Radar Vectors
FAA Order Cancelled Issued May 1, 1985 AWP-40 94 pages Copy saved Nov 18, 2026

Order 1370.6A Wp Information Resource Management Plan

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION WP 1370.6A WESTERN-PACIFIC REGION

U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION WP 1370.6A WESTERN-PACIFIC REGION

5/21/85

SUBJ: WESTERN-PACIFIC REGION INFORMATION RESOURCE MANAGEMENT PLAN (WP-IRMP)

1. PURPOSE. This order documents the Western-Pacific Region's plan for information resource management.

SUBJ: WESTERN-PACIFIC REGION INFORMATION RESOURCE MANAGEMENT PLAN (WP-IRMP)

2. DISIRIBUTION. This order is distributed to Section level in regional headquarters, with limited distribution to all field offices and facilities in the Western-Pacific Region.

3. CANCELLATION. Order WP 1370.6, Western-Pacific Region Information Resource Management Plan (WP-IRMP), dated 11/9/84 is cancelled.

4. BACKGROUND. Upon publication of the FAA's Information Resource Management Plan (IRMP) in August, 1983, the agency embarked upon a long term effort to effectively manage information as an agency resource. The various task forces, representing all facets of the agency, identified in detail the information needs of the present and identifiable future. Systems were identified to bring this information together, and the systems were published in the IRMP.

5. RELATIONSHIP OF WP-IRMP TO IRMP. The Western-Pacific Information Resource Management Plan (WP-IRMP) adopts by reference the content and scope of the FAA's national IRMP. The intent of the WP-IRMP is to provide regional organization and action planning required to fully implement the IRMP in the Western-Pacific Region." The wP-IRMP is a changing document which must necessarily be revised frequently to accommodate new or changing information requirements, technology advances, shifts in agency or department direction, and changes in user organizations, requirements, equipment, software, data communications, etc.

6. POLICIES.

a. Regional information systems will mesh wherever possible with national information systems.

b. Networking of information, and equipment capability to do this compatibly, is a prime objective which will be met wherever possible.

c. Information shall be captured once, and used by all those who have demonstrated need for it through coumon data base techniques.

d. System users will be largely responsible for the development of their own information systems in conjunction and coordination with the Information Resource Manager (IRM).

e. Planning for new requirements will be accomplished as early as possible to assure appropriate estimates are developed and included in the budget process.

Distribution: Initiated By:

A-X-4; A-FOF-0 (LTD) AWP-60

A-X-4; A-FOF-0 (LTD) AWP-60

WP 1370.6A 5/21/85

7. RESPONSTBILITIES.

a. Information Resource Manager (IRM). The IRM is the individual designated by the Regional Director to be the focal point for information resource management in the region. The IRM's duties and responsibilities are fully outlined in Örder FAA Order 1370.52B, "Information Resources Management - Policies and Procedures." In summary, the IRM must be aware of and knowledgeable regarding all regional activities which fall within the IRMP. The IRM is accountable for approving the acquisition of information processing equipment in the region, and represents the region at meetings of the agency IRM Council.

b. Information Resource Management Representatives (IRMRs). The IRMRs are individuals designated by each Staff and Division Manager to represent his/her organization in all matters of information resource management." This is an important role, and requires significant amounts of information gathering, close coordination, and research if the regional elements are to be effectively represented. The IRMRs must be aware of and knowledgeable regarding all activities within the WP-IRMP. All such activities must be coordinated with the IRM to assure maximum benefits and service result from regional system development, equipment acquisitions, and the related aspects of maintenance, training and technical assistance. A list of Regional IRM Representatives is included in this order as Appendix 5.

8. SYSIEMS. The region must meet a national requirement that all information systems be identified and reported promptly to national Information Resource Management Program Office (IRMPO) for inclusion in the national plan. This responsibility devolves through the IRM to the IRMRs to report all planned systems or systems under development to the IRM. This requirement does not include unique systems which are used by only one individual on a stand-alone personal computer. Appendix 1 to this plan lists all national and regional information systems, both planned and in place, and shows the current implementation status. Appendix 4 outlines the regional involvement in the systems published in the national IRMP.

9. EQUIPMENT. The region must meet a national requirement (GSA) that all information processing equipment be identified and entered promptly into the automated system which records and tracks all such equipment use in the agency. This responsibility also devolves through the IRM to the IRMRs and requires the IRMRs to report promptly information on all new information processing equipment acquisitions to the IRM. Appendix 2 provides a current listing of this equipment and the scope of information required.

10. SOFIWARE. Acquisition and management of software is an equally important function of information resource management in the region. The licensing and use of software must be carefully monitored to assure the region does not become involved in software actions which violate the proprietary interests of the vendors. This responsibility also devolves through the IRM to the IRMRs, and requires the IRMRs to report promptly information on all new software acquisitions to the IRM. Appendix 3 provides a current listing of regional software and describes the software capability and its applicability for use on various equipment.

11. NEIWORKING. The region is committed to the evolvement of networking capability throughout the region and with other agency and departmental offices. Through this means true information sharing may be made possible. As each new system is

Page 2 Par 7a

5/21/85 WP 1370.6A

developed, at any level, earnest consideration shall be given to the need for and requirements of effective networking techniques. These considerations shall be brought to the attention of the IRM who in turn will provide technical assistance in resolving problems and establishing effective networking techniques. 12. OFFICE AUIOMATION. Office Automation covers a wide variety of automation tools and techniques that are not specific to a particular information area. OA represents the application of automation techniques for improving productivity in typical office settings.

a. Office Automation covers tasks such as:

(1) Document/Word processing

(2)Automated spelling checkers and dictionaries

(3) Electronic filing

(4) Electronic mail

(5) Electronic calendaring and scheduling (6) Electronic phone messaging (7) Electronic reminders/ticklers (8) Electronic spread sheets (9) Forms Management (10) Source data entry and editing

b. The key element in addressing the implementation of Office Automation will be to view the potentials for improvements from a regional perspective, looking across organizational, functional, and project lines. More specifically the approach calls for:

(1) Assessing and acting on the cost vs benefits of automation versus not automating.

(2) Using existing equipment, software and common data bases to support improvements to the extent possible.

(3) Providing a central support group (i.e., Resource Center) to make more effective and intensive use of existing or planned equipment and software needed for national and regional applications.

(4) Providing the mechanism for user group meetings to encourage balance between innovation/standardization to insure maximum benefits for the entire region.

Par 11 Page 3

WP 1370.6A 5/21/85

c. The goals of office automation are simply stated:

(1) Provide each manager and organization with the tools necessary to improve personal and organizational productivity and effectiveness.

(2) Provide a mechanism whereby the cost of equipment, software and services are kept to an effective level by insuring compatibibility and maximum utilization.

(3) Implement an approved Comprehensive Office Automation plan across all of the Western-Pacific Region.

d. FY-85 Objectives.

(1) Install and initiate approved Executive Management Information System (EMIS) in AWP Regional Office Division and Staff Manager Offices.

(2) Complete the planning and approval processes for the extension of this same technology to the rest of the Regional Office and the field.

e. The return on the investment in office automation tools is directly related to productivity improvement. The time it will take the work force to perform their office functions, conduct training, retrieve and update documents, for example, will be markedly reduced by the proposed implementation presented here.

f. Organizational Impacts. The organizational impact of office automation could be extensive. The equipment and software delivered through the office automation program have the potential for redistributing workload in different ways. There will be two primary areas of impact:

(1) Many of the tools made available under this program area have major productivity benefits, which translate into fewer people doing specific work. In most cases, these productivity benefits will permit people to do different work more effectively.

(2) There will be a demand for new skills. Computer skills will have to be brought into the work responsibility area of each affected employee. Automated data processing (ADP) training will therefore be mandatory.

13. DECISION SUPPORT SYSTEMS. Decision Support Systems cover a wide variety of automation tools and techniques that are specific to a particular information area. It represents the ADP support across functional and organizational lines in performing such tasks as:

- Data Base Management Systems

Data Resource Dictionaries/Directories

Project Tracking Support Systems

- Computer Supported Graphics Systems

Page 4 Par 12c

J

WP 1370.6A

- Financial Modeling

- Statistical Analysis.

a. Apprcach to Implementation. The key element in addressing the implementation of Decision Support Systems will be to view the potentials for improvements fram a regional perspective, looking across organizational, functional, and project lines. More specifically, the approach calls for:

(1) Providing a common Regional Data Base of the most needed data elements and create standard "gateways" and procedures for access on an as required basis.

(2) Using existing equipment, software and common data bases to support improvements to the extent possible.

(3) Providing a central support group (i.e., Information Center) to make more effective and intense use of existing or planned equipment and software needed for national and regional applications.

b. Goals. The goals of Decision Support Systems are simply stated:

(1) Provide each manager and organization with those automation tools which provide ready access to management infomation and improve personal and organizational effectiveness.

(2) Provide a mechanism whereby the cost of equipment, software and services are kept to an appropriate level by insuring compatibility and maximum utilization.

(3) Implement approved Comprehensive Decision Support Systems across all of the Western Pacific Region using Data Base technologies and user maintenance philosophies.

c. FY-85 Objectives.

(1) Install and initiate use of Data Base access software on current available Regional Data Bases.

(2) Begin and complete the planning and approval processes for identification of "region critical" data elements for Regional Office and the field.

d. The return on the investment in Decision Support Systems tools is directly related to productivity improvement. The time it will take the work force to perform their management functions, retrieve and update data, and prepare man agement reports, for example, will be markedly reduced by the proposed implementation presented here.

e. The_organizational impact of Decision Support Systems could also be extensive. The equipment and software delivered through this decision support program have the potential for redistributing workload in different ways. However,

Par 13 Page 5

WP 1370.6A 5/21/85

organizational management officials at every level will be better equipped to perform their functions, and thus have the potential to be more effective and more accountable for results.

HOmcClure H. C. MCCLURE

Director

Page 6 Par 13e

MAY

ADMINISTRATIVE ADP SYSTEMS/APPLICATION SOFTWARE IN THE WESTERN-PACIFIC REGION

ADMINISTRATIVE ADP SYSTEMS/APPLICATION SOFTWARE IN THE WESTERN-PACIFIC REGION

System Name

Facilities Equipment Budget Uniform Payroll~System (ÚpS) Uniform Accounting System (UAS) Accounting Data Transmission FDR Transmission (Financial Detail Records)

System No. OPI/Vendor

01 07 NS AWP-420 01 07 NS AWP-020 01 07 NS AWP-020 01 07 NS AWP-020

01 07 NS AWP-020 01 09 NS AWP-020

01 07 NS AWP-020 01 09 NS AWP-020

Equipment Necessary

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000

DG MV-8000 DG MV-8000

2 1 Ovner ABU 1985

AAC AAC AAC

AAC AAC

PSR Transmission (Project Status Report)

Personal Property Management System Field Inventory Replenishment Motor Vehicle Management Real Property Accountability Directives Checklist Index National Driver Registration Project Materiel Management and Accounting Line Performance Facilities Master File Facilities Service Outage Regional Grant Management System ADĀP/PGP Accounting Report Systems Acquisition Management (SAM) AWP Accounting Scheduling AWP Travel Advance Permanent Change of Station Payroll (Local) Special Maintenance Projects Facilities and Establishment Cost Accounting Accounts Receivable Page Generai Accounting - R2508 AF Budget Tracking

AAC AAC

OMB A93 Manhours Reporting

01 09 NS AWP-020/050 01 09 NS AWP-020/050 01 09 NS AWP-020/050 01 09 NS AWP-020/050 01 14 NS AWP-060 01 14 NS AWP-050

04 09 NS AWP-020/050 04 10 NS AWP-400 04 10 NS AWP-420 04 10 NS AWP-420 08 03 07 AWP-600 08 07 NS AWP-020 11 09 10 AWP-050 20 07 01 AWP-020 20 07 03 AWP-020 20 07 04 AWP-020 20 07 05 AWP-020 20 07 06 AWP-400

20 07 07 AWP-020 20 07 08 AWP-020 20 07 24 AWP-400 20 07 25 AWP-020 20 07 26 AWP-020

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000

AWP/AAC-300 ASW ACE ACE AMS AMS

ACE ASW ASW ASW ARP-010 ASO AAL-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060

ACE ASW ASW ASW ARP-010 ASO AAL-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060

AWP-060 AWP-060 AWP-060

AWP-060 AWP-060 Appendix 1 WP 1370.6A

Page

2 System Name

Recurring Charge System Personnei Statistical System

System No. OPI/Vendor

20 07 31 AWP-020 20 08 09 AWP-010

Equipment Necessary

DG MV-8000 DG MV-8000 DG MV-8000

DG MV-8000 DG MV-8000 DG MV-8000

Owner AWP-060 Appendix 1 WP 1370.6A

AWP-060 AWP 060

AWP-010/300/700

Work Tracking AT Medical Regional Workload Tracking - SF-52 Work Tracking - Procurement Vehicle Registration Excess Personal Property Facility Performance System ADP Facility Work Tracking - ADP Projects Directives Revalidation Mailing Address Labels Automated Scheduling and Control Tape Library System Computer Program Library Automated Documentation System

AWP-060 AWP 060

20 08 10 20 08 27 AWP-010 20 09 11 AWP-050 20 09 12 AWP-050 20 09 13 AWP-050 20 10 14 AWP-400 20 12 15 AWP-060 20 14 16 AWP-060 20 14 17 AWP-060 20 14 18 AWP-various 20 14 19 AWP-060 20 14 20 AWP-060 20 14 21 AWP-060 20 14 22 AWP-060 20 14 28 AWP-060

DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DG MV-8000 DGI MV-8000

AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060 AWP-060

Regional Workload Tracking-Admin.Hotline

Present Inquiry System

20 14 29 AWP-010/020 20 14 30 AWP-020

20 14 29 AWP-010/020 20 14 30 AWP-020

DG MV-8000 DG MV-8000

AWP-060 AWP-060

Regional Workload Tracking - Acctg. Doc.

AT Staffing Standards Budget Allotment Loss Management AF Staffing Studies

01 05 NS CDC 01 07 NS. CSC 01 08 NS TSC 01 10 NS CDC/CSC 01 12 NS Informatics

Timeshare Timeshare Timeshare Timeshare Timeshare

AMS ABM APT AMS AMS-300

AMS ABM APT AMS AMS-300

Software Directory (ADP Info. System)

FAA Directory Life Cycle Line Performance Waivers/Mods/NCP/FAA LOC Outage Reporting FMF FERS/PFF Frequency Management Engine Generator

01 14 NS CSC 04 09 NS TSC 04 10 NS CDC 04 10 NS CSC 04 10 NS CDC 04 10 NS CDC 04 10 NS CDC 04 10 NS CDC 04 10 NS CSC

Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare

AMS-300 ALG AES AWP AES

AMS-300 ALG AES AWP AES

AES AES MAY

AES 22 1. AES 1985

System Name

NAPRS National Airport System Plan Health Information System Enforcement Information System (EIS) Service Difficulty Report (SDR) Accident Incident Data System (AIDS) Terminal Area Forecast (TAFDS) Environmental Data Bank Air Traffic Activity (Density Index) Personnel Retirement Calc. Information System Video Catalog SMP Engr. Calc. Program Local Facilities Outage Reporting Engineering Drawings Technical Evaluations Remote Job Entry (RJE) Joint Acceptance

AES 22 1. AES 1985

Page

3

System No. OPI/Vendor

04 10 NS CDC 08 03 NS UIS 09 06 NS UIS 09 06 NS UIS 09 06 NS UIS 09 06 NS UIS 09 14 NS BCS 09 14 NS BCS 20 05 51 CDC 20 08 52 CDC 20 08 53 CSC 20 10 54 CSC 20 10 55 CDC 20 10 56 CDC 20 10 57 Informatics 20 10 58 CSC 20 12 59 IV Phase 20 14 60 CSC

Equipment Necessary

Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare Timeshare

MAY

Owner 2

AES ARP 1985

AES ARP 1985

ASF AVN-120 AVN-120 AVN-120 AVP-100 AVP-100 AWP-060 AWP-067 AWP-017 AWP-060 AWP-400 AWP-400 AWP-060 AWP-060 AWP-060 AWP-060

Appendix 1 WP 1370.6A

WP 1370.6A MAY 2 1 1985 Appendix 2

ADMINISIRATIVE ADP EQUIPMENT IN THE WESTERN-PACIFIC REGIONAL HEADQUARTERS OFFICE ROUTING/LOCATICN - Office of the Director, AWP-1/2

CURRENT FOUIPMENT

CURRENT FOUIPMENT

QUANTTTY TYPE/MCDEL CF ECUIFMENT 1 Data General D400 Terminals 1 NEC 5515 Spinwriter Letter Quality Printer 2 Hayes Smartmodem 1200B 2 IBM PC XT 2 IBM DOT Matrix Printer (Graphics) FUTURE EOUIPMENT /NOIE: THROUGHOUT THIS APPENDIX THE FUTURE EQUIPMENT WILL BE IN ADDITION TO THE CURRENT EQUIPMENT. QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

CFFICE ROUTING/LOCATICN - Planning & International Aviation Staff, AWP-4

CURRENT EQUIPMENT

CURRENT EQUIPMENT

QUANTTTY TYPE/MODEL CF EOUIFMENT

1 IBM FC XT 1 IBM DOT Matrix Printer (Graphics) 1 Hayes Smartmodem 1200B

FUTURE EOUIPMENT QUANITTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE 1 Texas Instrument 820 KSR Terminal 1 Wordplex Terminal 1 Wordplex Letter Quality Printer 6 Workstations FY-86 1 Letter Quality Printer FY-86 OFFICE ROUTING/LOCATION - Public Affairs Office, AWP-5

1 IBM FC XT 1 IBM DOT Matrix Printer (Graphics) 1 Hayes Smartmodem 1200B

CURRENT FOUIPMENT QUANTITY TYPE/MODEL OF FOUIPMENT 1 IBM FC XT 1 IBM DOT Matrix Printer (Graphics) 1 Hayes Smartmodem 1200B

FUTURE FOUIPMENT QUANTTTY TYPE/MODEL CF FOUIIMENT IMPLEMENT DATE 23 Northern Telecon Display Phone Terminals Page 1

WP 1370.6A Appendix 2 MAY 2 1 1985

OFFICE ROUTING/LOCATION - Operations Center, AWP-6

CURRENT EOUIIMENT

CURRENT EOUIIMENT

QUANTTTY TYFE/MCDEL CF EOUIFMENT

2 Micronet 8 Telecommunication System

FUTURE FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

2 Hayes Smartmodem 1200B FY-86

22 IBM PC XT IBM Dot Matrix Printer (Graphics) FY-86 FY-86

CFFICE ROUTING/LOCATICN - Regional Counsel, AWP-7

CURRENT EOUIIMENT

QUANTITY TYPE/MODEL CF EOUIPMENT

QUANTITY TYPE/MODEL CF EOUIPMENT

1 B-21-3 Burroughs Terminal 1 SP-1302 Burroughs Letter Quality Printer 2 Wordplex Terminals 1 Wordplex Letter Quality Printer 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIIMENT

QUANTITY TYPE/MODEL OF EQUIPMENT IMPLEMENT DATE

1 Workstation FY-86 1 Multi Function Printer FY-86

1 Workstation FY-86 1 Multi Function Printer FY-86

WP 1370.6A MAY 2 1 1985 Appendix 2 OFFICE ROUTING/LOCATION - Civil Rights Staff, AWP-9

CURRENT EOUIPMENT

QUANTITY TYFE/MODEL CF EOUIFMENT 1 Hayes Smartmodem 1200B IBM PC XT 11 IBM DOT Matrix Printer (Graphics)

FOTURE FOUIPMENT

QUANTITY TYPE/MODEL OF EQUIPMENT IMPLEMENT DATE 1 Workstation FY-86 1 Multi Function Printer FY-86

FOTURE FOUIPMENT

CFFICE ROUTING/LOCATION - Human Relations Office, AWP-1D

CURRENT FQUIPMENT

QUANTTTY TYPE/MODEL OF EOUIIMENT

1 IBM - FC XT IBM Dot Matrix Printer (Graphics) 111 Wordplex Letter Quality Printer Worplex Terminal 1 Hayes Smartmodem 1200B

FUTURE FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

WP 1370.6A Appendix 2 MAY 2 1 1985

CFFICE RCUTING/LCCATICN - Human Resource Management Division, AWP-10

CURRENT EOUIPMENT

CUANTTTY TYFE/MCDEL CF ECUIFMENT

4 Incoterm Terminals 2 Centronic Dot Matrix Printers 2 Pertec Tape Drives 1 Teletype Printer 6 Data General 6130 Terminals 4 Data General D460 Terminals 3 NEC 7715 Spinwriter Letter Quality Printers 2 Wordplex Terminals 1 Wordplex Letter Quality Printer 2 IBM PC XT 2 IBM DOT Matrix Printer 1 Hayes Smartmodem 1200B

FUTCRE ECUIFMENT

FUTCRE ECUIFMENT

CUANTTTY TYPE/ICDEL CF ECUIFMENT TMFLEMENT DATE

15 Workstations FY-86 3 Letter Quality Printers FY-86 1 Multi Function Printer FY-86

CFFICE RCUTING/LCCATICN - ACCounting Division, AWP-20

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

1 Harris Controller 9210 20 Harris Terminals 6 Harris Low Speed Dot Matrix Printers 1 Harris High Speed Dot Matrix Printer 2 Data General D400 Terminals 4 Data General 460 Terminals 2 Data General Letter Quality Printers 1 Data General Dot Matrix Printer 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIFMENT

FUTURE EOUIFMENT

CUANTTTY TYPE/MCDEL CF EOUIFMENT IMFLEMENT DATE

18 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86 3 IBM PC FY-86

WP 1370.6A

MAY 2 1 1985 Appendix 2

CFFICE RCUTING/LCCATICN - Budget Division, AWP-30

CURRENT ECUIFMENT

CUPTTIY TEE/RCDEL CF ECUIEENT

CUPTTIY TEE/RCDEL CF ECUIEENT

1 Dataphone 2400 Incoterm Terminal/Keyboard 1 Centronics Dot Matrix Frinter 2 Hayes Smartmodem 1200B 2 IBM PC XT 2 IBM DOT Matrix Printer (Graphics)

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT DMPLEMENT DATE

3 1 Workstations Multi Function Printer FY-86 FY-86

CTICE RCUTIC/LCCATICN - Lcgistics Division, AWP-50

CURRENT ECUIEMENT

CURRENT ECUIEMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

2 Wordplex Terminals 1 Wordplex Letter Quality Printer 5 Data General D400 Terminals 15 Data General 460 Terminals 2 Data General Dot Matrix Printers 2 Data General Letter Quality Printers 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIPMENT

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

5 Data General Dot Matrix Printers 11 Data General Letter Quality Printers 5 Data General 460 Terminals 3 Hayes Smartmodem 1200B 3 IBM PC XT 3 IBM Dot Matrix Printers 1 IBM PC Portable

WP 1370.6A Appendix 2 MAY 2 1 1985

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

CFFICE RCUTING/LCCATICN - Management Systems Division, AWP-60

CURRENT ECUIFMENT

CUANTTTY TYPE/MCDEL CF ECUIRMENT

3 Woräplex Terminals 1 Wordplex Letter Quality Printer 2 Data Ceneral Eclipse MV-8000 Systems 1 Texas Instrument CMNI 800-820 KSR Terminal/Dot Matrix Printer 1 B-21-3 Burroughs Terminal 1 AP 1300 Letter Quality Printer 2 Data General 6040 Printers 10 Data General D400 Terminals 13 Data General 460 Terminals w/Graphics 4 Data General 4320 Letter Quality Printers Data General System 10 SP Data General MPT 100 11444 Hayes Smartmodem 1200B IBM PC XT IBM DOT Matrix Printer (Graphics)

FUICRE ECUIFENT

FUICRE ECUIFENT

QUANTITY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

7 Workstations FY-86 4 Multi Function Printers FY-86 24 Workstations FY-87

WP 1370.6A MAY 2 1 1985 Appendix 2

OFFICE ROUTING/LOCATION - Flight Standards Division, AWP-200

CURRENT FOUIFMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System 2 B-21-2 Burroughs Terminals 2 Burroughs AP i300 Letter Quality Printers 1 Data General D400 Terminal 1 NEC 7715 Sprinwriter Letter Quality Printer 2 Wordplex Terminals 1 Wordplex Letter Quality Printer 1 Texas Instrument Omni 800-820 KSR Terminal/Dot Matrix Printer 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE FQUIPMENT

FUTURE FQUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

4 Workstations FY-86 2 Letter Quality Printers FY-86 5 Workstations FY-87 3 Letter Quality Printers FY-87 5 Workstations FY-88 2 Letter Quality Printers FY-88

OFFICE ROUTING/LOCATION - Aviation Medical Division, AWP-300

CURRENT EQUIPMENT

CURRENT EQUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

1 Data General D400 Terminal 1 Data General 6040 Dot Matrix Printer 1 B-21-2 Burroughs Terminal 1 Burroughs Printer 1 Dataphone Modem 300/1200 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE FOUIPMENT

OJLNTTTY TYPE/MODEL OF EOJIPTINT DELEENT DATE

OJLNTTTY TYPE/MODEL OF EOJIPTINT DELEENT DATE

3 Workstations FY-86 2 Letter Quality Printers FY-86

WP 1370.6A Appendix 2 MAY 2 1 1985

OFFICE ROUTING/LOCATION - Airway Facilities Division, AWP-400

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL CF EOUIPMENT

6 Wordplex Terminals 3 Wordplex Letter Quality Printers 10 Dec Rainbow 10 Terminals 10 Digital Letterprinter 100 (Dot Matrix) 2 Compustar Video Processing.Unit (VPU)-30 Compustar DSS-10 Hard Disk 10MB 111 Textronics 4052, Graphing Machine Hayes Modem

QUANTTTY TYPE/MODEL CF EOUIPMENT

2 Data General D400 Terminals 1 Data General Letter Quality Printer 1 Actrix Terminal (Portable) 1 DEC Correspondent 5 Texas Instrument Omni 800-820 KSR Terminal/Printer 5 Texas Instrument Silent 700 Terminals 1 Texas Instrument Silent 700 Terminal (Portable) 1 Hayes Smartmodem 1200B 2 IBM PC 2 IBM XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIPMENT

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

3 Single-use Microprocessors 7 Multi-use Microprocessors

Specifications for the type equipment to be detailed later.

OFFICE ROUTING/LOCATION - Air Traffic Division, AWP-500

CURRENT FOUIFMENT

QUANTITY

7 7

142

1 1

TYPE/MODEL OF EOUIPMENT

TYPE/MODEL OF EOUIPMENT

IBM PC XT IBM Dot Matrix Printer IBM Color Printer Wordplex Terminals Wordplex Letter Quality Printers Data General D400 Terminal

Texas Instrument, Silent 700 Terminal/Printer

2

Hayes Smartmodem 1200B

FUTURE FOUIPMENT

QUANTTTY

3 9 2 8 12 3 9

52

2 14 3 11 37 37

TYPE/MODEL OF EOUIPMENT

Multi-use Microprocessors Workstations Letter Quality Printers Multi Function Printers Workstations Letter Quality Printers Multi Function Printers Workstations Letter Quality Printers Multi Function Printers Workstations Letter Quality Printers Multi Function Printers Workstations Letter Quality Printers

Specifications for the type

IMPLEMENT DATE

IMPLEMENT DATE

FY-86 FY-86 FY-86 FY-87 FY-87 FY-87 FY-88 FY-88 FY-88 FY-89 FY-89 FY-89 FY-90 FY-90

equipment to be detailed later.

WP 1370.6A Appendix 2 MAY 2 1 1985

OFFICE ROUTING/LOCATION - Airports Division, AWP-600

CURRENT EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

1 Universal Data System 2/2 LP (modem) 1 NEC Spinwriter Letter Quality Printer 1 Data General D460 Terminal 1 Data General System 10SP 1 Displayphone 9K NT6k00 1 Dot Matrix Printer 2 Wordplex Terminals 1 Wordplex Letter Quality Printer 1 Data General D400 Terminal 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIPMENT

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FQUIPMENT IMPLEMENT DATE

3 2 Data General Tape System NEC Spinwriter Letter Quality FY-86 FY-86

Printers

2 2 2 Data General System 10 SP Data General D460 Terminals Hayes Smartmodem 1200B FY-86 FY-86 FY-86

1 1 1 1 NEC Spinwriter Letter Quality Prtr.FY-87 Data General D460 Terminal Data General System 10 SP Hayes Smartmodem 1200B FY-87 FY-87 FY-87

QUANTTTY TYPE/MODEL OF FQUIPMENT IMPLEMENT DATE

OFFICE ROUTING/LOCATION - Civil Aviation Security Division, AWP-700

CURRENT EQUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 B-21-2 Burroughs Terminal 1 AP 1300 Letter Quality Printer 1 Hayes Smartmodem 1200B 1 IBM PC XT 1 IBM DOT Matrix Printer (Graphics)

FUTURE EOUIPMENT

TYPE/MODE OF EOUIPENT

TYPE/MODE OF EOUIPENT

1 1 1 1 Letter Quality Printer Workstation Workstation Letter Quality Printer FY-86 FY-90 FY-86 FY-90

ADMINISTRATTVE ADP EQUIPMENT IN THE WESTERN-PACIFIC REGION

FIELD OFFICES

FLIGHT STANDARDS, AWP-200

OFFICE ROUTTNG/LOCATICN - Van NUYS FSDO-1

CURRENT EQUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

1 Burroughs B-22 System 2

1 Burroughs B-22 System 2

Burroughs AP 1300 Letter Quality Printers

1 Burroughs B-21-4 Standalone 1 Burroughs B-21-2 Workstation

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

QUANTTTY TYPE/MODEL OF EOUIPMENT

OFFICE ROUTING/LOCATION - San JoSe FSDO-2

CURRENT EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System 2

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP 1300 Letter Quality Printers

1 Burroughs B-21-4 Standalone

FUTURE FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

2 Workstations 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTTNG/LOCATION - San FrancisCo FSDO-3

CURRENT FOUIPMENT

QUANTTTY TYPE/NODEL CF EOUIFMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

1 Burroughs B-22 System

3 1 Burroughs B-21-4 Standalone 2 Burroughs B-21-2 Workstations

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

2 Workstations 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

CFFICE ROUTTNG/LOCATION - FreSnO FSDO-4

CURRENT EOUIPMENT

QUANTTTY TYPE/NODEL OF FOUIPMENT

1 Burroughs B-22 System

IMPLEMENT DATE

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP 1300 Letter Quality Printer

1

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

3 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Long Beach FSDO-5

CURRENT FOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

2 1 Burroughs B-21-4 Standalone 1 Burroughs B-21-2 Workstation

FUIURE EQUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

QUANTITY TYPE/MODEL OF FOUIPMENT

OFFICE ROUTING/LOCATION - Las Vegas FSDO-6

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

1. Burroughs B-22 System

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP·1300 Letter Quality Printer

1

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT.

3 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Phoenix FSDO-7 (Scottsdale)

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

2 1 Burroughs B-21-4 Standalone 1 Burroughs B-21-2 1 Burroughs B-21-2 Workstation

FUTURE FOUIPMENT

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

3 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

CFFICE ROUTTNG/LOCATION - Phoenix FSDO-7S (Sky Harbor)

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printer

1

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

2 Workstations 1 Letter Quality Printer 2 Workstations

12 Letter Quality Printer Workstations

1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Riverside FSDO-8

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIIMENT

1 Burroughs B-22 System 2

Burroughs AP 1300 Letter Quality Printer

1 Burroughs B-21-4 Standalone

FOTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

2 Workstations 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

QUANTTTY TYPE/MODEL OF EOUIPMENT

CFFICE ROUTING/LOCATION - San Diego FSDO-9

CURRENT EOUIPMENT

QJANTITY TYPE/MODEL OF EOUIPMENT

2 Burroughs B-22 System 3

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP 1300 Letter Quality Printers

1 Burroughs B-21-4 Standalone

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

3 Workstations 2 Workstations, 1 Letter Quality Printer . 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Los Angeles FSDO-10

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

2 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

2 Burroughs B-22 System

5 2 Burroughs B-21-4 Standalone 3 Burroughs B-21-2 Workstations

FUIURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

1 Workstation 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

CFFICE ROUTING/LOCATICN - RenO FSDO-11

CURRENT EOUIPMENT

QUANTTTY TYPE/NODEL OF EOUIFENT

1 Burroughs B-22 System

1 Burroughs B-22 System

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP 1300 Letter Quality Printer

1

FUTURE FOUIPNENT

QUANTITY TYPE/NODEL OF EOUIPMENT

2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Sacramento FSDO-12

CURRENT EOUIPMENT

QUANTITY TYPE/MODEL OF EQUIPMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

2 1 Burroughs B-21-4 Standalone

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

2 Workstations 2 Workstations 1 Letter Quality Printer 2 Workstations 1 Letter Quality Printer

OFFICE ROUTING/LOCATION - Honolulu FSDO-13

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Burroughs B-22 System

IMPLEMENT DATE

FY-86 FY-87 FY-87 FY-88 FY-88

Burroughs AP 1300 Letter Quality Printer

FY-86 FY-87 FY-87 FY-88 FY-88

2 1 Burroughs B-21-4 Standalone 1 Burroughs B-21-2 Workstation

FUIURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

4 Workstations 2 Letter Quality Printers

21 Letter Quality Printer Workstations

2 Workstations 1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

OFFICE ROUTING/LOCATION - Oakland FSDO-14

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIFMENT

1 Burroughs B-22 System

Burroughs AP 1300 Letter Quality Printers

2 1 Burroughs B-21-4 Standalone 1 Burroughs B-21-2 Workstation

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

3 Workstations 1 Letter Quality Printer Workstations 212 Letter Quality Printer Workstations

1 Letter Quality Printer

1 Letter Quality Printer

IMPLEMENT DATE

FY-86 FY-86 FY-87 FY-87 FY-88 FY-88

ADMINISTRATIVE ADP EQUIPMENT IN THE WESTERN-PACIFIC REGION FIELD OFFICES - AVIATION. MEDICAL, AWP-300 OFFICE ROUTING/LOCATION - Palmdale Aviation Medical

CURRENT EOUIPMENT

QUANTTTY TYPE/MDEL OF EOUIPMENT

QUANTTTY TYPE/MDEL OF EOUIPMENT

0

FUTURE FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

2 Workstations 11 Letter Quality Printer Multi Function Printer

IMPLEMENT DATE

FY-86 FY-86 FY-86

OFFICE ROUTING/LOCATION - Oakland Aviation Medical

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

0

FUTURE EOUIRENT

QUANTITY TYPE/MODEL OF FOUIPMENT

2 Workstations 1 Letter Quality Printer 1 Multi Function Printer

2 Workstations 1 Letter Quality Printer 1 Multi Function Printer

IMPLEMENT DATE

FY-86 FY-86 FY-86

WP 1370.6A MAY 2 1 1985 Appendix 2

ADMINISTRATIVE ADP EQUIPMENT IN THE WESTERN-PACIFIC REGION FIELD OFFICES - AIRWAY FACILITIES, AWP-400

FUTURE FOUIPMENT SUMMARY - AFS FIELD QUANTTTY TYPE/MODEL OF EOUIPMENT

FUTURE FOUIPMENT SUMMARY - AFS FIELD QUANTTTY TYPE/MODEL OF EOUIPMENT

72 Single-use Microprocessors 25 Multi-use Microprocessors * *Specifications for the type equipment to be detailed later.

OFFICE ROUTTNG/LOCATION - Honolulu ARTCC AFS

CURRENT EOUIPMENT QUANTTTY TYPE/MODEL OF EOUIPMENT

2 T16 1420 Tandem Processors 2 T16 5520 Serial Character Printers 1 T16 5503 Line Printer 1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 6 Texas Instrument 91l Video Display Terminals 1 Texas Instrument Model 2230 Line Printer 1 General Electric 3404 Dot Matrix Printer 1 Compustar Video Processing Unit (VPU)-10 2 Compustar Video Processing Units (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 Penrils 212A Modem

QUANTITY FUTURE EOUIPMENT TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

QUANTITY FUTURE EOUIPMENT TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

4 4 Letter Quality Printers Workstations FY-86 FY-86

WP 1370.6A MAY 2 1 1985 Appendix 2

OFFICE ROUTING/LOCATION - Los Angeles ARTCC AFS (Palmdale)

CURRENT EOUIPMENT QUANTITY TYPE/MODEL OF FOUIPMENT

3 T16 1421 Tandem Processors 2 T16 5520 Printers Serial Character 340CPS 1 T16 5503 Line Printer 600 1 Data General MPI-100 Standalone 1 NEC Spinwriter Letter Quality Printer 6 Texas Instrument 91l Video Display Terminals 1 Texas Instrument Model. 2230 Line Printer 2 Compustar Video Processing Units (VPU)-10 3 Compustar Video Processing Units (VPU)-30 2 Texas Instrument 820 KSR Printer 2 Compustar DSS-10 Hard Disk 10 MB 3 Penrils 212A Modem

FUTURE EOUIPMENT QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

FUTURE EOUIPMENT QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

4 Workstations FY-86 4 Letter Quality Printers FY-86

OFFICE ROUTING/LOCATION - Oakland ARTCC AFS (Fremont)

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

3 T16 1421 Tandem Processors 512KB 2 T16 5520 Serial Character Printers 200CPS 1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 6 Texas Instrument 91l Video Display Terminals 1 Texas Instrument Model 2230 Line Printer 1 Texas Instrument 820 Dot Matrix Printer 1 Texas Instrument 743 2 Compustar Video Processing Units (VPU)-10 2 Compustar Video Processing Units (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 3 Penrils 212A Modem

FUTURE EOUIPMENT

FUTURE EOUIPMENT

QJANTTTY TYPE/MODEL OF EOUIPNTENT

4 Workstations FY-86 4 Letter Quality Printers FY-86

WP 1370.6A Appendix 2 MAY 2 1 1985

CFFICE RCUTING/LOCATICN - SaCramento AFS

CURRENT EOUIPMENT

CUANTTTY TYPE/RODEL CF ECUIFMENT

Data General MPT-100 Standalone NEC Spinwriter Letter Quality Printer Data General MPT/100 Computer Systems Data General Letter Quality Printers Compustar Video Processing Unit (VPU)-30 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem Data General MPI-100 Standalone NEC Spinwriter Letter Quality Printer

CUANTTTY TYPE/RODEL CF ECUIFMENT

McClellan TRACON

Compustar Video Processing Unit (VFU)-30 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

FUTURE EOUIFMENT

QTANTTTY TYPE/MODEL OF EOUIRHENT DPLEENT DATE

Workstations FY-86 Letter Quality Printers FY-86 Workstations FY-86 (SFO) Letter Quality Printers FY-86 (SFO) Workstations FY-87 (SFO) Letter Quality Printers FY-87 (SFO) Workstation FY-88 (SFO) Letter Quality Printer FY-88 (SFO) Workstations FY-90 (SFO)

QTANTTTY TYPE/MODEL OF EOUIRHENT DPLEENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE REDBLUFF AFS IN SEPTEMBER 1985.

MAY 2 1 1985 WP 1370.6A Appendix 2

CFFICE RCUTING/LOCATICN - HaYWard (Bay) AFS

CURRENT EOUIFMENT

CUANTTTY TYPE/MODEL CF EQUIIMENT

1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer

11 Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

11 Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

1 Compustar Video Processing Unit (VPU)-30 1 Texas Instriment 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 Robotics Modem 1 Data General MPI-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Modem

FUTURE FOUIFMENT

FUTURE FOUIFMENT

OJANTTTY TYPE/MODEL OF EOUIEMENT IMELEENT DATE

5 Workstations FY-86 5 Letter Quality Printers FY-86 2 Workstations FY-86 (SFO) Letter Quality Printers FY-86 (SFO) 244 Letter Quality Printers Workstations FY-87 (SFO) FY-87 (SFO)

1 Workstation FY-88 (SFO) 1 Letter Quality Printer FY-88 (SFO) 9 Workstations FY-90 (SFO)

1 Workstation FY-88 (SFO) 1 Letter Quality Printer FY-88 (SFO) 9 Workstations FY-90 (SFO)

NOTE: THE OAKLAND AND SAN FRANCISCO SECTORS CONSOL IDATED INTO HAYWARD (BAY) AFS IN APRIL 1985.

Page 23

WP 1370.6A MAY 2 1 1985 Appendix 2 CFFICE RCUTING/LOCATICN - San Diego AFS

CURRENT EOUIFMENT

CUANTUTTY TYPE/MODEL CF EOUIEMENT

1 Data General MPT-100 Standalone NEC Spinwriter Letter Quality Printer 1111 Compustar Video Processing Unit (VFU)-30 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB

1 UDS-212A Modem

1 UDS-212A Modem

SAN MIRAMAR TRACON 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 Robotics Modem

FUTURE EOUIFMENT CUANTTTY TYFE/MODEL CF ECUIFMENT IMPLEMENT DATE

5 Workstations FY-86 5 Letter Quality Printers FY-86 1 Workstation FY-86 (SFO) Letter Quality Printer FY-86 (SFO) 144 Letter Quality Printers Workstations FY-87 (SFO) FY-87 (SFO) 9 Workstations FY-90 (SFO) NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE RIVERSIDE AFS IN SEPTEMBER 1985.

FUTURE EOUIFMENT CUANTTTY TYFE/MODEL CF ECUIFMENT IMPLEMENT DATE

MAY 2 1 1985 WP 1370.6A Appendix 2

CFFICE ROUTING/LOCATION - Red Bluff AFS

CURRENT EOUIPMENT

CUEN TVEE/PODEL CF ECUIEENT

1 Data General MPI-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 11 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Modem

FUTURE FOUIPMENT

FUTURE FOUIPMENT

CUANTTTY TYPE/MODEL CF FOUIRMENT IMILEMENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE SACRAMENTO AFS IN SEPTEMBER 1985.

OPFICE ROTTTNG/LOCATION- Riverside AFS

CURRENT FOJIFMENT

QUANTTTY TYPE/MODEL OF EQUIPNENT

1 Data General MPI-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 Texas Instrument 820 KSR Printer 111 Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

FUTURE FQUIPMENT

FUTURE FQUIPMENT

QUANTTTY TYPE/MODEL OF FOUIRMENT IMPLEMENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE SAN DIEGO AFS IN SEPTEMBER 1985.

WP 1370.6A MAY 2 1 1985 Appendix 2

OFFICE ROUTING/LOCATION - LanCaster AFS

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Moden

FUTURE FOUIPMENT

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE LOS ANGELES AFS IN SEPTEMBER 1986.

OFFICE ROUTING/LOCATION - LOs Angeles AFS

CURRENT FOUIIMENT

QUANTTTY TYPE/MODEL OF EOUIFMENT

1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Modem

QUANTTTY TYPE/MODEL OF EOUIFMENT

LAX TRACON 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 Robotics Modem

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIFMENT IMPLEMENT DATE

5 Workstations FY-86 5 Letter Quality Printers FY-86 2 Workstations FY-86 (SFO) 2 Letter Quality Printers FY-86 (SFO) 4 Workstations FY-87 (SFO) 4 Letter Quality Printers FY-87 (SFO) 1 Workstation FY-88 (SFO) 1 Letter Quality Printer FY-88 (SFO) 10 Workstations FY-90 (SFO)

QUANTTTY TYPE/MODEL OF FOUIFMENT IMPLEMENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE LANCASTER AFS IN SEPT 1986.

MAY 2 1 1985 WP 1370.6A Appendix 2

OFFICE ROUTING/LOCATION - Phoenix AFS

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIRMENT

Data General MPI-100 Standalone NEC Spinwriter Letter Quality Printer Compustar Video Processing Unit (VPU)-30 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

QUANTTTY TYPE/MODEL OF EOUIRMENT

PHX TRACON Compustar Video Processing Unit (VPU)-30 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB Robotics Modem

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

Workstations FY-86 Letter Quality Printers FY-86 Workstations FY-86 (SFO) Letter Quality Printers FY-86 (SFO) Workstations FY-86 (SFO) Letter Quality Printers FY-86 (SFO) Workstation FY-86 (SFO) Letter Quality Printer FY-86 (SFO) Workstations FY-86 (SFO)

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

WP 1370.6A MAY 2 1 1985 Appendix 2

OFFICE ROUTING/LOCATION - Las Vegas AFS

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL, OF EOUIPMENT

1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Modem

QUANTTTY TYPE/MODEL, OF EOUIPMENT

LAX AFS 1 Compustar Video Processing Unit (VPU)-30 Texas Instrument 820 KSR Printer 111 Robotics Modem Compustar DSS-10 Hard Disk 10 MB

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIRMENT IMPLEMENT DATE

5 Workstations FY-86 5 Letter Quality Printers FY-86

1 Letter Quality Printer Workstation FY-86 (SFO) FY-86 (SFO)

1 Letter Quality Printer Workstation FY-86 (SFO) FY-86 (SFO)

144 Letter Quality Printers Workstations FY-87 (SFO) FY-87 (SFO)

1 Workstation FY-88 (SFO) 1 Letter Quality Printer FY-88 (SFO) 9 Workstations FY-90 (SFO)

MAY 2 1 1985 WP 1370.6A Appendix 2

OFFICE ROUTTNG/LOCATION - Honolulu (hub) AFS

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

1 Data General MPI-100 Standalone 1 NEC Spinwriter Letter Quality Printer 1 Compustar Video Processing Unit (VPU)-30 1 Texas Instrument 820 KSR Printer 1 Compustar DSS-10 Hard Disk 10 MB 1 UDS-212A Modem

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

1 Workstation FY-86 (SFO) Letter Quality Printer FY-86 (SFO) 133 Letter Quality Printers Workstations FY-87 (SFO) FY-87 (SFO) 9 Workstations FY-90 (SFO)

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

NOTE: THIS SECTOR WILL BE CONSOLIDATED WITH THE GUAM AFS IN SEPTEMBER 1985.

OFICE ROUTING/LOCATION- AWP-465 (Honolulu)

CURRENT EOUIPMENT

QJANTTTY TYPE/KODEL OF FOUIPMENT

1 Data General MPT-100 Standalone 1 NEC Spinwriter Letter Quality Printer

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

QUANTITY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

WP 1370.6A MA7 2 1 1985 Appendix 2 CFFICE RCUTING/LCCATICN - GUAM AFS

CCRRENT EOUIFMENT

CUANTTTY TYCE/NCDEL CF ECUIFMENT 1 Data General MPT-100 Standalone NEC Spinwriter Letter Quality Printer Compustar Video Processing Unit (VFU)-30 11111 Texas Instrument 820 KSR Printer Compustar DSS-10 Hard Disk 10 MB UDS-212A Modem

CCRRENT EOUIFMENT

FUTURE EOUIPMENT CUANTTTY TYFE/WCDEL CF EOUIFMENT TMPLEMENT DATE NOTE: THIS SECTCR WILL BE CCNSCLIDATED WITH THE HONOLULU AFS IN SEPTEMBER 1985.

ADMINISTRATTVE ADP EQUIPMENT IN THE WESTERN-PACIFIC REGION

FIELD OFFICES AIR TRAFFIC, AWP-500

FUTURE FOUIPMENT. SUMMARY

QUANTTTY TYPE/MODEL OF EOUIPMENT

52 Visual Display Terminals * 50 Single-use Microprocessors 29 Multi-use Microprocessors *

52 Visual Display Terminals * 50 Single-use Microprocessors 29 Multi-use Microprocessors *

Specifications.for the type equipment

to be detailed later.

OFFICE ROUTING/LOCATION - ARTCC FrEmOnt

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

3 Data General System 10 SP 3

Data General Letter Quality Printer

1 Texas Instrument Micro 128k 1 Dot Matrix Printer

1 Texas Instrument Micro 128k 1 Dot Matrix Printer

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

3 Workstations 1 Letter Quality Printer Multi Function Printer Workstations 14122 Letter Quality Printer Multi Function Printers Workstations

15 Letter Quality Printer Workstations

2 Letter Quality Printers 2 Multi Function Printers

2 Letter Quality Printers 2 Multi Function Printers

IMPLEVENT DATE

FY-86 FY-86 FY-86 FY-87 FY-87 FY-87 FY-88 FY-88 FY-89 FY-89 FY-89

OFFICE ROUTING/LOCATION - ARTCC Palmdale

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

3 Data General System 10 SP

Data General Letter Quality Printer

3 Data General System 10 SP

3

11 Dot Matrix Printer Texas Instrument Micro 128k

FUTURE EOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT

3 Workstations Letter Quality Printer Multi Function Printers Workstations Letter Quality Printers Multi Function Printers 12422211522 Letter Quality Printer Workstations Multi Function Printer Workstations Letter Quality Printers Multi Function Printers

IMPLEMENT DATE

IMPLEMENT DATE

FY-86 FY-86 FY-86 FY-87 FY-87 FY-87 FY-88 FY-88 FY-88 FY-89 FY-89 FY-89

OFFICE ROUTING/LOCATION - ARTCC HOnolulu

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

22 Data General System 10 SP

Data General Letter Quality Printer

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

3 Workstations Letter Quality Printer Multi Function Printer Workstations Letter Quality Printer

1141111422 Multi Function Printer Workstation Letter Quality Printer Letter Quality Printers Multi Function Printers Workstations

IMPLEMENT DATE

FY-86 FY-86 FY-86 FY-87 FY-87 FY-87 FY-88 FY-88 FY-89 FY-89 FY-89

FY-86 FY-86 FY-86 FY-87 FY-87 FY-87 FY-88 FY-88 FY-89 FY-89 FY-89

WP 1370.6A MAY 2 1 1985 Appendix 2 LEVEL 2 TERM. & APPROACH

CFFICE ROUTING/LOCATION - Guam CERAP

CURRENT EOUIPMENT

CUANMTUULY TYPE/NODEL OF EOUIEMENT

1 Data General System 10 SP 1 Data General Letter Quality Printer 1 Data General MPT/100 Computer System

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE 2 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86

LEVEL 2 TERM. & APPROACH

LEVEL 2 TERM. & APPROACH

OFFICE ROTING/LOCATION - HilO ATCT

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT

FUTURE FOUIPMENT

OJANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE 2 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86

WP 1370.6A MAY 2 1 1985 Appendix 2

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Scottsdale ATCT

CURRENT EOUIPMENT

CURRENT EOUIPMENT

QUANTTTY TYFE/MODEL OF EOUIIMENT

FUTURE FOUIPMENT

QUANTITY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

2 Workstations FY-86 11 Letter Quality Printer Multi Function Printer FY-86 FY-86

LEVEL 2 TERM. & APPROACH

OFFICE ROTING/LOCATION - Santa ROSa ATCT

CURRENT EOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

QUANTITY TYPE/MODEL OF FOUIPMENT

FUIURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

2 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86

WP 1370.6A MAY 2 1 1985 Appendix 2 LEVEL 2 TERM. & APPROACH

OFFICE ROUTTNG/LOCATION - Santa MOnica ATCT

CURRENT EOUIPMENT

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL CF FOUIFMENT

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE 2 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86

LEVEL 2 TERM. & APPROACH

OFFICE ROUTTNG/LOCATION - San Carlos ATCT

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE 2 Workstations FY-86 1 1 Letter Quality Printer Multi Function Printer FY-86 FY-86

MAY 2 1 1985 WP 1370.6A Appendix 2 LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Sacramento ATCT (Executive Airport)

CURRENT EOUIPMENT

CURRENT EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIRMENT

FOTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIFMENT IMPLEMENT DATE

2 Workstations FY-86 1 Letter Quality Printer FY-86 1 Multi Function Printer FY-86

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Sacramento ATCT (Metro. Airport)

CURRENT FOUIPMENT

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

2 Workstations FY-86 1 Multi Function Printer FY-86 1 Letter Quality Printer FY-87

WP 1370.6A MAY 2 1 1985 Appendix 2 LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - San Diego ATCT (Gillespie Field Airport)

CURRENT EOUIPMENT

CURRENT EOUIPMENT

QJANTTTY TYFE/NODEL OF EOUIFNENT

FUTURE FOUIPMENT QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE 2 Workstations FY-86 1 Multi Function Printer FY-86 1 Letter Quality Printer FY-87

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Riverside ATCT

CURRENT FOUIPMENT QUANTTTY TYPE/MODEL OF EOUIPMENT

CURRENT FOUIPMENT QUANTTTY TYPE/MODEL OF EOUIPMENT

FUTURE FOUIPMENT QUANTITY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE 1 Multi Function Printer FY-86 Workstations FY-87 21 Letter Quality Printer FY-87

WP 1370.6A MAY 2 1 1985 Appendix 2 LEVEL 2 TERM. & APPROACH OFFICE ROUTING/LOCATION - San Jose ATCT (Reid - Hillview Airport) CURRENT FOUIPMENT

QUANTTTY TYPE/NODEL OF EOUIPMENT

QUANTTTY TYPE/NODEL OF EOUIPMENT

FUTURE EOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIFMENT IMPLEMENT DATE 1 Multi Function Printer FY-86 2 Workstations FY-87 1 Letter Quality Printer FY-87

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION- Carlsbad ATCT

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT

FUTURE EOUIPMENT

FUTURE EOUIPMENT

QUANTTTY TYPE/HODEL OF EOUIPMENT IMPLEMENT DATE

2 Workstations FY-87 1 Letter Quality Printer FY-87 1 Multi Function Printer FY-87

WP 1370.6A MAY 2 1 1985 Appendix 2 LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Palo Alto ATCT

CURRENT EOUIPMENT QUANTTTY TYPE/MOOEL CF EOUIPMENT

FUTURE EQUIPMENT QUANTITY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

FUTURE EQUIPMENT QUANTITY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

2 Workstations Letter Quality Printer FY-87 FY-87 11 Multi Function Printer FY-87

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Oxnard ATCT

CURRENT FOUIPMENT QUANTTTY TYPE/MODEL OF FOUIPMENT

FUTURE FOUIPMENT QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

FUTURE FOUIPMENT QUANTTTY TYPE/MODEL OF FOUIPMENT IMPLEMENT DATE

1 2 1 Workstations Letter Quality Printer Multi Function Printer FY-87 FY-87 FY-87

WP 1370.6A MAY 2 1 1985 Appendix 2

LEVEL 2 TERM. & APPROACH

OFFICE ROUTING/LOCATION - Ontario ATCT

CURRENT FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIRNENT

FUTURE FOUIPMENT

QUANTTTY TYPE/MODEL OF EOUIPMENT IMPLEMENT DATE

Continue reading ↓ 120 of 208 passages shown