ORDER U.S. DEPARTMENT OF TRANSPORTATION
ORDER U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION WP 1370.9
WESTERN-PACIFIC RFGION
8/29/89
jil FILE
SUBJ: AUTOMATED INFORMATION SYSTEM MANAGEMENT
1. PURPOSE. This Order establishes the Regional Computer Applications Work Group (CAwG) and the policies, approval procedures and operational parameters for ali computer applications in the Western-Pacific Region, except technical applications providing control, monitoring and evaluation, and technical data transfer within operational equipment.
SUBJ: AUTOMATED INFORMATION SYSTEM MANAGEMENT
2. DISTRIBUTION. This Order is distributeã to branch level and above in regional headguarters and (limited) distribution to all field offices and facilities in the Western-Pacific Region.
3. BACKGROUID. The Agency's Information Resources Management Plan (IRMP) currently provides a comprehensive, detaileo process for achieving objectives of the Agency's information needs. Unãer the IRP, each region has the authority to develop local systens limited by the requirement that proposed systems be submitted to AMS-l before actual development begins. This is to assure that there is no impact with existing and planned national systens and to consider the proposed system for application elsewhere in FAA. A permanent Computer Applications Work Group has been established in the Western-Pacific Region to ensure a coordinated and consistent regional program for computer applications. As requested by the Administrator, the Regional Administrator, Western-Pacific Region, has designated the Manager, Information Resource Management Branch, AP-43, as the Regional Information Resource Manager (RIP).
4. SCOPE OF APPLICATION.
a. Inclusions. This Order applies to all regional automated data systems, including the CAEG System, all regional automated management information systems, and all regional studies for the development and evaluation of possible automated systens or requirements, except as specifically excluded in paragraph 4b.
b. Exclusions. This Order does not apply to national systems, including the National Airspace Systen (NAS) of which the real-time Air Traffic Control Systems and Remote Maintenance Monitoring Systems are a part, the Automated Flight Inspection System, and F&E developmental work in support of the NAs. However, this Order does apply to applications of any data drawn from these systems for use in a Western-Pacific Region automated system or for administrative purposes.
Distribution: A-X-3; A-FOF-O (LID) Initiated By: AWP-40
FAA Form 1320–1.1 (6-80) Supersedes previous edition
5. POLICY.
a. General Management Policies:
(1) The Western-Pacific Region will develop and utilize automatic data processing (ADP) systems whenever such use is expected to result in improved performance, effective management of operations, or specific cost savings or cost avoidance.
(2) The Western-Pacific Region will provide central management overview through the Information Resource Manager and the Regional CAWG of all regionally based ADP activities to assure adequate consideration of objectives and to raximize utilization of available resources.
6. COMPUTER APPLICATIONS WCRK CROUP (CAWG) MEMBERSHIP. The CAHC shal1 be COMprised of one representative from each of the Regional Office Staff/Divisions, Office Information Resource lanager (OIRi). The CAwG will be co-chaire by the Supervisor, Programing and Analysis Section, AwP-43A, and Supervisor, Technical Support Section, AWP-43P.
7. RESPONSIBILITIES.
a. The Regional Information Resource Manager (RIRM) will:
(1) Act as the Regional Administrator's designee in the overall management, planning anì control of inforiation and data processing activities. Exception: The Regional Administrator retains approval authority for the annual Information Resource lianagement Plan (IRF).
(2) Review and approve/disapprove all hardware and software procurements for aaninistrative use within the Western-Pacific Region.
(3) Appoint special committees made up of selected CAwG members and repre sentatives of concereā organizations for major projects.
(4) Convene the Office Information Resource Managers (OIRMs) when deemed necessary to review proposes computer applications. As a minimum, the OIRi!s will review tie annual upiate to the Regional IRiiP (see paragraphs 7b (7) and 7c(6)).
(5) Establish a position within the IRM Branch to serve as IRMP Project Manager in the Western-Pacific Regicn.
(6) Approve/disapprove proposed computer applications referred to him/her by the IR1 Project Manager and/or CAWG or refer such items to the OIRM.
(7) Approve interim changes to the regional IRMP approved by the Regional Administrator.
Page 2 Par 5
8/29/89 WP 1370.9
(8) Designate the Supervisor, Programming and Analysis Section, AWP-43A, and the Supervisor, Technical Support Section, AwP-43E, to serve as co-chairpersons of the CAW Group.
b. The IRMP Project Manager will:
(1) Coordinate all regional activities related to the IRMP, both national and local.
(2) Serve as the Assistant RIRM, acting on his/her behalf on IRM matters.
(3) Monitor, coordinate and control the development, installation and/or use of approved harâware anā systen: applications in the Western-Pacific Region, incluaing contract activities. Also responsible for determining related space, furniture and utility requirements.
(4) Recommend approval/disapproval to the RIRM of requests for hardware, software and non-local ADP applications.
(5) Provide equipment and system installation status reports and/or briefings to the Regional Administrator, division and staff managers on a quarterly basis.
(6) Update annually and submit to the RIRM the Western-Pacific Region's IRiP. Update anã subnit as required to AMS-l the Agency's IRiP to support the national system plan for implementing the IRMP. The Regional IRMP and Agency IRMP will be updated in coordination with all division and staff offices CAWG members.
(7) Assist division and staff offices in development of buaget requirements for automated equipment.
c. The Office IR: (OIRi:) will:
(1) Meet as scheduled by the RIRí.
(2) Review all proposals for the acquisition, installation, or expansion of computer hardware, software and applications referred to them.
(3) Have final office review authority for all referred office computer applications.
(4) Notify the CAWG chairperson of approvals, deliberations, and/or denials.
(5) Obtain approval/disapproval from the Regional Administrator on issues that have a significant budgetary impact on operations.
Par 7a(8) Page 3
(6) Serve as the regional review board for the annual update of the Regionai IRiP. Make recommendations for program changes/improvements to the RIR.
d. The Regional CAWG will:
(1) Assist the IRM Project Manager in updating the regional IRMP.
(2) Evaluate the justification for the acquisition and utilization of hardware and software for regional office andfield office or facility administrative type automation systems.
(3) Identify anā review specifications and funding reguirements for such applications cited in d(2) above and make recommendations on ail proposals.
(4) Assist in installing or arranging for installation of approved hardware, software and applications.
(5) Provide or arrange for operational assistance to equipment operators, inclucing developrent of new processes and procedures and the iāentification of general and specific training requirements.
(6) Coordinate with counterparts in other regional offices, centers and the Headguarters office to be aware of and knowledgeable of their use and applications of administrative autonation systens.
(7) Recormend regional priorities and goals for office automation to the IFIi.
(8) Establish and maintain a network of regional and field representatives, with sufficient expertise to assist CAWG members in program activities. Representatives will serve as focal points, providing and receiving input on program planring, implementation and evaluation. A list of regional and field representatives will be provided to the RIRi. The list should include the repre sentative's name, organization, facility address, telephone number and a brief description of specific expertise.
(9) Develop and maintain a reporting system to keep the RIRM/OIR! division and staff managers informed of progress, cost savings, cost avoidance, and any significant problens with hardware, software, utilization or security.
Page 4 Par 7c(6)
8/29/89 WP 1370.9
(10) Assure that regional office developed security plans, including risk assessments and system reviews, as required by FAA Order 1600.54B, FAA Automated Information Systems Security Handbook are applicable so as to minimize the risk of fraud, waste, theft or abuse.
(11) Be responsible for the dissemination of information to interested parties.
(12) Attend RIRM and/or OIRM meetings as appropriate.
e. Member, CAWG will:
(1) Coordinate all activities related to the IRMP, both national and regional, within his/her division or staff office.
(2) Review "local" (see paragraph 7f(2)) facility computer applications to determine if they can be used elsewhere in the division or region. Evaluate and make recommendation of intra-division applications.
applications to the OIRM. (3) Submit requests for hardware, software and "non-local" system
(4) Provide the CAWG data on local camputer applications for possible use throughout the region or agency.
(5) Serve as the division or staff office representative on the CAWG, and the Western Pacific Cammunications Network (WPCNET) Group. The IRMP Project Manager serves as the CAWG/WPCNET representative for staff offices not otherwise represented.
f. The users will:
(1) Use equipment and software applications consistent with national and regional system policies and procedures.
(2) Develop innovative local applications to increase productivity. ("Local" is defined as "use within a single office or facility" that does NOT require communication with or through the Data General MV/15000 host camputer nor the regional backbone Personal Camputer (PC) Local Area Network (LAN).
(3) Operate equipment and use information within prescribed security and Privacy Act regulations, policies and procedures.
(4) Provide the office's CAWG member with locally developed applications and ideas for possible use in other areas.
Par 7d(10) Page 5
8. PROCEDURES. An office or facility desiring to implement, modify or expand a "non-local" computer application, either hardware or software, shall:
a. Submit the reguest or proposal in narrative format to their office or division's CAWG member.
b. Ensure that the request or proposal is complete and addresses all aspects of the application such as problem, ãesired result, information requirements, cost estimates, cost savings, etc.
c . Assist the CAW Group member, if necessary, in developing a recommendation to be submitted to the OIRi and/or RIRi.
ā. Implement the proposal only after approval by the appropriate authority.
9. REOUESTS FOR INFORIATION. Questions and/or issues regarding the monthly CAKG meeting may be addressed to Supervisor, Programming and Analysis Section, AWP-43A, FTS 984-1235, or Supervisor, Technical Support Section, AWP-43B, FTS 984-1330.
Jerold M. Chavkin Regional Aaministrator
Fage € Par 8