goals. The SRG s h a l l be advised by the program manager/program off i c e of any revisions t o these dates.
a. Acquisition Paper t o TSARC October 1977
b. Completion of Implementation Plan December 1977
c. Contract Award ( i n i t i a l increment) June 1978
Par 8 Page 5
. REFERENCES. Initial Cost Analysis of the Second Generation VORTAC System,
Staff Study by C. J. Combs, ASP-120, September 9, 1975; Economic and Performance Analysis of the Second Generation VORTAC, by A. N. Joglekar,
the MITRE Corporation, March 1976; Analyses, dated March 21, 1977, by Chief, Navaids Branch, AAF-410, Subject: Second Generation VORTAC Cost/ Benefits Study; FY-78 Budget Item 4a(3) (Replacement VOR/VORTAC Systems); H. R. Report No. 94-1221, "Department of Transportation and Related Agencies Appropriation Bill, 1977 ," and related hearings on H. R. 14234;
Senate Report No. 95-268, "~epartment of Transportation and Related Agencies Appropriation Bill, 1978;" and related hearings on H. R. 7557.
11. ACQUISITION AUTHORIZATION.. This Acquisition Authorization for the Second Generation VORTAC does not address the question of optimum implementation strategy in depth (except in terms of maximizing return on investments) for the following reasons:
a. Second Generation VORTAC does not represent any change in service provided to the user.
b. It does not involve any change in procedures within the NAS.
c. It does not involve any changes in rulemaking.
d . It does not involve any new or changed equipment requirements for
the users.
Accordingly, the details of optimum implementation strategy are to be addressed in the Implementation Plan scheduled for completion in December 1977.
Authorization is granted for that system and program, as identified herein, to move into an implementation phase as defined in Order 1810.1, "System Acquisition Management."
w ~uehtin S/ Taylor / - Deputy Administrator .
Page 6 Par 10
APPENDIX 1
APPENDIX 1
1811 1 Appendix 1
Rate
0 f Retur
(in
10% 20% 30% 40% 50% 60% 7 0% 80% O&M Savings
Page 1
Rate of Returd (In %)
18.0
17.0
RELATIONSHIP BETWEEN RATE OF RETURN AND TOTAL INVESTMENT 9/6/77
20-Year Project Life
16.0
15.0
14.0
13.0
12.0
Assumptions; Four-Year Implementation Period 58% O&M Cost Savings
RELATIONSHIP BETWEEN RATE OF RETURN AND TOTAL INVESTMENT 9/6/77
15-Year Project Life
11.0
10.0
9.0
8.0
7.0
6.0
5.0
4.0 Page 1
80
100
As an illustration, if the assumed 58% O&M cost savings are achieved and if the equipment has a useful APPENDIX 2
life of 20 years, total investment can increase to $141 million and still generate a 10% rate of return on the investment.
4.0 Page 1
120 140 160 *Total Investment includes both F&E and Training Appendix 2 1811.1
Total Investment* (In Millions..of Dollars)