ORDER WP 1800.29 11/1/92 U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION

SUBJECT: Configuration Management of the R-2508 Rehost Computer System

1. PURPOSE. This Order establishes procedures for coordination, implementation, and Configuration Management of emergency, routine, and future system modifications associated with the Rehost Computer System (RCS) deployed at High Desert TRACON.

2. DISTRIBUTION. This Order is distributed to Air Traffic Division (AWP-500), Airway Facilities Division (AWP-400), the Regional Configuration Control Board, Rehost Configuration Management Board, LAX Sector Manager, High Desert TRACON (E-10) Air Traffic/Airway Facilities Managers, the R-2508/DOD Complex Control Board, Naval Air Warfare Center - Weapons Division (NAWC-WD), China Lake, and the Air Force Flight Test Center (AFFTC), Edwards AFB.

3. BACKGROUND. The Rehost automation replacement system for High Desert TRACON is authorized by the Associate Administrators for Air Traffic/Airway Facilities, AAT/AAF-1. With the Rehost system authorization came the responsibility of maintaining all aspects of this system within the Western-Pacific Region (AWP). Software and Hardware Configuration Management (CM), which includes day-to-day maintenance and future upgrades, are tasked to this Region. This Order was developed to provide the necessary procedures for defining, assigning, coordinating, developing, and maintaining the Rehost computer systems Software/Hardware through its life-cycle.

4. EFFECTIVE DATE. This Order is effective on 11/01/92.

5 RESPONSIBILITIES.

The RCCB is comprised of a cross section of FAA Region and DOD expertise as identified in the RCCB Charter Paragraph 3, "CCB PARTICIPANTS". The RCCB shall:

(1)Maintain configuration control of the Rehost automation replacement system baseline under the direction/authority of AWP-400/500.

(2) Ensure compliance with national and local policy.

Distribution: AWP-400/500/420/450/460/510/910/920/930/SEIC/ E10-1/E10 AFSFO/LAX AFS Initiated by:AWP512.2

WP 1800.29 11/1/92

(3) Ensure that NAS-MD-001 accurately reflects the baselined configuration identification documentation drawings for each configuration item under RCCB control.

(4) Ensure that briefings conducted to the RCCB are IAW procedures set forth in this directive. When Rehost Change Proposals (RCPs) are to be reviewed by the RCCB, ensure packages are in compliance with Section 6 (a), "Documentation Submission". (Note: Appendix 1 contains a sample RCP and instructions for use.)

(5)Have final decision and approval authority over the Rehost system baseline. This includes baseline Configuration Control Decisions (CCDs) recommended by the RCMB.

(6) Ensure the RCMB maintains Rehost system configuration/ Maintenance Databases, Drawings, and Documentation.

(7) Ensure that Appendix A to the AWP RCCB Charter which lists the Rehost CIs remains current.

(8) Perform other duties as described in the RCCB Charter.

b. From Critical Design Review (CDR) until Final Operational Capability (FOC), the Rehost Transitional Configuration Management Board, Comprised of Department of Defense (DOD), FAA Air Traffic (AT) and Airway Facilities (AF) Program Managers, Contractor, and DOD/FAA field personnel, is responsible for all Configuration Management activities identified in Paragraph 5.(a) and 5.(c).

In addition, the Rehost Transitional Configuration Management Board shall be responsible for the formulation of a Memorandum of Understanding (MOU) to be signed by the FAA and DOD. This MOU shall address interagency responsibilities for:

(1) Maintaining configuration control of all Rehost systems, FAA and DOD.

(2) Depot/supply facilities and procedures between the three Rehost sites.

(3) Representation of FAA/DOD personnel on the RCMB.

(4) Upgrades, enhancements, modifications and the paperwork processing process.

Page 2 Par 5a (3)

11/1/92 WP 1800.29 (5) Technical Center activities that will be conducted at High Desert TRACON.

(6) Administration of hardware and software maintenance contracts. (7) Additional areas as determined by the Transitional CM Board. Note: Figure 1, depicts the Rehost Configuration Management Team relationships. C. At FOC, the R-2508 Rehost Configuration Management Board (RCMB) shall be established to assist the RCCB in Rehost system Configuration Management activities. Configuration Management activities performed by the RCMB are under the direction of the RCCB. This board shall be comprised of Western-Pacific Region representatives (AWP-422/512), LAX Sector representatives, R-2508/DOD representatives, FAA High Desert TRACON AT/AF Managers, and Ad Hoc members as deemed necessary. The RCMB shall:

(1)Screen all RCPs, RPTRs, and RHDRs for duplication and enter into the Configuration Management Database.

(2) Ensure Rehost Change Proposal packages are completed and submitted in accordance with Section 6 (a), "Documentation Submission". (3) Make recommendations for CCDs on all Rehost RCPs. RCPs approved by the RCMB shall be referred to the RCCB for final determination. (4) Ensure the tracking of RCPs in the Rehost Configuration Management Database and provide copies of RCPs to the originator. (5) Conduct briefings to the RCCB on RCPs that are referred by the RCMB.

(6) Report to the RCCB on the implementation schedule and progress of approved CCDs.

(7) Ensure the Rehost Configuration Item Database remains current. (8) Ensure all documentation changes, (i.e. drawings, handbooks, baselines), are updated and published. (9) Ensure the controlled document copies are updated. (10) Ensure the integrity of implementation, testing, and training for upgrades/modifications.

Par 5b (5) Page 3

Page

4

RCCB

RCCB

REHOST TIMELINE

REHOST TIMELINE

REHOST CDR TRANSITIONAL ORD CONFIGURATION MANAGEMENT BOARD

DOD FAA

CONTRACTOR

AFFTC SPORT

AFFTC - Air Force Flight Test Center AT/AF - High Desert TRACON Air Traffic/Airway Facilities Managers AWP - Western-Pacific Region CCB - R-2508 Complex Control Board CDR - Critical Design Review NAWC - Naval Air Warfare Center- Weapons Division ORD - Operational Readiness Demonstration RCCB - Regional Configuration Control Board RCMB - Rehost Configuration Management Board SPORT - Spacial Positioning and Optical Radar Tracking

AFFTC SPORT

V

REHOST CONFIGURATION R-2508 REP. CCB BOARD(RCMB) MANAGEMENT AUTOMATION SECTOR AT/AF E-10 E-10 LAX 422/512 460 AWP REP CHINALAKE NAWC-WD Management Team Figure 1, Rehost Configuration

11/1/92 WP 1800.29

(11) Ensure that documentation for Rehost Program Technical Reports (RPTR) and Rehost Hardware discrepancy Reports (RHDR) is maintained.

(12) Ensure that case files for system modifications are submitted in accordance with FAA Order 6032.1, Modifications to Ground Facilities, Systems and Equipment in the National Airspace System.

(13) Ensure Implementation and Impact negotiations are accomplished with the affected bargaining units.

(14) Ensure schedules for implementation are compatible with national/local programs.

(15) Prepare and maintain a Charter, approved by the RCCB, that describes in detail, the membership, responsibilities, and operating procedures of the RCMB.

(16) Other duties supporting Rehost as directed by the RCCB.

Note: Figure 2, depicts the flow for processing a RCP, RPTR, and RHDR from problem/suggestion to implementation/close-out.

d. The High Desert TRACON Automation Staff consists of AT Automation Specialists (AUS) and AF System Performance Specialists (SPS) and are responsible for day-to-day maintenance and long-term system support of the Rehost system. The High Desert TRACON Automation staff shall:

(1) Maintain the software/hardware of the Rehost system.

(2) Implement and disseminate modifications that are approved by the RCMB/RCCB IAW FAA Order 6032.1.

(3) Forward all RPTRs, RHDRs, and RCPs to the RCMB for processing.

(4) Provide technical expertise to the RCMB for the preparation of RCPs, briefings, and CCD appeals.

(5) Conduct testing of all code changes to ensure the integrity of the patch/source code.

(6) Report to the RCMB on deployment/testing schedules.

Par 5c(11) Page 5

Page

9

SOFTWARE

PROBLEM OTHER

PROBLEM OTHER

HARDWARE

IMPLEMENT

CHANGE

NCP - NAS Change Proposal RCCB - Regional Configuration Control Board RCMB - Rehost Configuration Management Board RCP - Rehost Change Proposal RHDR - Rehost Hardware Discrepancy Report RPTR - Rehost Program Technical Report

RPTR

RCP

RHDR

RCCB STATUS BRIEFINGS

RCCB STATUS BRIEFINGS

NO

RCCB YES PRESENTATION

ORIGINATOR ADVISED

YES

CM DATABASE

DUPLICATE OR NO CLOSED ITEM

CLOSE NO RCP, RPTR OR RHDR

YES DRAFT NCP

NO

WP 1800.29

PREPARE DOCUMENT PACKAGE

BASELINE ACTION CHANGE RCMB YES Change Implementation Flow Chart Figure 2. Rehost Configuration Management

11/1/92

PREPARE DOCUMENT PACKAGE

11/1/92 WP 1800.29

(7) Maintain all Rehost system documentation, (i.e. drawings, handbooks, baselines, Configuration/Maintenance Databases).

(8) Perform emergency modifications to resolve RPTR/RHDR issues which affect system stability, reliability, operational suitability.

e. The Department of Defense Military Operating Units at (China Lake and Edwards AFB) provide a technical resource base for maintaining the Rehost system. These two facilities, utilizing a smaller but identical Rehost system, operate as an extension of the main system support facility located at High Desert TRACON. Input for future system enhancements as well as assistance with code development, testing, shakedown, documentation and database maintenance, are areas where technical expertise can and should be provided. When required, and with R-2508/DOD/FAA concurrence, duties identified in Section 5 (d) above, can and should be tasked to one or both of these facilities.

6. PROCEDURES.

a. Documentation Submission. It is essential that reports and documentation on all modifications/proposals be standardized. Modifications/proposals must be assembled in a manner which provides consistent, readable documentation which the RCMB/RCCB and/or other Divisions may reference. To provide this standardization, a development package shall be maintained for each proposal/change. This development package shall be placed in a binder/folder with six sections separated by tabs containing the following information:

1. General. - This section contains all correspondence on the development including proposal/change documentation affected, initial draft proposal/change material (i.e. RPTR/RHDR), and operational impact statement.

2. Case File. - This section shall contain a complete case file (Rehost Change Proposal) accurately describing the change) Note: As needed, substitute RHDRs/RPTRs for Case File in this section and tailor the required information as needed.)

3. Operational Statement. - This section reflects in layman terms the operational utilization of the modification.

4. Program Data. - This section contains five subsections:

(a) Explanation of the proposed change.

(b) List of all impacted processes.

Par 5d (7) Page 7

WP 1800.29 11/1/92

(c) Control/Data Flow diagrams of the change, including entry and exit.

(d) Documents that require changes, i.e. System/Segment Design Documentation, Functional Specifications, Baselines, etc.

(e) List of all changes to source code including comments field.

5. Test Report. - This section shall contain five subsections:

(a) Test Plan. The test plan shall consist of defining the functions that are to be tested and the test methods to be employed in verifying that the modification properly accomplished these functions. This requires stating the coordination/application of test tools, data methods and logic in conjunction with hardware required to achieve the desired results of each function. The test plan shall specify the methods that will be employed to:

(1) Guarantee the integrity of the system.

(2) Test for possible degradation of other functions and interfaces.

(3) Verify applicable format and validity checks are made and appropriate error indications occur.

(b) Test Design. Test data shall be devised to exercise and verify all the functions listed in the test plan. This test data shall be converted to live and/or simulated test scripts, depending on the modification. The test design shall be compatible with currently available test tools as far as possible.

(c) Test Conduct. Testing shall be conducted as a process of verifying function, finding and correcting errors/discrepancies and recording the test actions employed. This process shall continue until all functional aspects have been tested and discrepancies have been resolved. Two levels of testing shall be employed to verify the accuracy and functional impact of the modification.

(1)The first level shall be devoted to determining that coding is correct and that all intended functions of the modification are properly accomplished. It is expected that several iterations of this level would be required to test the various functional circumstances and interactions involved.

Page 8 Par 6a(4) (c)

11/1/92 WP 1800.29

(2) The second level of testing consists of exercising the system through conduct of an appropriate baseline test. This test must verify system integrity as a result of implementing the modification.

Additionally, a test shall be employed to determine the impact of the modification on display data. Particular emphasis shall be given to verification of target location. Specific checks shall be made to detect any displacement problems that could result in an invalidation of separation standards. Further checks shall be made to validate track and target correlation in the various possible track mode/radar return combinations.

(d) Test Analysis.

(1) Analysis shall be accomplished after each test effort and should be completed before the next step is taken.

(2) Other required tests shall be analyzed manually or with the use of any available tool or method as deemed appropriate by the facility automation staff.

(e.) Test Conclusion. The test conclusion contents and format will depend on the complexity of the modification being tested. This subsection shall provide a record of the completion of each test. It shall contain conclusions and recommendations with supporting analysis and data based on the results of the testing. The test conclusion shall be regarded as an integral part of the documentation and shall be completed prior to approval for operational use.

6. Implementation.

(a) Technical Procedures. Special instructions required to implement the proposal/change; e.g. adaptation changes, assembly procedures.

(b) Operational Procedures. Recommended special procedures required to enable operational use of the change.

(c) Operational Training/Briefing Material. Any material required to train or brief controllers/technicians prior to implementation.

(d) Affected Documentation. Copies of all proposed changes to Rehost documentation.

Par 6a (5) (c) (2) Page 9

WP 1800.29 11/1/92

b. Presentations to the RCMB/RCCB.

1. Recommended items of information to be included in the Presentations are:

(a) RCP number and title

(b) RCP originator

(c) Affected documentation/drawing numbers and titles

(d) Synopsis of proposed change

(e) Performance/operational impacts

(f) Interface impacts

(g) Financial impacts

(h) Schedule impacts

(i) Anticipated benefits

(i) Schedule for implementation

2. Copies of the presentation materials shall be provided to the Executive Secretary by the presenter at lease one (1) day prior to the RCMB/RCCB meeting.

7. CCD Procedures.

a. RCMB Recommendations for Configuration Control Decisions.

RCPs recommended for Configuration Control Decisions shall be forwarded to the RCCB.

b. RCCB Configuration Control Decisions.

Configuration Control Decisions made by the RCCB constitutes the final approval/denial of an RCP unless an appeal is filed.

Page 10 Par 6b

11/1/92 WP 1800.29

RCCB completed CCDs shall be provided to the RCMB where appropriate entries will be made to the Rehost Configuration Management Database. RCCB approved CCDs will result in the RCMB taking the appropriate action to implement the change.

C. RCMB/RCCB CCD Procedures.

Procedures for processing CCDs by the RCMB and RCCB are located in the Operating Procedures for each organization.

d. CCD Appeal Process.

If a field organization impacted by a CCD does not concur with the decision of the RCMB/RCCB, it may be appealed by that office within twenty (20) working days after notification of the CCD. If a CCD is appealed, the RCMB and/or RCCB executive secretary shall be notified of this action.

Organizations in disagreement with the decision on an RCP may submit an appeal to the RCMB and/or RCCB or through the management chain to effect resolution. The justification for the appeal will be documented and attached to a copy of the RCP/CCD for submission to the RCMB and/or RCCB or to the next level manager.

If resolution cannot be achieved at TCMB/RCCB or management levels, the appeal may be elevated through the management chain to AWP-400/500. AWP-400/500 shall serve as the final decision authority for all appeals on the Rehost system. (The RCMB/RCCB Executive Secretary shall monitor this progress).

If the appeal is successful and necessitates a change to the RCP, an amended form shall be prepared by the organization initiating the appeal and submitted for normal change processing.

If the actions on a signed CCD are appealed and no change to the original form is required, the Executive Secretary shall revise the CCD and present it to the chairperson for signature. The revised CCD shall be annotated to indicate that it replaces the original CCD signed on mm/dd/yy date. Copies of the revised CCD shall be distributed to all who received the original, and a copy of the RCP with the revised CCD shall be attached to the minutes of the next RCMB/RCCB meeting.

Richafd R.Lien Alex Hammond Manager, /Manager, Air Traffic Division, AWP-500 Airway Facilities Division, AWP-400

Page 11 Par 7c

11/1/92 WP 1800.29 Appendix 1

APPENDIX 1

APPENDIX 1

REHOST

Change Proposal

Program Technical Report

Hardware Discrepancy Report

WP 1800.29 11/1/92 Appendix 1

REHOST CHANGEPROPOSAL For CM RCP Received Date RCP Issuance Date RCP Number Page 1 of (Please type orprintl dlearty) Use 1. RCP File Number 2. Prescreening [] REHOST CMB 3. Scope of Change [] Local Office 11. []Test

4. System Element 11Swstem {]CCS IFemux (GDP []OTHER

4. System Element 11Swstem {]CCS IFemux (GDP []OTHER

5. Life Cycle Baseline 6. Priority 7. Supplemental Change Form Acquisition: []ECR/ECP 11. [] Requirements {1 Allocated [] Normal 7a. Supplemental Change Num. Determination [ Functional j Time Critical {]Operational [] Product Üj Urgent 7b. Supplemental Change Initiation Date

8. RCP Originator 9. Originator's Organization/Office 10. Telephone Number 11. RCP Initiation Date

12. Baseline Document Type []CMP (IDD []CRISD (]ILSP []SAM (ISDD []SDP (]DWG [] S/W Lesson Plan [] H/W Lesson Plan

LISTP []ROM []SQPP USTA (ISSDD (HTD (]STD (VDD 11. 13. Baseline DocumentNumber(s) 14. CI Subsystem Designator 15. FA Type 16. Cl Component Designator

REHOST N/A []HWCI 11CSCI 17. Facility Identifier (FACIO) 13. Facllity Code (FACCODE) 19. Cost Center Code 20. Software System Version

WPREH N/A N/A 21. Title (as descriptive as passible)

22. Description: () &ldentification of the problem, (b) proposed Change, (c) intertace impact, (d) cost (including man-houis), (e) benefrts. )sohedule, (g) justification of time-critical/urgent status

actics 1 through 22 are to be completed by originator and/or CM secretarist If a block is not applicable, write N/A t ch additional sheets if necessary See current revision of the REHOST CMP for detailed completion instructions WP FORM 1800-28

REHOST CHANGE PROPOSAL RCP # Coordination

[]E10-AT [] Concur []E10-AF [] Non-Concur []SPORT [] Comments Signature: Attached UASC APPROVALS

WP 1800.29 Appendix 1

Page 2 of

APPROVAL FOR IMPLEMENTATION:

APPROVAL FOR ESTIMATING: ARH

APPROVAL FOR ESTIMATING: ARH

DOD Representative Date DOD Representative

AWP AT Representative Date [00] AWP AT Representative

AWP AF Representative Date 000 AWP AF Representative

A=Approved R=Rejected H=Held in Abeyance ROUTING CM use ONLY DATE INITIALS REMARKS

RCP Received by CM

RCP Input Into CMDB

RCP Distributed to CMB

RCP Received from CMB RCP Received by SE/TA Task Manager

RCP Estimated

RCP Approved by CMB RCP Received by SE/TA Engineering

Upgrade Available to Test Group

Upgrade Verified By Test Group

Upgrade Distributed

Upgrade Installed

Upgrade Used Operationally

Upgrade Number

RCP Item Closed

A R H

Date

Date 000

Date 000]

WP 1800.29 11/1/92 Appendix 1 INSTRUCTIONS FOR COMPLETING THE RCP

1. RCP File Number: HDT, SPORT, or ASC - REH. [to be completed by CM only]

2. Prescreening Office: During transitional, CM will always be REHOST CMB.

3. Scope of Change: Check appropriate block.

4. System Element: Check appropriate block.

5. Life Cycle Baseline: Check appropriate block.

6. Priority: Check appropriate block.

7. Supplemental Change Form: Check appropriate block.

8. RCP Originator: As appropriate.

9. Originator's Organization: As appropriate.

10. Telephone Number: As appropriate.

11. RCP Initiation Date: As appropriate.

12. Baseline Document Type: Check appropriate blocks. 13. Baseline Document Number(s): Indicate the document, drawing, or reference number(s) that define(s) how the system should respond.

14. Subsystem Designator: Always REHOST

14. Subsystem Designator: Always REHOST

15. FA Type: N/A during transitional CM.

16. Cl Component Designator: Check appropriate block.

17. Facility Identifier: Add HDT, SPORT, or ASC as a suffix.

18. Facility Code: N/A during transitional CM.

19. Cost Center Code: N/A during transitional CM.

20. Software System Version: Enter version, if known.

21. Title: Enter an appropriate, descriptive title.

22. Description - State: (a) Identification of problem. Proposed change. Interface impact. Cost (including manhours). (e) Benefits. (1) Schedule. (g) Justification of time-critical/urgent status.

Page 1 of REHOST HARDWARE DISCREPANCY Please type REPORT PE OF REPORT:[]TROUBLE TYPE OF FACILITY [] TERMINAL []IMPROVEMENT 1 2 3 4 5 6 7 8 9 CM USE SUSPECTED HWC RHDR NUMBER R E H H

REFERENCE(S) - DOCUMENT (NAME, PARA, PAGE), DRAWING, OR ATTACHMENT(S): REQUIREMENT #

REFERENCE(S) - DOCUMENT (NAME, PARA, PAGE), DRAWING, OR ATTACHMENT(S): REQUIREMENT #

TITLE PROBLEM Date (J) OCCURED AT: Time(Z) DESCRIPTION OF PROBLEM[] check if additional information is attached

WP 1800.19 Appendix 1

[] Duplicate RHDR exists

Organization []AF UAT Priority

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL

ACTION TAKEN: ASSIGNED TO:

WP Form 1800-30 (10-92)

WP. 1800.29 Appendix 1

REHOST HARDWARE DISCREPANCY REPORT

RHDR # Coordination []E10-AT [] Concur [] E10 - AF [] Non-Concur []SPORT [] Comments Signature: Attached UASC APPROVALS

Page 2 of

APPROVAL FOR IMPLEMENTATION:

APPROVAL FOR ESTIMATING: A RH DOD Representative Date 000 DOD Representative

REHOST HARDWARE DISCREPANCY REPORT

AWP AT Representative Date 000 AWP AT Representative

AWP AF Representative Date 000] AWP AF Representative A=Approved R=Rejected H=Held in Abeyance ROUTING CM use ONLY DATE INITIALS REMARKS

RCP Received by CM

RCP Input Into CMDB

RCP Distributed to CMB

RCP Received from CMB RCP Received by SE/TA Task Manager

RCP Estimated

RCP Approved by CMB RCP Received by SE/TA Engineering

Upgrade Available to Test Group

Upgrade Verified By Test Group

Upgrade Distributed

Upgrade Installed

Upgrade Used Operationally

Upgrade Number

RCP Item Closed

ARH [0]0] Date

Date 000]

Date 000

J

11/1/92 WP 1800.29 Appendix 1

INSTRUCTIONS FOR COMPLETING THE RHDR

INSTRUCTIONS FOR COMPLETING THE RHDR

TYPE OF REPORT: TROUBLE - If RHDR describes an out of specification condition.

IMPROVEMENT - If RHDR describes an improvement and does not change specifications.

TYPE OF FACILITY: Aways TERMINAL ORGANIZATION: AF or AT - Check the service of the RHDR originator.

RHDR NUMBER: Box 1, 2, 3, 4, & 5- HDT, SPORT, or ASC. Box 6, 7, 8, & 9 - Always REHH.

SUSPECTED HWC: Enter Configuration Identification number of the suspected problem.

REFERENCE(S): Indicate the document, drawing, or reference number(s) that define(s) how the system should respond.

ATTACHMENT(S): Indicate what type and number of attachments.

PRIORITY: Enter one of the fcllowing. E - Emergency is a problem that prevents a site from continuing automation activities on this system tape. H - High priority is a problem that can be procedurally handled but has an adverse effect on the system. L - All others.

TITLE: Enter an appropriate, descriptive title.

PROBLEM OCCURRED AT: Enter Julian date and Zulu time that the problem occurred.

DESCRIPTION OF PROBLEM - State: (a) The problem in detail. (b) The expected results. (c) The actual results. (d) The system configuration (if pertinent). (e) The adaptation if unique to the problem. (1) Patches that may be a factor. (g) Route: If a factor (use UDS if possible). (h) Is problem transit or duplicatable? ES The suggested patch if one is available. Any other facts considered to be pertinent. (k) The suggested source changes (if developed).

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL: As appropriate.

ASSIGNED TO: Completed by CM Secretariat.

ACTION TAKEN: Completed by CM Secretariat.

WP 1800.29 Appendix 1

REHOST PROGRAM TECHNICAL Page 1 of Please type REPORT

TYPE OF REPORT: []TROUBLE TYPE OF FACILITY [TERMINAL []IMPROVEMENT 1 2 3 4 5 6 7 8 9 CM USE SUSPECTED CSC/CSU RHDR NUMBER R EH P

REFERENCE(S) - DOCUMENT (NAME, PARA, PAGE), DRAWING, OR ATTACHMENT(S): REQUIREMENT #

REFERENCE(S) - DOCUMENT (NAME, PARA, PAGE), DRAWING, OR ATTACHMENT(S): REQUIREMENT #

TITLE PROBLEM Date (J) OCCURED AT: Time(Z) DESCRIPTION OF PROBLEM[] check if additional information is attached

[] Duplicate RPTR exists

Organization 1]1. [AT Priority

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL

ACTION TAKEN: ASSIGNED TO:

WP Form 1800-29 (10-92)

REHOST PROGRAM TECHNICAL REPORT RPTR # Coordination [] E10 - AT [] Concur []E10-AF [1 Non-Concur []SPORT [] Comments Signature: Attached []ASC APPROVALS

WP 1800.29 Appendix 1

Page 2 of

APPROVAL FOR IMPLEMENTATION:

APPROVAL FOR ESTIMATING: ARH DOD Representative Date DOD Representative AWP AT Representative Date 000 AWP AT Representative

AWP AF Representative Date 000 AWP AF Representative A=Approved R=Rejected H=Held in Abeyance ROUTING CM use ONLY DATE INITIALS REMARKS

RCP Received by CM

RCP Input Into CMDB

RCP Distributed to CMB

RCP Received from CMB RCP Received by SE/TA Task Manager

RCP Estimated

RCP Approved by CMB RCP Received by SE/TA Engineering

Upgrade Available to Test Group

Upgrade Verified By Test Group

Upgrade Distributed

Upgrade Installed

Upgrade Used Operationally

Upgrade Number

RCP Item Closed

A R H

Date

Date 00]0

Date

WP 1800.29 11/1/92 Appendix 1

INSTRUCTIONS FOR COMPLETING THE RPTR

INSTRUCTIONS FOR COMPLETING THE RPTR

TYPE OF REPORT: TROUBLE - If RPTR describes an out of specification œondition.

IMPROVEMENT - If RPTR describes an improvement and does not change specifications.

TYPE OF FACILITY: Always TERMINAL ORGANIZATION: AF or AT - Check the service of the RHDR originator.

RPTR NUMBER: Box 1, 2, 3, 4, & 5 - HDT, SPORT, or ASC. Box 6, 7, 8, & 9 - Always REHP.

SUSPECTED CSC/CSU: Enter the Configuration Identification number of the suspect module(s).

REFERENCE(S): Indicate the document, drawing, or reference number(s) that define(s) how the program should respond.

ATTACHMENT(S): Indicate what type and number of attachments.

PRiORITY: Entor one of the following. E - Emergency is a problem that prevents a site from continuing automation activities on this system tape. H - High priority is a problem that can be procedurally handled but has an adverse effect on the system. L- All others.

TITLE: Enter an appropriate, descriptive title.

PROBLEM OCCURRED AT: Enter Julian date and Zulu time that the problem occurred.

DESCRIPTION OF PROBLEM - State: (a) The problem in detail. (b) The expected results. (c) The actual results. (d) The system configuration (if pertinent). (e) The adaptation if unique to the problem. (1) Patches that may be a factor. (g) Route: If a factor (use UDS if possible). (h) Is problem transit or duplicatable? ES Any other facts considered to be pertinent. The suggested patch if one is available. (k) The suggested source changes (if developed).

ORIGINATOR'S SIGNATURE AND ROUTING SYMBOL: As appropriate.

ASSIGNED TO: Completed by CM Secretariat.

ACTION TAKEN: Completed by CM Secretariat.

Pag 10