Radar Vectors
FAA Notice Cancelled Issued Mar 21, 2012 AFS-400 37 pages Copy saved Nov 22, 2026

Notice N 8900.182 OPSEC/MSPEC/LOA C060 -- Category III Instrument Approach and Landing Operations

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

NOTICE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION N 8900.182

National Policy

Effective Date: 3/21/12

Cancellation Date: 3/21/13

SUBJ: OpSpec/MSpec/LOA C060, Category (CAT) III Instrument Approach and

Landing Operations

1. Purpose of This Notice. This notice provides revised guidance for Federal Aviation Administration (FAA) certificate-holding district offices (CHDO) and principal operations inspectors (POI) assigned to operators conducting airplane operations under Title 14 of the Code of Federal Regulations (14 CFR) parts 91, 91 subpart K (part 91K), 121, 125 (including the Letter of Deviation Authority (LODA) 125M operators), and 135. This notice amends and clarifies the authorization (operations specification (OpSpec)/management specification (MSpec)/letter of authorization (LOA) C060) for Category (CAT) III instrument approach and landing operations. This notice amends all C060 templates (i.e., OpSpec/MSpec/LOA C060) for operators conducting airplane operations under parts 91, 91K, 121, 125 (including the LODA 125M operators), and 135. This is a mandatory change to OpSpec/MSpec/LOA C060.

2. Audience.

2. Audience. The primary audience for this notice is FAA CHDOs and POIs assigned to operators conducting airplane operations under parts 91, 91K, 121, 125 (including the LODA 125M operators), and 135. The secondary audience includes Flight Standards Service (AFS) divisions and branches in the regions and in headquarters (HQ).

3. Where You Can Find This Notice.

3. Where You Can Find This Notice. You can find this notice on the MyFAA employee Web site at https://employees.faa.gov/tools_resources/orders_notices. Inspectors can access this notice through the Flight Standards Information Management System (FSIMS) at http://fsims.avs.faa.gov. Operators can find this notice on the FAA Web site at http://fsims.faa.gov. This notice is available to the public at http://www.faa.gov/regulations_policies/orders_notices.

4. Background.

4. Background. OpSpec/MSpec/LOA C060 authorizes and lists the requirements and limitations for CAT III approach and landing operations. The following changes have been made:

• The requirement to use landing minimums no lower than the published 14 CFR part 97 minimums is explicitly stated. • The introduction of midfield and rollout Runway Visual Range (RVR) values as a selectable in Table 1. • The rollout RVR required for fail passive (FP) landing system operations is no longer advisory, but is now required, controlling, and equal to the lowest charted RVR value.

Distribution: Electronic Only Initiated By: AFS-400

2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

• The authorization to use higher minimums in case of certain landing or rollout system degradations was added. • The requirements for a missed approach have been amended and clarified. • An optional authorization to conduct engine-inoperative CAT III operations has been added.

5. Guidance.

5. Guidance. The Flight Technologies and Procedures Division (AFS-400), in cooperation with the Air Transportation Division (AFS-200), the General Aviation and Commercial Division (AFS-800), the International Programs and Policy Division (AFS-50), and industry members of the Operations Specifications Working Group (OSWG), developed this notice. This notice contains the following:

• The sample OpSpec C060 template in Appendix A applies to part 121. • The sample OpSpec C060 template in Appendix B applies to part 125. • The sample OpSpec C060 template in Appendix C applies to part 135. • The sample OpSpec C060 template in Appendix D applies to part 121/135. • The sample LOA C060 template in Appendix E applies to part 91. • The sample MSpec MC060 template in Appendix F applies to part 91K. • The sample LOA C060 template in Appendix G applies to part 125 (LODA A125).

6. Action.

6. Action. POIs should review the revised guidance for issuance of OpSpec/MSpec/LOA C060. POIs should provide this notice to the operators for whom they are responsible, alerting them to updated operating procedures, as well as required pilot knowledge and training. This authorization is mandatory, with a compliance date of 90 days from the date of this notice.

7. Disposition. › Director, Flight Standards Service

7. Disposition. We will incorporate the information in this notice into FAA Order 8900.1 before this notice expires. Direct questions concerning the information in this notice to the Flight Operations Branch (AFS-410) at 202-385-4625.

for

John M. Allen Director, Flight Standards Service

Appendix A

Appendix A. › a. Authorization. The certificate holder is authorized to conduct…

Appendix A. Sample OpSpec Paragraph C060, Category III Instrument Approach

and Landing Operations: 14 CFR Part 121

a. Authorization. The certificate holder is authorized to conduct Category III (CAT III) instrument approach and landing operations using the limitations, provisions, procedures, and minimums specified in this paragraph.

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (1) The minima listed in Table 1, for the specific make, model, and…

b. Authorized CAT III Approach and Landing Minimums. The certificate holder is authorized to conduct CAT III approaches, considering all operational limitations in this paragraph, using minima which is the highest of:

(1) The minima listed in Table 1, for the specific make, model, and series of aircraft,

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (2) The lowest minima shown on the instrument approach procedure chart,…

(2) The lowest minima shown on the instrument approach procedure chart, or

(3) Minima in accordance with subparagraph d(5) below.

Table 1

Airplane M/M/S

Landing System*

Rollout System*

DH/AH TDZ/Mid/RO RVR

Special Operational Equipment and Limitations

Enter: *N/A = Not Applicable; FP = Fail-passive Landing or Rollout Control System; FO = Failoperational Landing or Rollout Control System.

c. Required Field Length and Special Operational Equipment and… › (1) The destination runway length shall be determined prior to takeoff…

c. Required Field Length and Special Operational Equipment and Limitations.

(1) The destination runway length shall be determined prior to takeoff to be at least 115 percent of the runway field length required by the provisions of 14 CFR part 121, § 121.195(b).

(2) The certificate holder shall not begin the final approach segment of a CAT III instrument approach unless:

(2) The certificate holder shall not begin the final approach segment… › (a) The special equipment listed in Table 1 is installed and…

(a) The special equipment listed in Table 1 is installed and operational, and the limitations listed or referenced in Table 1 are met, and

(b) If un-forecast adverse weather or failures occur, the runway length needed for landing is determined prior to approach. The runway to be used, reported runway and weather conditions, AFM limitations, operational procedures, and aircraft equipment status should be considered.

Appendix A. › d. Required RVR Reports. The certificate holder is authorized to…

d. Required RVR Reports. The certificate holder is authorized to conduct CAT III operations to minima as low as those shown in Table 2 with the type of airplane landing and rollout systems and minima authorized in Table 1. Only RVR reports for the runway of intended landing may be used.

A-1 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix A

Table 2

Landing System Rollout System TDZ RVR Mid RVR Rollout RVR FP or FO None 600 (175 m) 600 (175 m) 300 (75 m) FP FP or FO 600 (175 m) 400 (125 m) 300 (75 m) FO FP 400 (125 m) 400 (125 m) 300 (75 m) FO FO 300 (75 m) 300 (75 m) 300 (75 m)

d. Required RVR Reports. The certificate holder is authorized to… › (1) All RVR reports are required and controlling, except as specified…

(1) All RVR reports are required and controlling, except as specified in subparagraphs d(2), d(3), and d(4) below.

Note: All RVR reports must be no lower than the approach chart minima to conduct any CAT III operation.

(2) For operations using a Fail Passive landing system with a Fail Passive or Fail Operational rollout system, if either the mid or rollout RVR reporting system is temporarily inoperative, the operation may be initiated and continued using the TDZ and remaining RVR reporting systems.

d. Required RVR Reports. The certificate holder is authorized to… › (3) For operations using Fail Operational landing systems with a Fail…

(3) For operations using Fail Operational landing systems with a Fail Passive or Fail Operational rollout system, if any one of the RVR reporting systems is temporarily inoperative, the operation may be initiated and continued using the two remaining RVR reporting systems.

(4) Four RVR Reporting Systems. Where four RVR reporting systems are installed (i.e., touchdown zone, mid, rollout, and far end sensors), the far end sensor may provide advisory information to pilots or may be substituted for the rollout sensor RVR report if the rollout sensor RVR report is not available.

d. Required RVR Reports. The certificate holder is authorized to… › (5) If the landing or rollout system degrades from Fail Operational to…

(5) If the landing or rollout system degrades from Fail Operational to Fail Passive or the rollout system fails, operators are authorized to conduct operations in accordance with their MEL and AFM, using minima no lower than those shown in Table 2 corresponding to the type of landing and/or rollout systems operable after the failure. The RVR requirements of subparagraph d(1) still apply.

e. Pilot Qualifications and Approved CAT III Training Program. › (1) The minimums prescribed in this operations specification are…

e. Pilot Qualifications and Approved CAT III Training Program.

(1) The minimums prescribed in this operations specification are authorized for only those pilots-in-command and seconds-in-command who have completed the certificate holder’s approved CAT III training program and who have been qualified for CAT III operations by one of the certificate holder’s check airmen or FAA inspector.

e. Pilot Qualifications and Approved CAT III Training Program. › (2) Before conducting CAT III operations the pilot in command must meet…

(2) Before conducting CAT III operations the pilot in command must meet the requirements of § 121.652.

f. Operating Limitations. The certificate holder shall not begin the final approach segment of a CAT III instrument approach procedure, unless the latest controlling RVR reports for the landing runway are at or above the minimums authorized for the operation being conducted and all of the following conditions are met:

f. Operating Limitations. The certificate holder shall not begin the… › (1) The special operational equipment listed in Table 1 is installed…

A-2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix A

(1) The special operational equipment listed in Table 1 is installed and operational.

(2) The following ground-based equipment must be operational:

(a) Localizer and glideslope.

(2) The following ground-based equipment must be operational: › (b) Outer marker or DME facility used to define the final approach fix.

(b) Outer marker or DME facility used to define the final approach fix.

Note: A published waypoint or minimum GSIA fix may be used in lieu of an outer marker or DME fix.

(c) Touchdown zone lights.

(d) Runway centerline lights.

(e) High intensity runway lights.

(f) ALSF, SSALR, or SALS approach light system or foreign equivalent. Sequence flashing lights may be inoperative. However, after passing the outer marker or final approach fix, CAT III operations may be continued even though the approach lights become inoperative.

f. Operating Limitations. The certificate holder shall not begin the… › (3) All CAT III landing and subsequent ground operations shall be…

(3) All CAT III landing and subsequent ground operations shall be conducted in accordance with the airport’s low visibility operations plan (e.g., U.S. SMGCS, EASA, or ICAO criteria for CAT III operations).

(4) The crosswind component on the landing runway is less than the airplane flight manual’s crosswind limitations, or 15 knots or less, whichever is more restrictive.

f. Operating Limitations. The certificate holder shall not begin the… › (5) Once established on the final approach segment, all CAT III…

(5) Once established on the final approach segment, all CAT III operations, except as specified in subparagraph g(6) below, may continue if any RVR report decreases below the authorized minima.

g. Missed Approach Requirements. A missed approach shall be initiated when any of the following conditions exist:

g. Missed Approach Requirements. A missed approach shall be initiated… › (1) If the pilot determines that touch down cannot be safely…

(1) If the pilot determines that touch down cannot be safely accomplished within the touchdown zone.

(2) When any of the required runway lighting elements becomes inoperative prior to arriving at DH or AH, or prior to touchdown for aircraft without a rollout system.

(3) When any glideslope or localizer failure occurs prior to touchdown.

g. Missed Approach Requirements. A missed approach shall be initiated… › (4) The crosswind component at touch down is greater than 15 knots, or…

(4) The crosswind component at touch down is greater than 15 knots, or greater than the airplane flight manual’s crosswind limitations, whichever is more restrictive.

(5) When a failure in a Fail Passive landing system occurs prior to touch down, or a failure occurs in a Fail Operational system before reaching the AH.

g. Missed Approach Requirements. A missed approach shall be initiated… › (5) When a failure in a Fail Passive landing system occurs prior to…

A-3 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix A

(6) For CAT III operations without a rollout control system, no later than DH, if any controlling RVR is reported below the lowest authorized minima.

(7) For CAT III operations using a Fail Passive landing system without a rollout control system, or aircraft using a Fail Passive landing system and Fail Passive rollout control system:

(7) For CAT III operations using a Fail Passive landing system without… › (a) At the DH, if the pilot has not identified the required visual…

(a) At the DH, if the pilot has not identified the required visual references with the touchdown zone or touchdown zone lights to verify that the aircraft will touch down in the touchdown zone.

(b) If, after passing the DH, visual reference is lost or a reduction in visual reference occurs which prevents the pilot from continuing to verify that the aircraft will touch down in the touchdown zone.

Appendix A. › h. Authorized CAT III Runways. The certificate holder is authorized to…

h. Authorized CAT III Runways. The certificate holder is authorized to conduct 14 CFR part 97 CAT III instrument approach procedures at runways approved for such operations. CAT III operations are also authorized for the foreign airports and runways listed in Table 3 below.

Table 3

Foreign Airports and Runways Approved for CAT III Operations

Airport Name/Identifier &

Runway(s) Special Limitations

Appendix A. › i. CAT III Runway Restrictions. The certificate holder is authorized to…

i. CAT III Runway Restrictions. The certificate holder is authorized to conduct part 97 CAT III instrument approach procedures into the restricted U. S. facilities listed in Table 4 below.

Table 4

Runway and Aircraft Restrictions and Limiting Conditions for Part 97 CAT III Operations

Airport Name/Identifier, Runway(s) & CATIII Minima Restrictions & Limitations

Appendix A. › j. Maintenance. The certificate holder must maintain the aircraft and…

j. Maintenance. The certificate holder must maintain the aircraft and equipment listed in Table 1 in accordance with its approved lower landing minimums maintenance or inspection program.

k. Engine Inoperative Operations. The certificate holder is approved for engine inoperative CAT III operations using the aircraft and limitations specified in Table 5.

Appendix A. › k. Engine Inoperative Operations. The certificate holder is approved…

A-4 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix A

A-5 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Table 5

Engine Inoperative CAT III Operations Airplane M/M/S Operational Authorization Limitations

TEXT 99

Appendix B

Appendix B. › a. Authorization. The certificate holder is authorized to conduct…

Appendix B. Sample OpSpec Paragraph C060, Category III Instrument Approach

and Landing Operations: 14 CFR Part 125

a. Authorization. The certificate holder is authorized to conduct Category III (CAT III) instrument approach and landing operations using the limitations, provisions, procedures, and minimums specified in this paragraph.

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (1) The minima listed in Table 1, for the specific make, model, and…

b. Authorized CAT III Approach and Landing Minimums. The certificate holder is authorized to conduct CAT III approaches, considering all operational limitations in this paragraph, using minima which is the highest of:

(1) The minima listed in Table 1, for the specific make, model, and series of aircraft,

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (2) The lowest minima shown on the instrument approach procedure chart,…

(2) The lowest minima shown on the instrument approach procedure chart, or

(3) Minima in accordance with subparagraph d(5) below.

Table 1

Airplane M/M/S

Landing System*

Rollout System*

DH/AH TDZ/Mid/RO RVR

Special Operational Equipment and Limitations

Enter: *N/A = Not Applicable; FP = Fail-passive Landing or Rollout Control System; FO = Failoperational Landing or Rollout Control System.

c. Required Field Length and Special Operational Equipment and… › (1) The destination runway length shall be determined prior to takeoff…

c. Required Field Length and Special Operational Equipment and Limitations.

(1) The destination runway length shall be determined prior to takeoff to be at least 115 percent of the runway field length required by the airplane AFM.

(2) The certificate holder shall not begin the final approach segment of a CAT III instrument approach unless:

(2) The certificate holder shall not begin the final approach segment… › (a) The special equipment listed in Table 1 is installed and…

(a) The special equipment listed in Table 1 is installed and operational, and the limitations listed or referenced in Table 1 are met, and

(b) If un-forecast adverse weather or failures occur, the runway length needed for landing is determined prior to approach. The runway to be used, reported runway and weather conditions, AFM limitations, operational procedures, and aircraft equipment status should be considered.

Appendix B. › d. Required RVR Reports. The certificate holder is authorized to…

d. Required RVR Reports. The certificate holder is authorized to conduct CAT III operations to minima as low as those shown in Table 2 with the type of airplane landing and rollout systems and minima authorized in Table 1. Only RVR reports for the runway of intended landing may be used.

B-1 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix B

Table 2

Landing System Rollout System TDZ RVR Mid RVR Rollout RVR FP or FO None 600 (175 m) 600 (175 m) 300 (75 m) FP FP or FO 600 (175 m) 400 (125 m) 300 (75 m) FO FP 400 (125 m) 400 (125 m) 300 (75 m) FO FO 300 (75 m) 300 (75 m) 300 (75 m)

d. Required RVR Reports. The certificate holder is authorized to… › (1) All RVR reports are required and controlling, except as specified…

(1) All RVR reports are required and controlling, except as specified in subparagraphs d(2), d(3), and d(4) below.

Note: TDZ/Mid/Rollout RVR reports must be no lower than the approach chart minima to conduct any CAT III operation.

(2) For operations using a Fail Passive landing system with a Fail Passive or Fail Operational rollout system, if either the mid or rollout RVR reporting system is temporarily inoperative, the operation may be initiated and continued using the TDZ and remaining RVR reporting systems.

d. Required RVR Reports. The certificate holder is authorized to… › (3) For operations using Fail Operational landing systems with a Fail…

(3) For operations using Fail Operational landing systems with a Fail Passive or Fail Operational rollout system, if any one of the RVR reporting systems is temporarily inoperative, the operation may be initiated and continued using the two remaining RVR reporting systems.

(4) Four RVR Reporting Systems. Where four RVR reporting systems are installed (i.e., touchdown zone, mid, rollout, and far end sensors), the far end sensor may provide advisory information to pilots or may be substituted for the rollout sensor RVR report if the rollout sensor RVR report is not available.

d. Required RVR Reports. The certificate holder is authorized to… › (5) If the landing or rollout system degrades from Fail Operational to…

(5) If the landing or rollout system degrades from Fail Operational to Fail passive or the rollout system fails, operators are authorized to conduct operations in accordance with their MEL and AFM, using minima no lower than those shown in Table 2 corresponding to the type of landing and/or rollout systems operable after the failure. The RVR requirements of subparagraph d(1) still apply.

e. Pilot Qualifications and CAT III Training Program. › (1) The minimums prescribed in this operations specification are…

e. Pilot Qualifications and CAT III Training Program.

(1) The minimums prescribed in this operations specification are authorized for only those pilots-in-command and seconds-in-command who have completed the certificate holder’s CAT III training program and who have been qualified for CAT III operations by one of the certificate holder’s check airmen or FAA inspector.

e. Pilot Qualifications and CAT III Training Program. › (2) Before conducting CAT III operations the pilot in command must meet…

(2) Before conducting CAT III operations the pilot in command must meet the requirements of 14 CFR part 125, § 125.379.

f. Operating Limitations. The certificate holder shall not begin the final approach segment of a CAT III instrument approach procedure unless the latest controlling RVR reports for the landing runway are at or above the minimums authorized for the operation being conducted and all of the following conditions are met:

f. Operating Limitations. The certificate holder shall not begin the… › (1) The special operational equipment listed in Table 1 is installed…

B-2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix B

(1) The special operational equipment listed in Table 1 is installed and operational.

(2) The following ground-based equipment must be operational:

(a) Localizer and glideslope.

(2) The following ground-based equipment must be operational: › (b) Outer marker or DME facility used to define the final approach fix.

(b) Outer marker or DME facility used to define the final approach fix.

Note: A published waypoint or minimum GSIA fix may be used in lieu of an outer marker or DME fix.

(c) Touchdown zone lights.

(d) Runway centerline lights.

(e) High intensity runway lights.

(f) ALSF, SSALR, or SALS approach light system or foreign equivalent. Sequence flashing lights may be inoperative. However, after passing the outer marker or final approach fix, CAT III operations may be continued even though the approach lights become inoperative.

f. Operating Limitations. The certificate holder shall not begin the… › (3) All CAT III landing and subsequent ground operations shall be…

(3) All CAT III landing and subsequent ground operations shall be conducted in accordance with the airport’s low visibility operations plan (e.g., U.S. SMGCS, EASA, or ICAO criteria for CAT III operations).

(4) The crosswind component on the landing runway is less than the airplane flight manual’s crosswind limitations, or 15 knots or less, whichever is more restrictive.

f. Operating Limitations. The certificate holder shall not begin the… › (5) Once established on the final approach segment, all CAT III…

(5) Once established on the final approach segment, all CAT III operations, except as specified in subparagraph g(6) below, may continue if any RVR report decreases below the authorized minima.

g. Missed Approach Requirements. A missed approach shall be initiated when any of the following conditions exist:

g. Missed Approach Requirements. A missed approach shall be initiated… › (1) If the pilot determines that touch down cannot be safely…

(1) If the pilot determines that touch down cannot be safely accomplished within the touchdown zone.

(2) When any of the required runway lighting elements becomes inoperative prior to arriving at DH or AH, or prior to touchdown for aircraft without a rollout system.

(3) When any glideslope or localizer failure occurs prior to touchdown.

g. Missed Approach Requirements. A missed approach shall be initiated… › (4) The crosswind component at touch down is greater than 15 knots, or…

(4) The crosswind component at touch down is greater than 15 knots, or greater than the airplane flight manual’s crosswind limitations, whichever is more restrictive.

(5) When a failure in a Fail Passive landing system occurs prior to touch down, or a failure occurs in a Fail Operational system before reaching the AH.

g. Missed Approach Requirements. A missed approach shall be initiated… › (5) When a failure in a Fail Passive landing system occurs prior to…

B-3 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix B

(6) For CAT III operations without a rollout control system, no later than DH, if any controlling RVR is reported below the lowest authorized minima.

(7) For CAT III operations using a Fail Passive landing system without a rollout control system, or aircraft using a Fail Passive landing system and Fail Passive rollout control system:

(7) For CAT III operations using a Fail Passive landing system without… › (a) At the DH, if the pilot has not identified the required visual…

(a) At the DH, if the pilot has not identified the required visual references with the touchdown zone or touchdown zone lights to verify that the aircraft will touch down in the touchdown zone.

(b) If, after passing the DH, visual reference is lost or a reduction in visual reference occurs which prevents the pilot from continuing to verify that the aircraft will touch down in the touchdown zone.

Appendix B. › h. Authorized CAT III Runways. The certificate holder is authorized to…

h. Authorized CAT III Runways. The certificate holder is authorized to conduct 14 CFR part 97 CAT III instrument approach procedures at runways approved for such operations. CAT III operations are also authorized for the foreign airports and runways listed in Table 3 below.

Table 3

Foreign Airports and Runways Approved for CAT III Operations

Airport Name/Identifier &

Runway(s) Special Limitations

Appendix B. › i. CAT III Runway Restrictions. The certificate holder is authorized to…

i. CAT III Runway Restrictions. The certificate holder is authorized to conduct part 97 CAT III instrument approach procedures into the restricted U. S. facilities listed in Table 4 below.

Table 4

Runway and Aircraft Restrictions and Limiting Conditions for Part 97 CAT III Operations

Airport Name/Identifier, Runway(s) & CATIII Minima Restrictions & Limitations

Appendix B. › j. Maintenance. The certificate holder must maintain the aircraft and…

j. Maintenance. The certificate holder must maintain the aircraft and equipment listed in Table 1 in accordance with its approved lower landing minimums maintenance or inspection program.

k. Engine Inoperative Operations. The certificate holder is approved for engine inoperative CAT III operations using the aircraft and limitations specified in Table 5.

Appendix B. › k. Engine Inoperative Operations. The certificate holder is approved…

B-4 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix B

B-5 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Table 5

Engine Inoperative CAT III Operations Airplane M/M/S Operational Authorization Limitations

TEXT99

3/21/12 N 8900.182 Appendix C

Appendix C. › a. Authorization. The certificate holder is authorized to conduct…

Appendix C. Sample OpSpec Paragraph C060, Category III Instrument Approach

and Landing Operations: 14 CFR Part 135

a. Authorization. The certificate holder is authorized to conduct Category III (CAT III) instrument approach and landing operations using the limitations, provisions, procedures, and minimums specified in this paragraph.

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (1) The minima listed in Table 1, for the specific make, model, and…

b. Authorized CAT III Approach and Landing Minimums. The certificate holder is authorized to conduct CAT III approaches, considering all operational limitations in this paragraph, using minima which is the highest of:

(1) The minima listed in Table 1, for the specific make, model, and series of aircraft,

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (2) The lowest minima shown on the instrument approach procedure chart,…

(2) The lowest minima shown on the instrument approach procedure chart, or

(3) Minima in accordance with subparagraph d(5) below.

Table 1

Airplane M/M/S

Landing System*

Rollout System*

DH/AH TDZ/Mid/RO RVR

Special Operational Equipment and Limitations

Enter: *N/A = Not Applicable; FP = Fail-passive Landing or Rollout Control System; FO = Failoperational Landing or Rollout Control System.

c. Required Field Length and Special Operational Equipment and… › (1) The destination runway length shall be determined prior to takeoff…

c. Required Field Length and Special Operational Equipment and Limitations.

(1) The destination runway length shall be determined prior to takeoff to be at least 115percent of the runway field length required by the provisions of 14 CFR part 135, § 135.385(b).

(2) The certificate holder shall not begin the final approach segment of a CAT III instrument approach unless:

(2) The certificate holder shall not begin the final approach segment… › (a) The special equipment listed in Table 1 is installed and…

(a) The special equipment listed in Table 1 is installed and operational, and the limitations listed or referenced in Table 1 are met, and

(b) If un-forecast adverse weather or failures occur, the runway length needed for landing is determined prior to approach. The runway to be used, reported runway and weather conditions, AFM limitations, operational procedures, and aircraft equipment status should be considered.

Appendix C. › d. Required RVR Reports. The certificate holder is authorized to…

d. Required RVR Reports. The certificate holder is authorized to conduct CAT III operations to minima as low as those shown in Table 2 with the type of airplane landing and rollout systems and minima authorized in Table 1. Only RVR reports for the runway of intended landing may be used.

C-1 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix C

Table 2

Landing System Rollout System TDZ RVR Mid RVR Rollout RVR FP or FO None 600 (175 m) 600 (175 m) 300 (75 m) FP FP or FO 600 (175 m) 400 (125 m) 300 (75 m) FO FP 400 (125 m) 400 (125 m) 300 (75 m) FO FO 300 (75 m) 300 (75 m) 300 (75 m)

d. Required RVR Reports. The certificate holder is authorized to… › (1) All RVR reports are required and controlling, except as specified…

(1) All RVR reports are required and controlling, except as specified in subparagraphs d(2), d(3), and d(4) below.

Note: TDZ/Mid/Rollout RVR reports must be no lower than the approach chart minima to conduct any CAT III operation.

(2) For operations using a Fail Passive landing system with a Fail Passive or Fail Operational rollout system, if either the mid or rollout RVR reporting system is temporarily inoperative, the operation may be initiated and continued using the TDZ and remaining RVR reporting systems.

d. Required RVR Reports. The certificate holder is authorized to… › (3) For operations using Fail Operational landing systems with a Fail…

(3) For operations using Fail Operational landing systems with a Fail Passive or Fail Operational rollout system, if any one of the RVR reporting systems is temporarily inoperative, the operation may be initiated and continued using the two remaining RVR reporting systems.

(4) Four RVR Reporting Systems. Where four RVR reporting systems are installed (i.e., touchdown zone, mid, rollout, and far end sensors), the far end sensor may provide advisory information to pilots or may be substituted for the rollout sensor RVR report if the rollout sensor RVR report is not available.

d. Required RVR Reports. The certificate holder is authorized to… › (5) If the landing or rollout system degrades from Fail Operational to…

(5) If the landing or rollout system degrades from Fail Operational to Fail Passive or the rollout system fails, operators are authorized to conduct operations in accordance with their MEL and AFM, using minima no lower than those shown in Table 2 corresponding to the type of landing and/or rollout systems operable after the failure. The RVR requirements of subparagraph d(1) still apply.

e. Pilot Qualifications and Approved CAT III Training Program. › (1) The minimums prescribed in this operations specification are…

e. Pilot Qualifications and Approved CAT III Training Program.

(1) The minimums prescribed in this operations specification are authorized for only those pilots-in-command and seconds-in-command who have completed the certificate holder’s approved CAT III training program and who have been qualified for CAT III operations by one of the certificate holder’s check airmen or FAA inspector.

e. Pilot Qualifications and Approved CAT III Training Program. › (2) Before conducting CAT III operations the pilot in command must meet…

(2) Before conducting CAT III operations the pilot in command must meet the requirements of § 135.225(e).

f. Operating Limitations. The certificate holder shall not begin the final approach segment of a CAT III instrument approach procedure unless the latest controlling RVR reports for the landing runway are at or above the minimums authorized for the operation being conducted and all of the following conditions are met:

f. Operating Limitations. The certificate holder shall not begin the… › (1) The special operational equipment listed in Table 1 is installed…

C-2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix C

(1) The special operational equipment listed in Table 1 is installed and operational.

(2) The following ground-based equipment must be operational:

(a) Localizer and glideslope.

(2) The following ground-based equipment must be operational: › (b) Outer marker or DME facility used to define the final approach fix.

(b) Outer marker or DME facility used to define the final approach fix.

Note: A published waypoint or minimum GSIA fix may be used in lieu of an outer marker or DME fix.

(c) Touchdown zone lights.

(d) Runway centerline lights.

(e) High intensity runway lights.

(f) ALSF, SSALR, or SALS approach light system or foreign equivalent. Sequence flashing lights may be inoperative. However, after passing the outer marker or final approach fix, CAT III operations may be continued even though the approach lights become inoperative.

f. Operating Limitations. The certificate holder shall not begin the… › (3) All CAT III landing and subsequent ground operations shall be…

(3) All CAT III landing and subsequent ground operations shall be conducted in accordance with the airport’s low visibility operations plan (e.g., U.S. SMGCS, EASA, or ICAO criteria for CAT III operations).

(4) The crosswind component on the landing runway is less than the airplane flight manual’s crosswind limitations, or 15 knots or less, whichever is more restrictive.

f. Operating Limitations. The certificate holder shall not begin the… › (5) Once established on the final approach segment, all CAT III…

(5) Once established on the final approach segment, all CAT III operations, except as specified in subparagraph g(6) below, may continue if any RVR report decreases below the authorized minima.

g. Missed Approach Requirements. A missed approach shall be initiated when any of the following conditions exist:

g. Missed Approach Requirements. A missed approach shall be initiated… › (1) If the pilot determines that touch down cannot be safely…

(1) If the pilot determines that touch down cannot be safely accomplished within the touchdown zone.

(2) When any of the required runway lighting elements becomes inoperative prior to arriving at DH or AH, or prior to touchdown for aircraft without a rollout system.

(3) When any glideslope or localizer failure occurs prior to touchdown.

g. Missed Approach Requirements. A missed approach shall be initiated… › (4) The crosswind component at touch down is greater than 15 knots, or…

(4) The crosswind component at touch down is greater than 15 knots, or greater than the airplane flight manual’s crosswind limitations, whichever is more restrictive.

(5) When a failure in a Fail Passive landing system occurs prior to touch down, or a failure occurs in a Fail Operational system before reaching the AH.

g. Missed Approach Requirements. A missed approach shall be initiated… › (5) When a failure in a Fail Passive landing system occurs prior to…

C-3 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix C

(6) For CAT III operations without a rollout control system, no later than DH, if any controlling RVR is reported below the lowest authorized minima.

(7) For CAT III operations using a Fail Passive landing system without a rollout control system, or aircraft using a Fail Passive landing system and Fail Passive rollout control system:

(7) For CAT III operations using a Fail Passive landing system without… › (a) At the DH, if the pilot has not identified the required visual…

(a) At the DH, if the pilot has not identified the required visual references with the touchdown zone or touchdown zone lights to verify that the aircraft will touch down in the touchdown zone.

(b) If, after passing the DH, visual reference is lost or a reduction in visual reference occurs which prevents the pilot from continuing to verify that the aircraft will touch down in the touchdown zone.

Appendix C. › h. Authorized CAT III Runways. The certificate holder is authorized to…

h. Authorized CAT III Runways. The certificate holder is authorized to conduct 14 CFR part 97 CAT III instrument approach procedures at runways approved for such operations. CAT III operations are also authorized for the foreign airports and runways listed in Table 3 below.

Table 3

Foreign Airports and Runways Approved for CAT III Operations

Airport Name/Identifier &

Runway(s) Special Limitations

Appendix C. › i. CAT III Runway Restrictions. The certificate holder is authorized to…

i. CAT III Runway Restrictions. The certificate holder is authorized to conduct Part 97 CAT III instrument approach procedures into the restricted U. S. facilities listed in Table 4 below.

Table 4

Runway and Aircraft Restrictions and Limiting Conditions for Part 97 CAT III Operations

Airport Name/Identifier, Runway(s) & CATIII Minima Restrictions & Limitations

Appendix C. › j. Maintenance. The certificate holder must maintain the aircraft and…

j. Maintenance. The certificate holder must maintain the aircraft and equipment listed in Table 1 in accordance with its approved lower landing minimums maintenance or inspection program.

k. Engine Inoperative Operations. The certificate holder is approved for engine inoperative CAT III operations using the aircraft and limitations specified in Table 5.

Appendix C. › k. Engine Inoperative Operations. The certificate holder is approved…

C-4 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix C

C-5 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Table 5

Engine Inoperative CAT III Operations Airplane M/M/S Operational Authorization Limitations

TEXT99

3/21/12 N 8900.182 Appendix D

Appendix D. › a. Authorization. The certificate holder is authorized to conduct…

Appendix D. Sample OpSpec Paragraph C060, Category III Instrument Approach

and Landing Operations: 14 CFR Part 121/135

a. Authorization. The certificate holder is authorized to conduct Category III (CAT III) instrument approach and landing operations using the limitations, provisions, procedures, and minimums specified in this paragraph.

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (1) The minima listed in Table 1, for the specific make, model, and…

b. Authorized CAT III Approach and Landing Minimums. The certificate holder is authorized to conduct CAT III approaches, considering all operational limitations in this paragraph, using minima which is the highest of:

(1) The minima listed in Table 1, for the specific make, model, and series of aircraft,

b. Authorized CAT III Approach and Landing Minimums. The certificate… › (2) The lowest minima shown on the instrument approach procedure chart,…

(2) The lowest minima shown on the instrument approach procedure chart, or

(3) Minima in accordance with subparagraph d(5) below.

Table 1

Airplane M/M/S

Landing System*

Rollout System*

DH/AH TDZ/Mid/RO RVR

Special Operational Equipment and Limitations

Enter: *N/A = Not Applicable; FP = Fail-passive Landing or Rollout Control System; FO = Failoperational Landing or Rollout Control System.

c. Required Field Length and Special Operational Equipment and… › (1) The destination runway length shall be determined prior to takeoff…

c. Required Field Length and Special Operational Equipment and Limitations.

(1) The destination runway length shall be determined prior to takeoff to be at least 115 percent of the runway field length required by the provisions of 14 CFR part 121, § 121.195(b).

(2) The certificate holder shall not begin the final approach segment of a CAT III instrument approach unless:

(2) The certificate holder shall not begin the final approach segment… › (a) The special equipment listed in Table 1 is installed and…

(a) The special equipment listed in Table 1 is installed and operational, and the limitations listed or referenced in Table 1 are met, and

(b) If un-forecast adverse weather or failures occur, the runway length needed for landing is determined prior to approach. The runway to be used, reported runway and weather conditions, AFM limitations, operational procedures, and aircraft equipment status should be considered.

Appendix D. › d. Required RVR Reports. The certificate holder is authorized to…

d. Required RVR Reports. The certificate holder is authorized to conduct CAT III operations to minima as low as those shown in Table 2 with the type of airplane landing and rollout systems and minima authorized in Table 1. Only RVR reports for the runway of intended landing may be used.

D-1 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix D

Table 2

Landing System Rollout System TDZ RVR Mid RVR Rollout RVR FP or FO None 600 (175 m) 600 (175 m) 300 (75 m) FP FP or FO 600 (175 m) 400 (125 m) 300 (75 m) FO FP 400 (125 m) 400 (125 m) 300 (75 m) FO FO 300 (75 m) 300 (75 m) 300 (75 m)

d. Required RVR Reports. The certificate holder is authorized to… › (1) All RVR reports are required and controlling, except as specified…

(1) All RVR reports are required and controlling, except as specified in subparagraphs d(2), d(3), and d(4) below.

Note: TDZ/Mid/Rollout RVR reports must be no lower than the approach chart minima to conduct any CAT III operation.

(2) For operations using a Fail Passive landing system with a Fail Passive or Fail Operational rollout system, if either the mid or rollout RVR reporting system is temporarily inoperative, the operation may be initiated and continued using the TDZ and remaining RVR reporting systems.

d. Required RVR Reports. The certificate holder is authorized to… › (3) For operations using Fail Operational landing systems with a Fail…

(3) For operations using Fail Operational landing systems with a Fail Passive or Fail Operational rollout system, if any one of the RVR reporting systems is temporarily inoperative, the operation may be initiated and continued using the two remaining RVR reporting systems.

(4) Four RVR Reporting Systems. Where four RVR reporting systems are installed (i.e., touchdown zone, mid, rollout, and far end sensors), the far end sensor may provide advisory information to pilots or may be substituted for the rollout sensor RVR report if the rollout sensor RVR report is not available.

d. Required RVR Reports. The certificate holder is authorized to… › (5) If the landing or rollout system degrades from Fail Operational to…

(5) If the landing or rollout system degrades from Fail Operational to Fail Passive or the rollout system fails, operators are authorized to conduct operations in accordance with their MEL and AFM, using minima no lower than those shown in Table 2 corresponding to the type of landing and/or rollout systems operable after the failure. The RVR requirements of subparagraph d(1) still apply.

e. Pilot Qualifications and Approved CAT III Training Program. › (1) The minimums prescribed in this operations specification are…

e. Pilot Qualifications and Approved CAT III Training Program.

(1) The minimums prescribed in this operations specification are authorized for only those pilots-in-command and seconds-in-command who have completed the certificate holder’s approved CAT III training program and who have been qualified for CAT III operations by one of the certificate holder’s check airmen or FAA inspector.

e. Pilot Qualifications and Approved CAT III Training Program. › (2) Before conducting CAT III operations the pilot in command must meet…

(2) Before conducting CAT III operations the pilot in command must meet the requirements of § 121.652 or 14 CFR part 135, § 135.225(e), (as applicable).

f. Operating Limitations. The certificate holder shall not begin the final approach segment of a CAT III instrument approach procedure unless the latest controlling RVR reports for the landing runway are at or above the minimums authorized for the operation being conducted and all of the following conditions are met:

f. Operating Limitations. The certificate holder shall not begin the… › (1) The special operational equipment listed in Table 1 is installed…

D-2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix D

(1) The special operational equipment listed in Table 1 is installed and operational.

(2) The following ground-based equipment must be operational:

(a) Localizer and glideslope.

(2) The following ground-based equipment must be operational: › (b) Outer marker or DME facility used to define the final approach fix.

(b) Outer marker or DME facility used to define the final approach fix.

Note: A published waypoint or minimum GSIA fix may be used in lieu of an outer marker or DME fix.

(c) Touchdown zone lights.

(d) Runway centerline lights.

(e) High intensity runway lights.

(f) ALSF, SSALR, or SALS approach light system or foreign equivalent. Sequence flashing lights may be inoperative. However, after passing the outer marker or final approach fix, CAT III operations may be continued even though the approach lights become inoperative.

f. Operating Limitations. The certificate holder shall not begin the… › (3) All CAT III landing and subsequent ground operations shall be…

(3) All CAT III landing and subsequent ground operations shall be conducted in accordance with the airport’s low visibility operations plan (e.g., U.S. SMGCS, EASA, or ICAO criteria for CAT III operations).

(4) The crosswind component on the landing runway is less than the airplane flight manual’s crosswind limitations, or 15 knots or less, whichever is more restrictive.

f. Operating Limitations. The certificate holder shall not begin the… › (5) Once established on the final approach segment, all CAT III…

(5) Once established on the final approach segment, all CAT III operations, except as specified in subparagraph g(6) below, may continue if any RVR report decreases below the authorized minima.

g. Missed Approach Requirements. A missed approach shall be initiated when any of the following conditions exist:

g. Missed Approach Requirements. A missed approach shall be initiated… › (1) If the pilot determines that touch down cannot be safely…

(1) If the pilot determines that touch down cannot be safely accomplished within the touchdown zone.

(2) When any of the required runway lighting elements becomes inoperative prior to arriving at DH or AH, or prior to touchdown for aircraft without a rollout system.

(3) When any glideslope or localizer failure occurs prior to touchdown.

g. Missed Approach Requirements. A missed approach shall be initiated… › (4) The crosswind component at touch down is greater than 15 knots, or…

(4) The crosswind component at touch down is greater than 15 knots, or greater than the airplane flight manual’s crosswind limitations, whichever is more restrictive.

(5) When a failure in a Fail Passive landing system occurs prior to touch down, or a failure occurs in a Fail Operational system before reaching the AH.

g. Missed Approach Requirements. A missed approach shall be initiated… › (5) When a failure in a Fail Passive landing system occurs prior to…

D-3 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix D

(6) For CAT III operations without a rollout control system, no later than DH, if any controlling RVR is reported below the lowest authorized minima.

(7) For CAT III operations using a Fail Passive landing system without a rollout control system, or aircraft using a Fail Passive landing system and Fail Passive rollout control system:

(7) For CAT III operations using a Fail Passive landing system without… › (a) At the DH, if the pilot has not identified the required visual…

(a) At the DH, if the pilot has not identified the required visual references with the touchdown zone or touchdown zone lights to verify that the aircraft will touch down in the touchdown zone.

(b) If, after passing the DH, visual reference is lost or a reduction in visual reference occurs which prevents the pilot from continuing to verify that the aircraft will touch down in the touchdown zone.

Appendix D. › h. Authorized CAT III Runways. The certificate holder is authorized to…

h. Authorized CAT III Runways. The certificate holder is authorized to conduct 14 CFR part 97 CAT III instrument approach procedures at runways approved for such operations. CAT III operations are also authorized for the foreign airports and runways listed in Table 3 below.

Table 3

Foreign Airports and Runways Approved for CAT III Operations

Airport Name/Identifier &

Runway(s) Special Limitations

Appendix D. › i. CAT III Runway Restrictions. The certificate holder is authorized to…

i. CAT III Runway Restrictions. The certificate holder is authorized to conduct part 97 CAT III instrument approach procedures into the restricted U. S. facilities listed in Table 4 below.

Table 4

Runway and Aircraft Restrictions and Limiting Conditions for Part 97 CAT III Operations

Airport Name/Identifier, Runway(s) & CATIII Minima Restrictions & Limitations

Appendix D. › j. Maintenance. The certificate holder must maintain the aircraft and…

j. Maintenance. The certificate holder must maintain the aircraft and equipment listed in Table 1 in accordance with its approved lower landing minimums maintenance or inspection program.

k. Engine Inoperative Operations. The certificate holder is approved for engine inoperative CAT III operations using the aircraft and limitations specified in Table 5.

Appendix D. › k. Engine Inoperative Operations. The certificate holder is approved…

D-4 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

3/21/12 N 8900.182 Appendix D

D-5 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Table 5

Engine Inoperative CAT III Operations Airplane M/M/S Operational Authorization Limitations

TEXT99

Appendix E

Appendix E.

Appendix E. Sample LOA C060, Category III Instrument Approach and Landing

Operations: 14 CFR Part 91

Letter of Authorization Category III Instrument Approach and Landing Operations

1. Authorization. The Operator is authorized to conduct Category III (CAT III) instrument approach and landing operations using the limitations, provisions, procedures, and minimums specified in this Letter of Authorization (LOA).

2. Authorized CAT III Approach and Landing Minimums. › a. The minima listed in Table 1, for the specific make, model, and…

2. Authorized CAT III Approach and Landing Minimums. The Operator is authorized to conduct CAT III approaches, considering all operational limitations in this paragraph, using minima which is the highest of:

a. The minima listed in Table 1, for the specific make, model, and series of aircraft,

2. Authorized CAT III Approach and Landing Minimums. › b. The lowest minima shown on the instrument approach procedure chart,…

b. The lowest minima shown on the instrument approach procedure chart, or

c. Minima in accordance with subparagraph 4(e) below.

Table 1

Airplane M/M/S

Landing System*

Rollout System*

DH/AH TDZ/Mid/RO RVR

Special Operational Equipment and Limitations

Enter: *N/A = Not Applicable; FP = Fail-passive Landing or Rollout Control System; FO = Failoperational Landing or Rollout Control System.

3. Required Field Length and Special Operational Equipment and… › a. The destination runway length shall be determined prior to takeoff…

3. Required Field Length and Special Operational Equipment and Limitations.

a. The destination runway length shall be determined prior to takeoff to be at least 115 percent of the runway field length required by the airplane AFM.

b. The certificate holder shall not begin the final approach segment of a CAT III instrument approach unless:

b. The certificate holder shall not begin the final approach segment of… › (1) The special equipment listed in Table 1 is installed and…

(1) The special equipment listed in Table 1 is installed and operational, and the limitations listed or referenced in Table 1 are met, and

(2) If un-forecast adverse weather or failures occur, the runway length needed for landing is determined prior to approach. The runway to be used, reported runway and weather conditions, AFM limitations, operational procedures, and aircraft equipment status should be considered.

Category III Instrument Approach and Landing Operations › 4. Required RVR Reports.

4. Required RVR Reports. The Operator is authorized to conduct CAT III operations to minima as low as those shown in Table 2 with the type of airplane landing and rollout systems and minima authorized in Table 1. Only RVR reports for the runway of intended landing may be used.

E-1 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix E

Table 2

Landing System Rollout System TDZ RVR Mid RVR Rollout RVR FP or FO None 600 (175 m) 600 (175 m) 300 (75 m) FP FP or FO 600 (175 m) 400 (125 m) 300 (75 m) FO FP 400 (125 m) 400 (125 m) 300 (75 m) FO FO 300 (75 m) 300 (75 m) 300 (75 m)

4. Required RVR Reports. › a. All RVR reports are required and controlling except as specified in…

a. All RVR reports are required and controlling except as specified in subparagraphs 4(b), 4(c) and 4(d) below.

Note: TDZ/Mid/Rollout RVR reports must be no lower than the approach chart minima to conduct any CAT III operation.

b. For operations using a Fail Passive landing system with a Fail Passive or Fail Operational rollout system, if either the mid or rollout RVR reporting system is temporarily inoperative, the operation may be initiated and continued using the TDZ and remaining RVR reporting systems.

4. Required RVR Reports. › c. For operations using Fail Operational landing systems with a Fail…

c. For operations using Fail Operational landing systems with a Fail Passive or Fail Operational rollout system, if any one of the RVR reporting systems is temporarily inoperative, the operation may be initiated and continued using the two remaining RVR reporting systems.

d. Four RVR Reporting Systems. Where four RVR reporting systems are installed (i.e., touchdown zone, mid, rollout, and far end sensors), the far end sensor may provide advisory information to pilots or may be substituted for the rollout sensor RVR report if the rollout sensor RVR report is not available.

4. Required RVR Reports. › e. If the landing or rollout system degrades from Fail Operational to…

e. If the landing or rollout system degrades from Fail Operational to Fail Passive or the rollout system fails, Operators are authorized to conduct operations in accordance with their MEL and AFM, using minima no lower than those shown in Table 2 corresponding to the type of landing and/or rollout systems operable after the failure. The RVR requirements of subparagraph 4(a) still apply.

5. Pilot Qualifications and Approved CAT III Training Program. › a. The minimums prescribed in this LOA are authorized for only those…

5. Pilot Qualifications and Approved CAT III Training Program.

a. The minimums prescribed in this LOA are authorized for only those pilots-in-command and seconds-in-command who have completed the Operator’s CAT III training program and who have been qualified for CAT III operations by an approved Training Center Evaluator or FAA inspector.

5. Pilot Qualifications and Approved CAT III Training Program. › b. Flightcrew training is conducted by . In accordance with 14 CFR part…

b. Flightcrew training is conducted by . In accordance with 14 CFR part 91, §§ 91.3 and 91.703(a)(1)(2) and ICAO Annex 2 (Rules of the Air), paragraph 2.3.2 (Pre-flight action), crews are responsible for policies and procedures in areas of operations where flights are conducted.

Category III Instrument Approach and Landing Operations › 6. Operating Limitations.

6. Operating Limitations. The Operator shall not begin the final approach segment of a CAT III instrument approach procedure unless the latest controlling RVR reports for the landing runway

E-2 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix E

are at or above the minimums authorized for the operation being conducted and all of the following conditions are met:

6. Operating Limitations. › a. The special operational equipment listed in Table 1 is installed and…

a. The special operational equipment listed in Table 1 is installed and operational.

b. The following ground-based equipment must be operational:

(1) Localizer and glideslope.

(2) Outer marker or DME facility used to define the final approach fix.

Note: A published waypoint or minimum GSIA fix may be used in lieu of an outer marker or DME fix.

b. The following ground-based equipment must be operational: › (3) Touchdown zone lights.

(3) Touchdown zone lights.

(4) Runway centerline lights.

(5) High intensity runway lights.

(6) ALSF, SSALR, or SALS approach light system or foreign equivalent. Sequence flashing lights may be inoperative. However, after passing the outer marker or final approach fix, CAT III approach and landing may be continued even though the approach lights become inoperative.

6. Operating Limitations. › c. All CAT III landing and subsequent ground operations shall be…

c. All CAT III landing and subsequent ground operations shall be conducted in accordance with the airport’s low visibility operations plan (e.g., U.S. SMGCS, EASA, or ICAO criteria for CAT III operations).

d. The crosswind component on the landing runway is less than the airplane flight manual’s crosswind limitations, or 15 knots or less, whichever is more restrictive.

6. Operating Limitations. › e. Once established on the final approach segment, all CAT III…

e. Once established on the final approach segment, all CAT III operations, except as specified in subparagraph 7(f) below, may continue if any RVR report decreases below the authorized minima.

7. Missed Approach Requirements. A missed approach shall be initiated when any of the following conditions exist:

7. Missed Approach Requirements. › a. If the pilot determines that touch down cannot be safely…

a. If the pilot determines that touch down cannot be safely accomplished within the touchdown zone.

b. When any of the required runway lighting elements becomes inoperative prior to arriving at DH or AH, or prior to touchdown for aircraft without a rollout system.

c. When any glideslope or localizer failure occurs prior to touchdown.

7. Missed Approach Requirements. › c. When any glideslope or localizer failure occurs prior to touchdown.

E-3 UNCONTROLLED COPY WHEN DOWNLOADED Check with FSIMS to verify current version before using

Appendix E

d. The crosswind component at touch down is greater than 15 knots, or greater than the airplane flight manual’s crosswind limitations, whichever is more restrictive.

e. When a failure in a Fail Passive landing system occurs prior to touch down, or a failure occurs in a Fail Operational system before reaching the AH.

7. Missed Approach Requirements. › f. For CAT III operations without a rollout control system, no later…

f. For CAT III operations without a rollout control system, no later than DH, if any controlling RVR is reported below the lowest authorized minima.

g. For CAT III operations using a Fail Passive landing system without a rollout control system, or aircraft using a Fail Passive landing system and Fail Passive rollout control system:

g. For CAT III operations using a Fail Passive landing system without a… › (1) At the DH, if the pilot has not identified the required visual…

(1) At the DH, if the pilot has not identified the required visual references with the touchdown zone or touchdown zone lights to verify that the aircraft will touch down in the touchdown zone.

(2) If, after passing the DH, visual reference is lost or a reduction in visual reference occurs which prevents the pilot from continuing to verify that the aircraft will touch down in the touchdown zone.

Category III Instrument Approach and Landing Operations › 8. Authorized CAT III Runways.

8. Authorized CAT III Runways. The Operator is authorized to conduct 14 CFR part 97 CAT III instrument approach procedures at runways approved for such operations. CAT III operations are also authorized for the foreign airports and runways listed in Table 3 below.

Table 3

Foreign Airports and Runways Approved for CAT III Operations

Airport Name/Identifier &

Runway(s) Special Limitations

Continue reading ↓ 120 of 171 passages shown