Radar Vectors
FAA Notice Cancelled Issued Jul 27, 2007 AFS-900 165 pages Copy saved Nov 22, 2026

Notice N 8900.11 Air Transportation Oversight System Version 1.2

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

NOTICE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION N 8900.11

National Policy

Effective Date: 7/27/07

Cancellation Date: 7/27/08

SUBJ: Air Transportation Oversight System Version 1.2

1. Purpose of This Notice. This notice contains direction and guidance for aviation safety inspectors (ASI) about the Air Transportation Oversight System version 1.2 (ATOS 1.2) as the system safety approach to Federal Aviation Administration (FAA) certification, surveillance, and certificate management. ATOS 1.2 is the FAA’s business process for Title 14 of the Code of Federal Regulations (14 CFR) part 121 air carrier oversight. Exceptions to the requirements and standards described in this notice must have the specific approval of the Flight Standards Certification and Surveillance Division, AFS-900.

2. Audience. The primary audience for this notice is Flight Standards District Office ASIs who have responsibility for part 121 air carrier oversight. The secondary audience includes Flight Standards branches and divisions in the regions and in headquarters.

3. Where You Can Find This Notice. Inspectors can access this notice through the Flight Standards Information Management System (FSIMS) at http://fsims.avr.faa.gov. Operators may find this information on the FAA’s Web site at: http://www.faa.gov/library/manuals/examiners_inspectors/8900/.

4. Background. ATOS is the system the FAA uses to provide regulatory oversight of part 121 air carriers that hold operations specifications issued in accordance with 14 CFR part 119. The objective of ATOS is to ensure that the Flight Standards Service (AFS) and air carriers meet their separate responsibilities in accordance with Title 49 of the United States Code (49 U.S.C.), 14 CFR, and FAA policy. Title 49 U.S.C. empowers the FAA to prescribe regulations and minimum safety standards, and requires air carriers to provide service with the highest possible degree of safety in the public interest.

a. On October 1, 1998 FAA implemented ATOS version 1.0 for an initial cadre of air carriers. There were 10 initial ATOS air carriers; they had the largest number of passenger enplanements. AFS established a Continuous ATOS Development (CAD) team in 1999 to complete, review, and revise the ATOS processes. The CAD effort resulted in revised data collection tools and ATOS version 1.1.

b. In January 2005, we established the System Approach for Safety Oversight (SASO) part 121 pilot project in response to a request by the FAA chief financial officer to design, develop, and demonstrate standard system safety-based oversight for all part 121 air carriers.

Distribution: A-W(FS)-2; A-X(FS)-3; A-FFS-7 (LTD); AMA-200 (12 cys) Initiated By: AFS-900 (Electronically: A-W(FS)-2; A-X(FS)-2; A-FFS-7)

7/27/07 N 8900.11

c. In August 2005 AFS management decided to focus the objectives of the SASO part 121 pilot project on the problems and challenges of transitioning all part 121 air carriers to ATOS.

d. We initiated the ATOS 1.2 project to accomplish the activities for a successful transition of all remaining part 121 air carriers.

5. Action. ASIs assigned to ATOS Certificate Management Teams (CMT) transitioned to ATOS 1.2 will use the policy and guidance in this notice to perform part 121 air carrier oversight. ASIs assigned to Certification Project Teams will use the policy and guidance in this notice to perform part 121 air carrier certifications.

6. Disposition. We will permanently incorporate the information in this notice in FSIMS before this notice expires. Direct questions regarding this notice to Dave Gilliom, Manager, Flight Standards Certification and Surveillance Division, AFS-900, at (703) 661-0550.

ORIGINAL SIGNED by Carol Giles for James J. Ballough Director, Flight Standards Service

7/27/07 N 8900.11

Table of Contents › Paragraph Page

Table of Contents

Paragraph Page

Appendix A. Concepts and Overview … A-1

Chapter 1. Air Transportation Oversight System Doctrine … A-1

1. Purpose … A-1 2. Statutory Authority … A-1 3. Policy Statement of the FAA as it Pertains to Promoting Aviation Safety for Air Carriers … A-1 4. ATOS Concepts and Principles … A-2

Chapter 2. Introduction to ATOS Business Process and Tools A › Figure 25. Comparison of the ATOS Business Process and

Chapter 2. Introduction to ATOS Business Process and Tools … A-4

1. Purpose … A-4 2. Oversight System Model … A-4 Figure 2-1. Oversight System Model—Level I … A-4 Figure 2-2. Oversight System Model—Level II … A-5 3. Business Process Modules … A-6 Figure 2-3. Standard ATOS Business Process Flowchart Symbols … A-7 4. Application of System Safety Concepts … A-7 Figure 2-4. System Safety Process Model … A-8 Figure 2-5. Comparison of the ATOS Business Process and

Figure 2-1: picture of page 3Figure 2-1 · page 3
Picture of the page from the copy saved here

Chapter 2. Introduction to ATOS Business Process and Tools A › Figure 26. ATOS System/Subsystem/Element Chart—

the System Safety Process … A-9 5. Air Carrier Systems, Subsystems, and Elements … A-9 6. ATOS Tools … A-10 7. ATOS Process Feedback and Continuous Improvement … A-11 Figure 2-6. ATOS System/Subsystem/Element Chart—

Airworthiness Elements … A-12 Figure 2-7. ATOS System/Subsystem/Element Chart—

Figure 2-6: picture of page 3Figure 2-6 · page 3
Picture of the page from the copy saved here

Chapter 2. Introduction to ATOS Business Process and Tools A › Operations and Cabin Safety Elements A-13

Operations and Cabin Safety Elements … A-13

Chapter 3. The Certification Process for 14 CFR Part 121 Air Carriers … A-14

Figure 3-1. The Four Phases of the Certification Process and the Gate System

for Initial Certification … A-14 1. Introduction … A-15 2. Initial Inquiries or Requests … A-15 3. Certification Process Document … A-15 4. Certification Process … A-15 5. Phase 1—Application … A-16 6. Phase 2—Design Assessment … A-16 7. Phase 3—Performance Assessment … A-16 8. Phase 4—Administrative Functions … A-17 9. Project Management Tool … A-17

Figure 3-1: picture of page 3Figure 3-1 · page 3
Picture of the page from the copy saved here

Chapter 4. Roles and Responsibilities A-18 › 2. Specific Responsibilities for ATOS A-18

Chapter 4. Roles and Responsibilities … A-18

1. Responsibilities … A-18 2. Specific Responsibilities for ATOS … A-18

iii

77/27/07 N 8900.11

Chapter 5. Acronyms, Abbreviations, Terms, and Definitions … A-24

1. Acronyms and Abbreviations … A-24 Figure 5-1. Acronyms and Abbreviations … A-24 2. Terms and Definitions. The following terms and definitions apply to ATOS … A-26 Figure 5-2. Terms and Definitions … A-26

Figure 5-1: picture of page 4Figure 5-1 · page 4
Picture of the page from the copy saved here

Chapter 1. Design and Performance Assessment System Configur › Figure 13. Air Carrier Configuration Checklist B-10

Appendix B. Procedures for Design and Performance Assessment … B-1

Chapter 1. Design and Performance Assessment System Configuration (Module 1) … B-1

1. Introduction … B-1 2. Triggers for System Configuration … B-1 3. Request a New or Changed Scope of Operation … B-2 4. Review The Application for the Request … B-3 5. Accept the Application for the Request? … B-6 6. Return the Application to the Air Carrier or Applicant for Modification … B-7 7. Update the Application … B-7 8. Tailor the Elements and Questions to the Requested Scope of Operation … B-7 Figure 1-1. Acceptance of Formal Application … B-8 Figure 1-2. Rejection of Formal Application … B-9 Figure 1-3. Air Carrier Configuration Checklist … B-10

Figure 1-1: picture of page 4Figure 1-1 · page 4
Picture of the page from the copy saved here

Chapter 2. Design and Performance Assessment Planning (Modul › Figure 21. Risk Indicator Quick Reference Guide B-22

Chapter 2. Design and Performance Assessment Planning (Module 2) … B-12

1. Introduction … B-12 2. Planning Data … B-12 3. Assess Air Carrier/Applicant Risk and Update the ACAT … B-13 4. Do the Results of the ACAT Affect Either Design or Performance? … B-14 5. Adjust Assessment Plan Due Dates and Priorities … B-15 6. Are There Other Factors That Affect Due Dates? … B-17 7. Determine the Data Collection Requirement for Each Performance Assessment...B-18 8. Document Data Collection Requirements Using the Detailed Work Instruction....B-18 9. Other Data Collection Requirements … B-19 10. Retargeted Comprehensive Assessment Plan … B-20 Figure 2-1. Risk Indicator Quick Reference Guide … B-22

Chapter 3. Design and Performance Assessment Resource Manage › 13. Ongoing Resource Management B-59

Chapter 3. Design and Performance Assessment Resource Management (Module 3) … B-52

1. Introduction … B-52 2. Is the Appropriate Resource Available? … B-53 3. Baseline Training … B-55 4. Air Carrier-Specific Familiarization Briefing … B-55 5. Other Training … B-56 6. Sharing of Resources … B-57 7. Assign Individual and Allocate Funding … B-57 8. Assignments for Design or Performance Assessment … B-58 9. Considerations Specific to Assigning an SAI … B-58 10. Document Reasons Why Work Was Not Assigned … B-58 11. Notify PI or CPM That Work Remains Unassigned … B-59 12. Review Comprehensive Assessment Plan … B-59 13. Ongoing Resource Management … B-59

iv

77/27/07 N 8900.11

Chapter 3. Design and Performance Assessment Resource Manage › Figure 31. Air CarrierSpecific Familiarization Briefing Ou

14. Incomplete Inspection Records Resulting from an Inspector Leaving the CMT or CPT … B-59 Figure 3-1. Air Carrier-Specific Familiarization Briefing Outline of Subjects … B-60

Chapter 4. Data Collection and Data Reporting … B-65

Section 1. Design Assessment Data Collection (Module 4) … B-65

Chapter 4. Data Collection and Data Reporting B-65 › 6. Document Unrelated Safety Issues via a Dynamic Observatio

1. Introduction … B-65 2. Collect Required Data … B-65 3. Were Issues of Regulatory Noncompliance Identified? … B-70 4. Notify the PI/CPM of Regulatory Noncompliance … B-70 5. Were Unrelated Safety Issues Observed? … B-70 6. Document Unrelated Safety Issues via a Dynamic Observation Report … B-71

Section 2. Performance Assessment Data Collection (Module 4) › 7. Document Unrelated Safety Issues via a Dynamic Observatio

Section 2. Performance Assessment Data Collection (Module 4) … B-72

1. Introduction … B-72 2. Collect Required Data … B-72 3. Perform Data Collection Using Constructed Dynamic Observation Reports … B-77 4. Were Issues of Regulatory Noncompliance Identified? … B-77 5. Notify PI or CPM of Regulatory Noncompliance … B-77 6. Were Unrelated Safety Issues Observed? … B-77 7. Document Unrelated Safety Issues via a Dynamic Observation Report … B-77

Section 3. Design and Performance Assessment Data Reporting › Table 41. Data Quality Guidelines—Specific Data Requirement

Section 3. Design and Performance Assessment Data Reporting (Module 5) … B-79

1. Introduction … B-79 2. Enter SAI, EPI, ConDOR, or DOR in Accordance With Data Quality Guidelines B-79 3. Save SAI, EPI, DOR or ConDOR as Draft … B-84 4. Save SAI or EPI Activity, DOR, or ConDOR as Final … B-84 5. Is SAI or EPI Complete? … B-84 6. Save SAI or EPI to Master Record … B-84 Table 4-1. Data Quality Guidelines—Specific Data Requirements Table … B-86

Chapter 5. Design and Performance Assessment Data Review (Mo › Table 51. Data Quality Guidelines—Data Dimensions Table B-9

Chapter 5. Design and Performance Assessment Data Review (Module 6) … B-93

1. Introduction … B-93 2. Review SAI, EPI, ConDOR, or DOR Data … B-94 3. Does Data Content Meet Data Quality Guidelines? … B-95 4. Save Data to the ATOS Database … B-95 5. Return and Provide Feedback on Data … B-95 6. Is There Inspector Agreement? … B-95 7. Is it a Data Collection or a Data Reporting Issue? … B-95 8. Initiate and Follow Process to Resolve Differences … B-95 9. Saving Data to the Master Record … B-96 Table 5-1. Data Quality Guidelines—Data Dimensions Table … B-97

Chapter 6. Design Assessment Analysis and Action B-101 › Section 1. Design Analysis and Assessment (Module 7) B-101

Chapter 6. Design Assessment Analysis and Action … B-101

Section 1. Design Analysis and Assessment (Module 7) … B-101

1. Introduction … B-101 2. Analyze SAI Data by Element … B-101

v

77/27/07 N 8900.11

3. Assess Data in the ATOS Data Analysis Package Data by Element … B-102 4. Does the Element Meet the Requirement for Acceptance or Approval? … B-103 5. Document Accepted/Approved Design Assessment … B-103 6. Document Design Assessment Rejected … B-103 Table 6-1 Bottom-line Design Assessment Categories … B-103

Section 2. Design Assessment Action Determination and Implem › 4. Completion of Design Assessment B-106

Section 2. Design Assessment Action Determination and Implementation (Module 8)B-104

1. Introduction … B-104 2. System Design Accepted … B-104 3. System Design Rejected … B-106 4. Completion of Design Assessment … B-106

Chapter 7. Performance Assessment Analysis and Action … B-107

Chapter 7. Performance Assessment Analysis and Action B-107 › Section 1. Performance Analysis and Assessment (Module 7) B-

Section 1. Performance Analysis and Assessment (Module 7) … B-107

1. Introduction … B-107 2. Analyze EPI Data by Element … B-107 3. Assess ATOS Analysis Data by Element … B-108 4. Is Element Performance Affirmed? … B-109 5. Document Affirmed Performance Assessment … B-109 6. Document Performance Not Affirmed … B-109 Table 7-1. Bottom-line Performance Assessment Categories … B-109

Section 2. Performance Action Determination and Implementati › 4. Completion of Performance Assessment B-112

Section 2. Performance Action Determination and Implementation … B-110

1. Introduction … B-110 2. System Performance Affirmed … B-110 3. System Performance is Not Affirmed … B-112 4. Completion of Performance Assessment … B-112

Appendix C. Risk Management Process … C-1

1. Introduction … C-1 2. When to Use the Risk Management Process … C-1 3. Identify Hazards … C-2 4. Analyze and Assess Risk … C-2 Table C-1. Risk Matrix … C-4 5. Perform Decisionmaking … C-4 6. Implement the Decision … C-5 7. Validate the Effectiveness of the Decision … C-6

1. Introduction C-1 › 7. Validate the Effectiveness of the Decision C-6

vi

77/27/07 N 8900.11

Appendix D. Air Carrier Evaluation Process … D-1

1. Introduction … D-2 2. Determine the Need for Evaluation … D-2 3. Identify and Select Air Carriers for Evaluations: … D-3 4. Determine the Type of Evaluation … D-3 5. Decide on Evaluation Team Composition … D-4 6. Complete Evaluation Agreement … D-4 7. Notify Air Carrier of the Evaluation … D-5 8. Partnership With the Air Carrier … D-5 9. Voluntary Disclosure … D-5 10. Evaluations Not Conducted in Partnership With the Air Carrier … D-5 11. Revise the Comprehensive Assessment Plan … D-5 12. Assign Resources to Complete the Evaluation … D-5 13. Collecting Evaluation Data … D-6 14. Report Evaluation Data … D-6 15. Reviewing Evaluation Data (Team Leader) … D-6 16. Analyze and Assess Evaluation Data … D-6 17. Finalize Evaluation Report … D-7 18. Determine and Implement Followup Actions … D-7 19. Brief the Air Carrier and Other Stakeholders … D-8

1. Introduction D-2 › 19. Brief the Air Carrier and Other Stakeholders D-8

vii

77/27/07 N 8900.11 Appendix A

Appendix A. Concepts and Overview

Chapter 1. Air Transportation Oversight System Doctrine

1. Purpose. This chapter explains the underlying policy, concepts, and principles for the Air Transportation Oversight System (ATOS).

2. Statutory Authority. Title 49 of the United States Code (Title 49 U.S.C.) and Title 14 of the Code of Federal Regulations (14 CFR) provide the statutory and regulatory authority for ATOS, respectively. Title 49 U.S.C. is broad in scope and contains the codified provisions of the Federal Aviation Act of 1958, which prescribe the powers and authorities of the Federal Aviation Administration (FAA). Title 14 CFR is prescriptive in nature and contains the specific requirements to obtain an air carrier operating certificate and standards for conducting related operations. ATOS is not a separate safety standard and does not impose additional requirements on air carriers. ATOS imposes only requirements that are either explicit or implicit in the statute or the regulations. ATOS provides FAA inspectors with standardized protocols to evaluate air carrier programs required by regulations to be approved or accepted by the Administrator. The following requirements in 49 U.S.C. subtitle VII, Chapter 447, Safety Regulation, are particularly pertinent to ATOS.

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 1. Air Transportation Oversight System Doctrine

a. Section 44702. Issuance of Certificates. “When issuing a certificate under this part, the Administrator shall consider the duty of an air carrier to provide service with the highest possible degree of safety in the public interest….”

b. Section 44705. Air Carrier Operating Certificates. “The Administrator of the Federal Aviation Administration shall issue an air carrier operating certificate to a person desiring to operate as an air carrier when the Administrator finds, after investigation, that the person properly and adequately is equipped and able to operate safely under this part and regulations and standards prescribed under this part.”

3. Policy Statement of the FAA as it Pertains to Promoting Aviation Safety for Air Carriers1. ATOS is based on the explicit policy of the FAA, which states: “The FAA will pursue a regulatory policy, which recognizes the obligation of the air carrier to maintain the highest possible degree of safety.” ATOS implements FAA policy by providing safety controls (i.e., regulations and their application) of business organizations and individuals that fall under FAA regulations. Under ATOS, FAA’s primary responsibilities are: (1) to verify that an air carrier is capable of operating safely and complies with the regulations and standards prescribed by the Administrator before issuing an air carrier operating certificate and before approving or accepting air carrier programs; (2) to re-verify that an air carrier continues to meet regulatory requirements when environmental changes occur by conducting periodic reviews; and (3) to continually validate the performance of an air carrier’s approved and accepted programs for the purpose of continued operational safety.

1 The text quoted in this paragraph is from pertinent portions of FAA Order 1000.1A, Policy Statement of the Federal Aviation Administration, Chapter 2, “Promoting Aviation Safety,” April 12, 1985. For the complete text, refer to this document.

77/27/07 N 8900.11 Appendix A

4. ATOS Concepts and Principles. ATOS relies on the following concepts and principles:

a. Definition of Safety and Risk. Safety is the state in which the risk of harm to persons or property damage is reduced to, and maintained at or below, an acceptable level through a continuing process of hazard identification and risk management. In this context, an air carrier’s duty to provide service with the highest degree of safety in the public interest means that the air carrier must identify hazards in its operating environment and manage associated risks. Similarly, an air carrier’s ability to manage risk is an important part of FAA’s determination that the air carrier is equipped and able to operate safely under 49 U.S.C. and the regulations and standards prescribed by 49 U.S.C.

b. System Safety. Properly designed systems control hazards by eliminating or mitigating associated risks before they result in accidents or incidents. In an operational context, air carriers fulfill their duty to provide service with the highest degree of safety in the public interest by designing their operating systems to manage hazard-related risks in their operating environments. These concepts are fundamental to ATOS.

c. Safety Attributes. The key to safety lies in managing the quality of safety-critical processes. This is a primary responsibility of an air carrier in meeting its regulatory obligations. ATOS employs six safety attributes to evaluate the design of air carrier operating systems:

(1) Procedures—Documented methods to accomplish a process.

(2) Controls—Checks and restraints designed into a process to ensure a desired result.

(3) Process Measures—Used to validate a process and identify problems or potential problems in order to correct them.

(4) Interfaces—Interactions between processes that must be managed in order to ensure desired outcomes.

(5) Responsibility—A clearly identifiable, qualified, and knowledgeable person who is accountable for the quality of a process.

(6) Authority—A clearly identifiable, qualified, and knowledgeable person who has the authority to set up and change a process.

The attributes are not standards in and of themselves, but provide a structure for the tools used to collect data for principal inspectors so that they can make informed judgments about the design of an air carrier’s operating systems (1) before approving or accepting them when required to do so by the regulations, and (2) during recurring assessments for continued operational safety.

d. Focus on an Air Carrier’s Organization and Processes. In addition to issuing certificates, monitoring compliance, investigating noncompliance, and administering sanctions, for noncompliance, FAA oversight must also focus on an air carrier’s organization and process management. Outputs and outcomes are still monitored, but the emphasis is on maintaining a safe process or correcting deficiencies. Performance assessments must supply objective evidence of both the adequacy and inadequacy of processes.

77/27/07 N 8900.11 Appendix A

e. Open System Perspective. A successful open system adapts to the needs of the environment and its resources. Safe operation in the modern aviation environment requires constant adaptation. Air carriers are obligated to provide systems that defend against the hazards of their operating environment, including adapting to changes in the environment. Data Collection Tools should provide information on current environmental risks and on the air carrier’s efforts to control them.

f. Interdependence and Collaboration. The FAA is responsible for reaching an independent assessment of an air carrier’s qualification to hold an operating certificate and its continuing ability to comply with regulations and standards. The FAA may accomplish its independent assessments using data provided by an air carrier or a third party. Data sharing, collaboration, and open communication optimize the function of the oversight system and leverage resources to advance safety.

g. Freedom of Information Act. Requests for records made under the Freedom of Information Act (FOIA) are processed in accordance with FAA, Department of Transportation, and government-wide directives and guidance. FAA Order 1270.1, Freedom of Information Act Program, provides guidance that governs processing requests for FAA records under FOIA.

77/27/07 N 8900.11 Appendix A

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 2. Introduction to ATOS Business Process and Tools

Chapter 2. Introduction to ATOS Business Process and Tools

1. Purpose. The Air Transportation Oversight System (ATOS) improves the certification and surveillance processes for air carriers. It assesses the safety of air carrier operating systems using system safety principles, safety attributes, risk management, and structured system engineering practices.

2. Oversight System Model. ATOS exists in relation to the aviation system that an air carrier uses to produce its goods and services. The air carrier is the process owner of its aviation system, which is a production system in that it serves customers via products and services. The FAA is the process owner of the oversight system, which is a protection system. Protection systems are designed to protect customers from receiving inferior goods and services, and from potential harm of production activities. This includes potential harm from airplane accidents, occupational hazards, loss of equipment and other property, and damage to the environment. Safety and quality management systems are also protection systems. FAA and air carriers are the process owners of such complementary systems. The relationship between production and protection systems is a matter of exchanging information and exerting influence. Protection systems influence production systems by imposing controls. Figure 2-1 shows this relationship at a high level.

Figure 2-1. Oversight System Model—Level I

a. Major Functions of ATOS. Three major functions further define the oversight system: design assessment, performance assessment, and risk management. The following Level II diagram shows these functions in a high-level model.

77/27/07 N 8900.11 Appendix A

Figure 2-2. Oversight System Model—Level II

Air Carrier Design Assessment Air Carrier Performance Assessment

5. Data Reporting

4. Data Collection

3. Resource Management

2. Planning

1. System Configuration

2. Planning

3. Resource Management

4. Data Collection

5. Data Reporting

8. Action Determination &

Implementation

8. Action Determination &

Implementation

7. Analysis and Assessment

7. Analysis and Assessment Hazards Identified

During Design

Assessment

Hazards Identified

During Performance

Assessment

Hazard Identification

Risk Analysis

Risk Assessment

Decisionmaking

Implementation of

Decision

Validation

Other Sources

Risk Management

Design Evaluation

Plan

CAP/Proving Run Validation

Plan

Prioritization

Resource Management

Process Assessment

Conclusions

Adjust Audit Scheme as Needed (Retarget, Change Period)

Figure 2-2: picture of page 12Figure 2-2 · page 12
Picture of the page from the copy saved here

Adjust Design Evaluation Plan

as Needed

Data Flow

Hazards

6. Data Review 6. Data Review

b. Design Assessment. Design assessment is the ATOS function that ensures an air carrier’s operating systems comply with regulations and safety standards, including the requirement to provide service at the highest level of safety in the public interest. Design assessment is the most important function of ATOS because safety is the outcome of a properly designed system. Poor system design compromises safety risk management. ATOS certification processes ensure that an air carrier’s operating systems comply with the intent of the regulations. ATOS uses standardized, systematic certification processes to determine an air carrier’s qualification for an operating certificate. FAA uses similar processes to approve or accept a new or changed air carrier program. The tools used in the certification processes also re-verify that an air carrier is meeting regulatory requirements during periodic program reviews or when environmental changes occur.

c. Performance Assessment. Performance assessment is the ATOS function that ensures operational safety. FAA inspectors conduct performance assessments to confirm that an air carrier’s operating systems produce intended results, including mitigation or control of hazards

77/27/07 N 8900.11 Appendix A

and associated risks. ATOS uses time-based performance assessments to detect latent, systemic failures that may occur due to subtle environmental changes. Performance assessment schedules are also adjustable based on known risks or safety priorities. Surveillance provides information for performance assessments and risk management. In this context, surveillance is synonymous with auditing. ATOS audits use the same tools as certification processes.

d. Risk Management. Risk management identifies and controls hazards and manages FAA resources according to risk-based priorities. This function is accomplished through systematic risk assessments of an air carrier’s performance and environment. Hazards are defined in terms of their potential consequences. The likelihood and severity of a consequence determines risk. ATOS assesses the combined effects of likelihood and severity to determine priority when multiple risks are identified. Subsequent risk management action plans contain strategies to transfer, eliminate, accept, or mitigate the risk. This process validates the intended results of an action plan to ensure that a hazard is effectively eliminated or controlled. ATOS uses a modified version of Nicholas J. Bahr’s System Safety Process Model for hazard identification and risk management (see Figure 2-4). ATOS is concerned with the hazards and associated risks that are subject to regulatory controls such as enforcement actions, certificate amendments, and rulemaking. Hazards that are identified as the responsibility of an air carrier are tracked in the ATOS Risk Management Process until the air carrier satisfactorily resolves them.

Figure 2-4: picture of page 15Figure 2-4 · page 15
Picture of the page from the copy saved here

3. Business Process Modules. A Level III model of the oversight system further defines ATOS processes at a procedural level.

a. There are eight business process modules in the design and performance functions. The application of each process may be somewhat different depending on whether conducting a design assessment or performance assessment, but the overall purpose of each module is as follows:

(1) Module 1—System Configuration. The System Configuration process assesses an air carrier’s or applicant’s request for a new or changed scope of operation to develop an oversight profile that contains all applicable elements.

(2) Module 2—Planning. Planning develops a risk-based data collection plan for design and performance assessments.

(3) Module 3—Resource Management. Resource Management provides the resources, training, and funding to execute the data collection plan.

(4) Module 4—Data Collection. This process collects the data requested in the data collection plan.

(5) Module 5—Data Reporting. The Data Reporting process transfers the collected data into the ATOS database.

(6) Module 6—Data Review. The Data Review process evaluates data in the ATOS database for compliance with the requirements in the data quality guidelines.

77/27/07 N 8900.11 Appendix A

(7) Module 7—Analysis and Assessment. Analysis and Assessment makes a data-based decision about whether to approve or accept or reject the design or performance of an air carrier’s or applicant’s programs.

(8) Module 8—Action Determination and Implementation. Action Determination and Implementation decides on and executes the appropriate course of action based on the decisions made during analysis and assessment.

b. Flow Chart. The Level III model consists of cross-functional flowcharts for each of the business process modules. Cross-functional flowcharts show responsibility for process steps using horizontal bands. Standard flowchart symbols used to depict ATOS processes include:

Figure 2-3. Standard ATOS Business Process Flowchart Symbols

y

Terminator – Indicates the beginning or ending of a process and links to other related processes.

Process Step – Describes a procedure or activity.

Figure 2-3: picture of page 14Figure 2-3 · page 14
Picture of the page from the copy saved here

Data – Defines data that are required to support a process step.

Decision – Describes a decision point in the process and the subsequent process steps that depend on which option is selected.

Connector – Connects and shows sequence of process steps using arrowheads.

4. Application of System Safety Concepts. The overall purpose of a system safety-based approach like ATOS is to identify, eliminate, or control hazards, and mitigate the associated risk.

a. Below is the AFS System Safety Process Model, a modified version of the Nicholas J. Bahr system safety process model.

77/27/07 N 8900.11 Appendix A

Figure 2-4. System Safety Process Model

System/Process Review

Documentation

b. Comparing the ATOS model to the system safety process model demonstrates how ATOS is a system safety-based approach to air carrier oversight.

77/27/07 N 8900.11 Appendix A

Figure 2-5. Comparison of the ATOS Business Process and the System Safety Process

Figure 2-5: picture of page 16Figure 2-5 · page 16
Picture of the page from the copy saved here

System Safety Process Step ATOS Business Process Define Objectives and Describe System. Define the acceptable levels of safety. How does the system work and how do its components interact?

Module 1 System Configuration. Regulations and policy define the acceptable level of safety. System description begins with the Air Carrier Oversight Profile. Hazard Identification. Where are the hazards in the system? What can go wrong?

Modules 2–6. Identify areas where conditions in the system or operating environment may be creating hazards. Plan, report, and review data collection in those areas. Risk Analysis and Assessment. Determine the potential consequences that could result if hazards are not addressed or corrected.

Module 7 Analysis and Assessment. Analyze collected data to identify systemic hazards that should be addressed or corrected. Decisionmaking. What can be done to control the effects of the hazard and/or mitigate the associated levels of risk?

Module 8 Action Determination and Implementation. Take action to control the effects of the hazard and/or mitigate unacceptable levels of risk. Validation of Controls. Did the action work?

Module 8 Action Determination and Implementation. Determine if the action eliminated the hazard or lowered the level of risk to acceptable levels. If not, take additional action.

5. Air Carrier Systems, Subsystems, and Elements. ATOS uses a structured process to analyze how systems, subsystems, and elements interact. Seven air carrier systems form the basis for the ATOS system-based approach. Each of these systems has a defined set of subsystems and elements. Elements are interrelated activities or actions completed to support air carrier subsystems and systems.

a. The following are the seven air carrier systems:

(1) Aircraft Configuration Control. An air carrier maintains the physical condition of the aircraft and its components using this system.

(2) Manuals System. This system controls the information and instructions to define and govern the air carrier activities.

(3) Flight Operations. This system pertains to aircraft movement.

(4) Personnel Training and Qualifications. Air carriers use processes to make sure that its personnel are trained and qualified.

(5) Route Structures. An air carrier uses this system to maintain facilities on approved routes.

77/27/07 N 8900.11 Appendix A

(6) Airman and Crewmember Flight, Rest, and Duty Time. This system prescribes time limitations for air carrier employees.

(7) Technical Administration. Air carriers use this system to address other aspects of certification and operation, such as key management personnel.

b. Figures 2-6 and 2-7 at the end of this section identify each of the systems, subsystems, and elements (along with associated inspector specialties) used in planning and executing ATOS data collection.

6. ATOS Tools. ATOS standardizes the certification and surveillance processes. Its structured automation tools include:

a. Air Carrier Configuration Checklist. The Air Carrier Configuration Checklist helps Certification Project Teams (CPT) and Certificate Management Teams (CMT) to document the air carrier’s or applicant’s scope of operation including factors such as type of operations, aircraft, equipment and operations specifications. This information is used for automated filtering of the oversight profile.

b. Air Carrier Oversight Profile. This profile is a tailored list of elements, Data Collection Tool questions, and job task items that are based on the specific regulatory requirements (SRR) that apply to the air carrier or applicant.

c. The Air Carrier Assessment Tool (ACAT). This tool uses risk indicators to look for conditions that may be creating hazards in the air carrier’s systems. The results of the ACAT help to prioritize oversight activities.

d. The Comprehensive Assessment Plan (CAP). This tool helps plan design assessments and performance assessments.

e. Outsource Oversight Prioritization Tool (OPT). The Outsource Oversight Prioritization Tool (OPT) is used for planning surveillance of air carrier outsource providers. Principal avionics inspectors and principle maintenance inspectors must use this tool during oversight planning. It allows for prioritization of outsource maintenance providers to help determine specific data collection requirements. The OPT will assist the principal inspector, other assigned inspectors, supervisors, and managers in identifying areas of concern or criticality about outsource providers and target resources toward the highest risk outsource maintenance providers.

f. Data Collection Tools. These ATOS tools support the assessments:

(1) Safety Attribute Inspection (SAI). Inspectors use the Safety Attribute Inspection questions to collect data for design assessment. Air carrier applicants use SAI DCTs during initial certification to document the results of their self audit.

(2) Element Performance Inspection (EPI). Inspectors use the Element Performance Inspection questions to collect data for performance assessment.

77/27/07 N 8900.11 Appendix A

(3) Constructed Dynamic Observation Report (ConDOR). This tool is used for focused, special inspections.

(4) Dynamic Observation Report (DOR). This tool allows inspectors to record on-thespot safety observations outside the planned oversight process.

(5) Assessment Determination and Implementation Tool. The principal inspector or certification program manager uses this tool to document the bottom-line design or performance assessment and the appropriate course of action for implementation.

7. ATOS Process Feedback and Continuous Improvement. ATOS uses a feedback loop to aid in its effectiveness. Inspectors should submit their concerns or recommendations using the Problem Reporting and Feedback feature in ATOS automation.

77/27/07 N 8900.11 Appendix A

Figure 2-6. ATOS System/Subsystem/Element Chart—Airworthiness Elements

1.0 Aircraft Configuration Control 2.0 Manuals 1.1 Aircraft 2.1 Manual Management 1.1.1 Aircraft Airworthiness 2.1.1 Manual Currency 1.1.2 Appropriate Operational Equipment 2.1.2 Content Consistency Across Manuals 1.1.3 Special Flight Permits 2.1.3 Distribution (Manuals) 1.2 Records and Reporting Systems 2.1.4 Availability (Manuals) 1.2.1 Airworthiness Release/Log Book Entry 2.1.5 Supplemental Operations Manual Requirements 1.2.2 Major Repairs and Alterations Records 1.2.3 Maintenance Log /Recording Requirements 4.0 Personnel Training and Qualifications 1.2.4 Mechanical Interruption Summary Reports 4.1 Maintenance Personnel Qualifications 1.2.5 Service Difficulty Reports 4.1.1 Required Inspection Item Personnel 1.2.6 Aircraft Listing 4.1.2 Maintenance Certificate Requirements 1.3 Maintenance Organization 4.2 Training Program 1.3.1 Maintenance Program 4.2.1 Maintenance Training Program 1.3.2 Inspection Program 4.2.2 Required Inspection Item Training Requirements 1.3.3 Maintenance Facility/Main Maintenance Base 4.2.12 Hazardous Materials Training 1.3.4 Required Inspection Items 4.4 Mechanics and Repairmen Certification 1.3.5 Minimum Equipment List/Configuration Deviation List/Deferred Maintenance

4.4.1 Recency of Experience

1.3.6 Airworthiness Directive Management 4.4.2 Display of Certificate 1.3.7 Outsource Organization 4.4.3 Privileges Airframe and Powerplant 1.3.8 Control of Calibrated Tools and Test Equipment 4.4.4 Privileges and Limitations for Repairmen 1.3.9 Engineering/Major Repairs and Alterations 5.0 Route Structures 1.3.10 Parts/Material Control/Suspected Unapproved Parts 5.1 Approved Routes and Areas 1.3.11 Continuous Analysis and Surveillance 5.1.1 Line Stations (Service & Maintenance) 1.3.12 Special Federal Aviation Regulation (SFAR) 36 5.1.2 Weather Reporting/Supplemental Aviation Weather Reporting System 1.3.13 Designated Alteration Station 5.1.3 Non-Federal Navigational Aids 1.3.14 General Maintenance Manual or Equivalent 5.1.4 Altimeter Setting Sources 1.3.15 Reliability Program 5.1.8 Extended Operations 1.3.16 Fueling 5.1.9 Reduced Vertical Separation Minimum 1.3.17 Weight and Balance Program 6.0 Airman and Crew Flight, Rest, and Duty Time 1.3.18 Deicing Program 6.2 Maintenance Personnel 1.3.19 Lower Landing Minimums 6.2.1 Maintenance Duty Time Limitations 1.3.20 Engine Condition Monitoring 7.0 Technical Administration 1.3.21 Parts Pooling 7.1 Key Personnel 1.3.22 Parts Borrowing 7.1.1 Director of Maintenance 1.3.23 Short-Term Escalations 7.1.2 Chief Inspector 1.3.24 Coordinating Agencies for Suppliers Evaluation 7.1.3 Director of Safety 1.3.25 Cargo Handling Equipment, Systems and Appliances 7.1.6 Maintenance Control

77/27/07 N 8900.11 Appendix A

Figure 2-7. ATOS System/Subsystem/Element Chart—Operations and Cabin Safety

Elements

1.0 Aircraft Configuration Control 4.0 Personnel Training and Qualifications 1.1 Aircraft 4.2 Training Program 1.1.2 Appropriate Operational Equipment 4.2.3 Training of Flight Crewmembers 4.2.4 Training of Flight Attendants 2.0 Manuals 4.2.5 Training of Dispatchers 2.1 Manual Management 4.2.6 Training of Station Personnel 2.1.1 Manual Currency 4.2.7 Training of Check Airman and Instructors 2.1.2 Content Consistency Across Manuals 4.2.8 Simulators/Training Devices 2.1.3 Distribution (Manuals) 4.2.9 Outsource Crewmember Training 2.1.4 Availability (Manuals) 4.2.10 Aircrew Designated Examiner Program 2.1.5 Supplemental Operations Manual Requirements 4.2.11 Training of Flight Followers 4.2.12 Hazardous Materials Training 4.3 Crewmember and Dispatch Qualifications 3.0 Flight Operations 4.3.1 Pilot Operating Limitations/Recent Experience 3.1 Air Carrier Programs and Procedures 4.3.2 Appropriate Airman/Crewmember Checks and Qualifications 3.1.1 Passenger Handling 4.3.3 Advanced Qualification Program 3.1.2 Flight Attendant Duties/Cabin Procedures 5.0 Route Structures 3.1.3 Airman

Figure 2-7: picture of page 20Figure 2-7 · page 20
Picture of the page from the copy saved here

Duties/Flight Deck Procedures 5.1 Approved Routes and Areas 3.1.4 Operational Control 5.1.5 Station Facilities 3.1.5 Carry-on Baggage Program 5.1.6 Use of Approved Routes, Areas and Airports 3.1.6 Exit Seating Program 5.1.7 Special Navigation Areas of Operation 3.1.7 Deicing Program 5.1.8 Extended Range Operations with Two-Engine Airplanes 3.1.8 Carriage of Cargo 5.1.9 Reduced Vertical Separation Minimum Authorization 3.1.9 Aircraft Performance Operating Limits 6.0 Airman and Crewmember Flight, Rest and Duty Time 3.1.10 Lower Landing Minimums 6.1 Airman and Crewmember Limitations 3.1.11 Computer-based Recordkeeping 6.1.1 Scheduling/Reporting System 3.1.12 Hazardous Materials 6.1.2 Flight Crewmember Flight/Duty/Rest Time 3.1.13 Other Personnel with Operational Control 6.1.3 Flight Attendant Duty/Rest Time 6.1.4 Dispatcher Duty/Rest Time 7.0 Technical Administration 3.2 Operational Release 7.1 Key Personnel 3.2.1 Dispatch or Flight Release 7.1.3 Director of Safety 3.2.2 Flight/Load Manifest/Weight and Balance Control 7.1.4 Director of Operations 3.2.3 Minimum Equipment

List/Configuration Deviation List Procedures

7.1.5 Chief Pilot

7.2 Other Programs 7.2.1 Safety Program (Ground and Flight)

77/27/07 N 8900.11 Appendix A

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 3. The Certification Process for 14 CFR Part 121 Air

Chapter 3. The Certification Process for 14 CFR Part 121 Air Carriers

Figure 3-1. The Four Phases of the Certification Process and the Gate System for Initial

Certification

Phase 1. Application

Gate 1

Phase 2. Design Assessment

Gate 2

Phase 3. Performance Assessment

Gate 3

Phase 4. Administration Functions

1. Application for Department of Transportation (DOT) Economic Authority completed by the applicant 2. Required management resumes submitted by the applicant 3. Operations Specifications (OpSpecs) requirements identified 4. Letters of Intent for lease or purchase of aircraft and facilities 5. Schedule of Events submitted by the applicant 6. Acceptance of Formal Letter of Application 7. Letter of Compliance 8. Submission of manuals and all documents listed in the Preapplication Checklist submitted by the applicant

1. All manuals approved or accepted 2. Training Complete 3. Revised Schedule of Events submitted by applicant 4. Exemption and Deviation requests completed 5. Compliance Statement completed and accepted

1. Show cause order from DOT received by applicant 2. Facilities evaluated and found satisfactory 3. Aircraft Conformity Inspection complete 4. Draft OpSpecs issued 5. Evacuation demonstration completed (if required) 6. Ditching demonstration completed (if required) 7. All other discrepancies and open questions addressed

Phase 3. Performance Assessment

(Proving Tests)

No

Yes

Yes

Yes

No

No

Gate 3 Requirements

Gate 2 Requirements

Gate 1 Requirements

77/27/07 N 8900.11 Appendix A

1. Introduction. This section provides direction and guidance on the certification process of Title 14 of the Code of Federal Regulations part 121 air carriers.

a. During the certification process, the certificate-holding district office (CHDO) and Flight Standards Certification and Surveillance Division (AFS-900) Air Transportation Oversight System (ATOS) Certificate Management Office (CMO) Certification Section forms a Federal Aviation Administration (FAA) Certification Project Team (CPT).

b. The CPT follows the guidance provided in this notice and the work instructions contained in the Certification Process Document (CPD). This certification process is an integral part of the ATOS model.

2. Initial Inquiries or Requests. Initial inquiries about certification or requests for application may come in various formats from individuals or organizations. These inquiries may be in writing or in the form of meetings with CHDO personnel.

a. Upon initial contact, CHDO personnel should provide the applicant with a Preapplication Statement of Intent (PASI) and request the applicant return the completed form to the CHDO.

b. The CHDO personnel should also provide the applicant with the FAA Web address and advise them of information found on the certification page of that site. The following Web address will assist applicants during the certification process: http://www.faa.gov/safety/programs_initiatives/oversight/atos/air_carrier/

c. When the PASI is accepted, the CHDO manager initiates the Certification Services Oversight Process (CSOP) for Original Organizational Certification. If the certification project will proceed, the CHDO manager notifies AFS-900 ATOS CMO Certification Section via e-mail (‘avs-afs900-atos-leadership [email protected]) per CSOP instructions. A copy of the complete PASI should be attached to the e-mail.

d. CHDO personnel should become familiar with the information in this notice and the information in Phase I of the CPD.

3. Certification Process Document. The CPD is an electronic document that provides guidance in the form of work instructions during the certification process. The work instructions list the required actions. Each action identifies the individual or organization responsible for its performance. The CPD links to reference material including briefing guides, meeting agendas, training requirements, and other guidance material used during the process. Both the FAA and industry can access the CPD via the Web at http://www.faa.gov/safety/programs_initiatives/oversight/atos/air_carrier/data_collection/cpd/.

4. Certification Process. The certification process for part 121 air carriers consists of four phases and three gates (see Figure 3-1). A phase separates the certification process into related activities that support a specific function. A gate is a set of specific requirements that must be met prior to proceeding to the next step. Within each phase, this notice and the CPD provides statements with obligatory actions. This notice identifies the person responsible for each action. The following briefly describes the content of each phase.

77/27/07 N 8900.11 Appendix A

5. Phase 1—Application.

a. The applicant triggers the application process by submitting a formal application package to a CHDO.

b. During this phase the AFS-900 ATOS CMO Certification, Standardization and Evaluation Team briefs the CHDO on the certification process.

c. The CPT reviews the applicant’s Preapplication Checklist (PAC) submissions for completeness and accuracy.

d. A formal application meeting is conducted after all submissions required in the PAC are reviewed and found acceptable by the CPT.

e. During the formal application meeting, the applicant’s management personnel must demonstrate knowledge of their air carrier’s system design.

f. Phase 1 ends when the CPT accepts the formal application package and all Gate I requirements are met.

6. Phase 2—Design Assessment.

a. The CPT evaluates the design of the applicant’s operating systems to ensure compliance with regulations and safety standards, including the requirement to provide service at the highest level of safety in the public interest.

b. Safety Attribute Inspection Data Collection Tools (DCT) are used in this phase to collect the majority of data that are used to determine if the air carrier’s systems meet all regulatory requirements and the intent of those requirements.

c. Phase 2 ends when all manuals are accepted or approved and all Gate II requirements are met.

7. Phase 3—Performance Assessment.

a. The CPT conducts performance assessments to validate that the applicant’s systems produce the intended results, including the control of hazards and associated risks.

b. Element Performance Inspection DCTs are used to collect data to determine if the applicant follows written procedures, adheres to controls, and uses process measures for each element observed.

c. This phase requires the operation of an aircraft to aid in the assessment of the applicant’s system design. Proving tests begin only after all Gate III requirements are met.

d. Phase 3 ends after the successful completion of the proving tests.

77/27/07 N 8900.11 Appendix A

8. Phase 4—Administrative Functions. This phase provides for completion of all administrative functions (e.g., issuance of the air carrier certificate and operations specifications).

9. Project Management Tool. The Project Management Tool (PMT) is an automated, Web-based tool used to schedule certification tasks, coordinate work assignments, manage work flow, document completion of tasks, monitor the status of the project, and store information used during the certification project.

a. Upon completing the certification project, the documents specified in the CPD, which are contained within the PMT, are used as the certification project report.

b. Authorized CPT members can access the PMT through a link in the CPD.

77/27/07 N 8900.11 Appendix A

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 4. Roles and Responsibilities

Chapter 4. Roles and Responsibilities

1. Responsibilities. All users of the Air Transportation Oversight System (ATOS) must use and maintain the system in accordance with the policies and procedures defined in this notice.

2. Specific Responsibilities for ATOS.

a. The Director of Flight Standards Service, AFS-1.

(1) Provides the national policy and guidance for ATOS.

(2) Provides and maintains national policy and guidance for Certification Project Team (CPT) or Certificate Management Team (CMT) baseline training and staffing standards.

(3) Provides adequate regional resources to support ATOS processes.

b. Flight Standards Certification and Surveillance Division, AFS-900.

(1) Provides ATOS policy and procedures in accordance with ATOS, Flight Standards, and the Associate Administrator for Aviation Safety doctrine.

(2) Completes changes and updates for the system configuration process.

(3) Provides analysis and program support for the ATOS process.

(4) Develops air carrier certification and data collection policy and procedures.

(5) Collects feedback and completes changes and updates for all ATOS processes, and assesses ATOS process effectiveness.

(6) Continually improves ATOS using established processes for system engineering.

c. Air Transportation Division, AFS-200; Aircraft Maintenance Division, AFS-300; and Flight Technologies and Procedures Division, AFS-400.

(1) Participates as a stakeholder in the development and continuous improvement of ATOS.

(2) Ensures that inspector guidance material affecting air transportation oversight programs align with ATOS.

d. Flight Standards Training Division, AFS-500. Budgets for and provides the training that meets the needs of ATOS users.

e. Flight Standards Quality Assurance Staff, AFS-40.

(1) Reports directly to AFS-1.

77/27/07 N 8900.11 Appendix A

(2) Audits compliance with ATOS policy and procedures as well as evaluates the effectiveness of ATOS processes.

f. Regional Flight Standards Division Offices.

(1) Implements ATOS and ensures that allocated resources (e.g., funding and trained personnel) are used in accordance with AFS priorities.

(2) Resolves issues that have been elevated by the certificate-holding district office (CHDO) or certificate management office (CMO).

g. Office Manager Responsible for the CPT or the CMT.

(1) Ensures that staff are properly trained and oriented to their role in ATOS.

(2) Ensures that staff effectively execute their assigned ATOS responsibilities in accordance with established ATOS processes and procedures.

(3) Provides necessary leadership, support, and resources to ensure ATOS transition goals are met.

(4) Manages the certification projects and certificates for the office’s assigned air carrier(s).

(5) Determines and requests staffing, as well as requests baseline training to support ATOS processes. The CPT or CMT manager also notifies the certification project manager (CPM) or principal inspector (PI) and if applicable, data evaluation program manager (DEPM) of any changes in CPT or CMT staffing.

(6) Receives input from the PI and identifies other training needs for CPT or CMT inspectors. Provides the air carrier-specific familiarization portion of baseline training to all CMT members.

(7) Participates in the initial or annual planning meeting, monitors and track the progress of the CPT or CMT in completing the development of the Comprehensive Assessment Plan (CAP), and concurs with the completed plan.

(8) Ensures personnel under their supervision participate in this initial or annual planning process.

(9) Ensures that the CPT or CMT develops and manages a CAP with inspections targeted to the highest risk areas. Inspectors are assigned to those highest risk areas first.

(10) If the CPM or supervisors do not assign inspector resources to the highest risk areas first, or inspection frequencies are elevated without adequate justification, works with the CPM or supervisors until these conditions are met or concurs with the CAP.

77/27/07 N 8900.11 Appendix A

(11) Ensures that the CPM or PI uses the tools and guidance found in this order whenever they become aware, through formal notification or informal channels, of conditions or indicators of changes in the applicant or air carrier’s ability to balance resources and operational requirements.

Note: The CPM or PI assesses risks and if necessary, adjusts their assessment plans when applicants or air carriers make significant changes to their operations and maintenance programs (e.g., closing maintenance facilities, reducing personnel, outsourcing maintenance, and reducing gate turnaround times).

(12) Ensures that the primary work function and highest work priority of CPT or CMT members is accomplishing the activities that support design and performance assessments identified in the CAP.

(13) Obtains and provides resources to support the CAP, Risk Management Process (RMP) development and accomplishment, and System Analysis Team (SAT) participation. This includes funding travel.

h. Frontline Manager.

(1) Ensures that staff are properly trained and oriented to their role in ATOS.

(2) Ensures that staff execute their assigned ATOS responsibilities effectively in accordance with established ATOS processes and procedures.

(3) Provides necessary leadership, support and resources to ensure ATOS transition goals are met.

(4) Assigns work plans.

(5) Ensures the inspectors conduct their assigned work plans according to the CPM’s or PI’s specific inspection instructions.

(6) Resolves differences of opinion between reporting inspectors and data reviewers.

(7) Ensures that CMT or CPT maintains an accurate roster.

(8) Ensures that CMT or CPT maintains accurate tables (m/m/s).

i. Certification Project Managers or Principal Inspector. The CPM is responsible for the initial certification process, and the PI is responsible for the certificate management process.

(1) The following are functions of the CPM and PI.

(a) Reviews an applicant’s request for new or changed scope of operation and if accepted, tailors the ATOS elements and DCT questions to the requested scope of operation using the air carrier oversight profile.

77/27/07 N 8900.11 Appendix A

(b) Collects and organizes information to complete an applicant or air carrier assessment, solicits input from team members, and makes decisions about oversight requirements.

(c) Prioritizes ATOS design and performance assessments by following ATOS planning procedures.

(d) Monitors the effects of industry changes and uses the change management tools in this notice to determine when retargeting oversight activities is required based on analysis of data or significant changes in the operating environment, such as financial distress, changes in the scope and scale of air carrier operations (growth or downsizing), or labor unrest, that may affect the applicant’s or carrier’s ability to balance resources, size, and organizational structure with operational requirements. Other triggers such as accidents, incidents, or occurrences could affect an applicant or air carrier.

(e) Participates in periodic meetings with the applicant or air carrier to stay informed on financial health and growth plans, or other conditions that might cause an imbalance between resources and operations.

(f) Provides specific instructions for completing inspections using the ATOS planning procedures.

(g) Identifies and brings aviation safety concerns to the analyst’s attention. PIs communicate their analysis needs to the ORA.

(h) Determines if the applicant’s or air carrier’s program and processes meet the standards for acceptance or approval.

(i) Determines, by element, the appropriate action for the results of a design assessment or a performance assessment.

(2) The following are functions that either the CPM or PI performs.

(a) The CPM ensures that all certification job functions are completed. The CPM notifies the CHDO manager of any information that may significantly affect or delay the certification project. The CPM ensures that individuals involved with the certification project and the CHDO manager are fully informed of the current status of the certification.

(b) The PI has the overall responsibility for the RMP.

(c) The PI analyzes risk and ensures the certificate holder addresses hazards by using the RMP to document rationale, develop action items, and monitor progress.

(d) The PI ensures certificate holder regulatory compliance and system adequacy through recurring design assessments.

77/27/07 N 8900.11 Appendix A

j. Operations Research Analyst.

(1) Supports the CMT in effective performance of safety analyses by providing guidance, expert advice, and data collection and analysis support.

(2) Collects, analyzes, and organizes associated applicant or air carrier data to clarify safety issues; plans and retargets data collection tasks; identifies potential hazards and consequences, and supports the RMP.

(3) Works closely with the CPM or PI to ensure that all pertinent data are reviewed thoroughly.

(4) Provides information to guide the CPT or CMT in conducting safety analyses. The ORA helps clarify safety issues by researching data and looking for trends, patterns, and generalizations.

k. Data Evaluation Program Manager or Data Reviewer.

(1) Continually monitors the status of reports and records in the ATOS database and reviews them in accordance with the ATOS data quality guidelines.

(2) Promptly initiates actions necessary to resolve data quality issues or discrepancies.

l. Aviation Safety Inspectors Assigned to a CMT.

(1) Participates in the planning activities to develop the CAPs.

(2) Schedules, coordinates, and accomplishes the work assignments using ATOS tools. Inspectors may work individually or as part of a team on SAIs.

(3) Accurately and promptly enters data collection results into the ATOS database in accordance with ATOS data quality guidelines.

(4) Submits reports using the Dynamic Observation Report tool when reporting observations that are relevant to safety goals, but are unplanned or outside the CAP.

(5) Reevaluates returned inspection records and decides on the appropriate action (e.g., editing the record, conducting additional observations, or taking no action).

(6) Promptly identifies unsafe conditions or possible regulatory violations observed during data collection, notifies appropriate personnel, and makes appropriate entries into Federal Aviation Administration data systems (e.g., Program Tracking and Reporting Subsystem, ATOS database).

(7) Follows established procedures to assist PIs in determining that the applicant or air carrier complies with its written procedures and meets its established performance measures.

(8) Performs qualitative reviews of available data that falls within their subject matter expertise.

77/27/07 N 8900.11 Appendix A

(9) Supports PIs and performs tasks associated with the RMP, as assigned.

m. Aviation Safety Technicians and Aviation Safety Assistants. Aviation safety technicians and aviation safety assistants who enter Safety Attribute Inspection or Element Performance Inspection activities for CPT or CMT inspectors transcribe these observations completely and accurately into the ATOS database.

77/27/07 N 8900.11 Appendix A

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 5. Acronyms, Abbreviations, Terms, and Definitions

Chapter 5. Acronyms, Abbreviations, Terms, and Definitions

1. Acronyms and Abbreviations. The following acronyms/abbreviations and definitions apply to ATOS:

Figure 5-1. Acronyms and Abbreviations

Acronym/Abbreviation Definition AC Advisory Circular ACAT Air Carrier Assessment Tool ACEP Air Carrier Evaluation Process ADI Assessment Determination and Implementation AFS Flight Standards Service AFS-1 Director of Flight Standards Service AFS-40 Flight Standards Quality Assurance AFS-500 Flight Standards Training Division AFS-900 Flight Standards Certification and Surveillance Division AQP Advanced Qualification Program ASA Aviation Safety Assistant ASAP Aviation Safety Action Program ASIAS Aviation Safety Information Analysis and Sharing ASI Aviation Safety Inspector ASI-G Geographic Aviation Safety Inspector AST Aviation Safety Technician ATOS Air Transportation Oversight System AW Airworthiness CAD Continuous ATOS Development CAP Comprehensive Assessment Plan CAS Continuing Analysis and Surveillance CAR Civil Air Regulations CD Air Carrier Dynamics CFR Code of Federal Regulations CHDO Certificate-Holding District Office CMO Certificate Management Office CMT Certificate Management Team CPD Certification Process Document CPM Certification Project Manager CPT Certification Project Team ConDOR Constructed Dynamic Observation Report CSI Cabin Safety Inspector CSOP Certification Services Oversight Process DCT Data Collection Tool DEPM Data Evaluation Program Manager DQG Data Quality Guidelines DOD Department of Defense DOR Dynamic Observation Report

77/27/07 N 8900.11 Appendix A

Figure 5-1. Acronyms and Abbreviations (Continued)

Acronym/Abbreviation Definition EC Environmental Criticality EFIS Electronic Flight Information System EPI Element Performance Inspection ETOPS Extended Operations FAA Federal Aviation Administration FOIA Freedom of Information Act FSAS Flight Standards Automation System FSDO Flight Standards District Office GPS Global Positioning System HAZMAT Hazardous Materials ICAO International Civil Aviation Organization IEP Internal Evaluation Program MEL/CDL Minimum Equipment List/Configuration Deviation List MIS Mechanical Interruption Summary MNPS Minimum Navigation Performance Specification MSL Mean Sea Level NTSB National Transportation Safety Board OAG Official Airline Guide OpSpecs Operations Specifications OPT Outsource Oversight Prioritization Tool ORA Operations Research Analyst OS Operational Stability PAC Preapplication Checklist PASI Preapplication Statement of Intent PH Performance History PI Principal Inspector PMT Project Management Tool PTRS Program Tracking and Reporting Subsystem RMP Risk Management Process RVSM Reduced Vertical Separation Minimums SAI Safety Attribute Inspection SASO System Approach to Safety Oversight SAT System Analysis Team SDR Service Difficulty Reporting Subsystem SPAS Safety Performance Analysis System SRR Specific Regulatory Requirement TC Team Coordinator (SAI) U.S.C. United States Code VDRP Voluntary Disclosure Reporting Subsystem VIS Vital Information Subsystem

77/27/07 N 8900.11 Appendix A

2. Terms and Definitions. The following terms and definitions apply to ATOS.

Figure 5-2. Terms and Definitions

Term Definition Acceptable Risk The level of risk that is allowed to persist after controls are applied. Risk is acceptable when further efforts to reduce it would degrade the probability of success of the operation, or when a point of diminishing returns has been reached. Aging Aircraft An aircraft of any make or model that is 15 years old or older. All-Cargo Operations Any operation for compensation or hire that is other than a passengercarrying operation. If passengers are carried, they are only those specified in Title 14 of the Code of Federal Regulations § 121.583(a). Air Carrier Assessment Tool (ACAT)

Figure 5-2: picture of page 33Figure 5-2 · page 33
Picture of the page from the copy saved here

The ACAT documents a systematic review of the air carrier system elements using the risk indicators to identify conditions that may be creating hazards. Air Carrier Configuration Checklist A checklist provides PI or CPM with series of questions to answer that pertain to the air carrier’s or applicant’s type of operation, types of aircraft and equipment, facilities, personnel, and other operations specifications. Air Carrier Dynamics Aspects of the organization and environment that the air carrier directly controls and could enhance system stability and safety. Air Carrier Oversight Profile A tailored list of element and DCT questions that apply to a specific air carrier or applicant. Air Carrier Programs and Procedures

The subsystem (3.1) by which an air carrier ensures compliance with its programs and procedures for functioning within its operating environment. Air Carrier System A group of interrelated processes that are a composite of people, procedures, materials, tools, equipment, facilities, and software operating in a specific environment to perform a specific task or achieve a specific purpose, support, or mission requirement for an air carrier. For the purposes of new certification and continued oversight, seven air carrier systems have been defined, including: 1.0 Aircraft Configuration Control 2.0 Manuals 3.0 Flight Operations 4.0 Personnel Training and Qualifications 5.0 Route Structures 6.0 Airman and Crewmember Flight, Rest, and Duty Time 7.0 Technical Administration Aircraft The subsystem (1.1) by which an air carrier ensures that its aircraft meet airworthiness and operational safety requirements. Aircraft Configuration Control The system (1.0) by which an air carrier maintains the physical condition of the aircraft and associated components. Airman and Crewmember Flight, Rest, and Duty Time

The system (6.0) that prescribes time limitations for air carrier employees. Airman and Crewmember Limitations

The subsystem (6.1) by which an air carrier ensures that airmen or crewmembers meet the regulatory time limitations.

77/27/07 N 8900.11 Appendix A

Figure 5-2. Terms and Definitions (Continued)

Term Definition Applicant An individual, group, or organization seeking new operating authority; or in the case of an existing air carrier, a modification to their operating authority. Approved Routes/Areas The subsystem (5.1) by which an air carrier ensures that it maintains the facilities to support its approved routes and areas of operation. Aviation Safety Information Analysis and Sharing

A facility for the integration, analysis, and sharing of aviation safety data and information. Authority Attribute A clearly identifiable, qualified, and knowledgeable person with the authority to establish and modify a process. Certificate Management Team (CMT)

This team is responsible for the oversight functions of a specific air carrier. The CMT develops and executes a Comprehensive Assessment Plan tailored to a specific air carrier. Certification Process Document (CPD)

An electronic document with work instructions to be accomplished during the certification process. Certification Project Manager (CPM)

The CPM is the primary Federal Aviation Administration (FAA) spokesperson throughout the Air Transportation Oversight System (ATOS) initial certification process. The CPM is responsible for ensuring that all certification job functions are complete. Certification Project Team (CPT)

This team is responsible for the oversight functions of a specific applicant during initial certification. The CPT develops and executes a Comprehensive Assessment Plan (CAP tailored to an applicant’s proposed operation). Certification, Standardization, and Evaluation Team

A team of national technical experts responsible for providing assistance to certificate-holding district offices in the full range of certifications and evaluations conducted on air carrier applicants or air carriers operating under Title 14 of the Code of Federal Regulations (14 CFR) part 121. Comprehensive Assessment Plan (CAP)

The applicant or air carrier-specific assessment plan developed by the CPT or CMT during initial certification or at the annual planning meeting. The CAP documents the planned assessments for the applicant or air carrier at the system element level. Constructed Dynamic Observation Report (ConDOR)

The Constructed Dynamic Observation Report allows data collection activities to be requested or assigned with instructions to inspect and report on specific areas of immediate concern outside of the normal assessment schedule. Control Attribute Checks and restraints that are designed into a process to ensure a desired result. Crewmember and Dispatch Qualifications

The subsystem (4.3) by which an air carrier ensures crewmembers and dispatchers are qualified. Criticality The likelihood that a failure of an air carrier system, subsystem, or element could lead to an unsafe condition.

77/27/07 N 8900.11 Appendix A

Figure 5-2. Terms and Definitions (Continued)

Term Definition Data Collection Tool (DCT) DCTs such as Element Performance Inspections (EPI) and Safety Attribute Inspections (SAI) are automated tools used to record observations to provide data for design and performance assessments. Data Evaluation Program Manager or Data Reviewer

The CPT or CMT member responsible for reviewing inspection reports and records to ensure they meet data quality guidelines. Design Assessment The ATOS function that measures an applicant’s or air carrier’s operating systems at the element level for compliance with the full intent of regulations and safety standards, including the requirement to provide service at the highest level of safety in the public interest. Dynamic Observation Report (DOR) The Dynamic Observation Report allows inspectors to record certain observations outside the comprehensive assessment planning process. Data Quality Guideline These guidelines help determine the acceptable levels of data quality during the evaluation of inspection records. Element One or more interrelated actions completed to support an air carrier subsystem. Elements are the level that design and performance is assessed for all 14 CFR part 121 carriers participating in ATOS. Element Performance Inspection (EPI) Data Collection Tool

The ATOS tool designed to collect data to help the CPM or principal inspector determine if an air carrier adheres to its written procedures and controls for each system element, and that the established performance measures for each system element are met. Environmental Criticality Aspects of the air carrier’s surroundings that could lead to or trigger a failure in one of its systems, subsystems, or elements, and potentially create an unsafe condition. Flight Operations The system (3.0) that pertains to aircraft movement. Frontline Manager Frontline managers provide first-level supervision to subordinate employees and manage the activities of one operating unit, project, or program area. Frontline managers report to middle or senior managers. Hazard A condition, event, or circumstance that could lead or contribute to an unplanned or undesired event. High Criticality A high likelihood that a failure in this element could lead to an unsafe condition. Human Factors The relationship between people and their operating environment (e.g., people, procedures, materials, tools, equipment, facilities, and software, etc.). Identified Risk A level of risk that is identified through various analysis techniques.

77/27/07 N 8900.11 Appendix A

Figure 5-2. Terms and Definitions (Continued)

Term Definition Interfaces Attribute The air carrier identifies and manages the interactions between processes. Job Task Item Job task items (JTI) are bulleted items below many DCT questions to detail the tasks that may be performed to properly answer the question. The inspector is required to answer the higher-level EPI or SAI question, and should use the attached JTIs as guidance only. Key Personnel The subsystem (7.1) by which an air carrier ensures that qualified management and technical personnel with operational control are in place and conducting operations at the highest level of safety. Low Criticality A low likelihood that a failure in this element could lead to an unsafe condition. Maintenance Organization The subsystem (1.3) by which an air carrier ensures the continuous airworthiness and servicing of aircraft in accordance with its approved procedures. Maintenance Personnel The subsystem (6.2) by which an air carrier ensures that maintenance personnel meet duty time limitations. Maintenance Personnel Qualifications

The subsystem (4.1) by which an air carrier ensures maintenance personnel are properly certificated and authorized to perform assigned duties. Manual Management The subsystem (2.1) by which an air carrier prepares and maintains the manuals for the use of and guidance to its personnel. Manuals The system (2.0) for controlling the information and instruction that defines and governs air carrier activities. Mechanics and Repairman Certification

The subsystem (4.4) that an air carrier uses to ensure that airmen who approve aircraft for return to service are properly certificated. Medium Criticality A moderate likelihood that a failure in this element could lead to an unsafe condition. Operations Research Analyst (ORA) The operations research analyst is responsible for assisting the CMT in collecting and analyzing air carrier data. Operational Control The exercise of authority over initiating, conducting, or terminating a flight. Operational Release The subsystem (3.2) by which an air carrier ensures that all activities required for safe dispatch and continuation of a flight to its destination. Operational Risk An identified risk that has the potential to affect the operations of the air carrier. Operational Stability Aspects of the air carrier’s organization and environment that they do not directly control and when managed effectively, could enhance system stability and safety. Operations Specifications Legal and binding contract between an air carrier and FAA that documents specifically how the air carrier operation is conducted.

77/27/07 N 8900.11 Appendix A

Figure 5-2. Terms and Definitions (Continued)

Term Definition Outsourcing The practice of contracting out internal air carrier programs and processes, such as maintenance, training, and ground handling, to external, independent vendors and suppliers. Oversight for the quality of the outsourced items remains with the air carrier. Passenger-Carrying Operation Any aircraft operation carrying any person, unless they only persons on the aircraft are those identified in 14 CFR § 121.583(a). An aircraft used in a passenger-carrying operation may also carry cargo or mail in addition to passengers. Preapplication Statement of Intent (PASI)

The completed PASI is a document used in initial certification that denotes an intent by the applicant to initiate the certification process and allows the FAA to plan activities and prepare to commit resources. Performance Assessment The ATOS function that measures an applicant’s or air carrier’s operating systems at the element level to confirm that the air carrier is following its procedures and that they are producing the intended result. Performance History The results of the air carrier’s operations over time. Performance Measure A description of the desired outcome of an air carrier element process. It is used to determine whether the desired results of that process were achieved. Personnel Training and Qualifications

The system (4.0) by which air carrier personnel are trained and qualified. Principal Inspector (PI) The PI is the primary FAA spokesperson and decisionmaker for their specialty in all applications of ATOS. Procedures Attribute Documented methods for accomplishing a process. Process Policies and procedures designed to produce a desired result or end product for an air carrier. Process Measurement Attribute The air carrier measures and assesses its processes to identify and correct problems or potential problems. Records and Reporting Systems The subsystem (1.2) by which an air carrier manages the records used to show that the aircraft are airworthy; reflects the air carrier’s use of its procedures; and ensures the issuance of required reports. Responsibility Attribute A clearly identifiable, qualified, and knowledgeable person who is accountable for the quality of a process. Risk An expression of the severity of potential consequences and the likelihood of their occurrence that could result if a hazard is not addressed or corrected.

Risk Indicator A grouping of safety- and/or performance-related data that reflects an area of potential risk that is expected to have sufficient data or justification to calculate a representative value for a particular air carrier system, subsystem, or element. Risk Management An interactive management activity dedicated to assuring that risk is identified, documented, eliminated, or controlled within defined program risk parameters. Risk Management Process (RMP) This process is the ATOS function that identifies hazards and ensures that the air carrier either eliminates the hazards or controls the associated risk at acceptable levels. This process also allows the FAA to manage resources in accordance with risk-based priorities.

77/27/07 N 8900.11 Appendix A

Figure 5-2. Terms and Definitions (Continued)

Term Definition Route Structures The system (5.0) by which an air carrier maintains facilities on approved routes. Safety The state in which the risk of harm to persons or property damage is reduced to, and maintained at or below, an acceptable level through a continuing process of hazard identification and risk management. The quality of a system that allows the system to function under predetermined conditions with an acceptable level of risk. Safety Attributes The qualities of a system, (e.g., authority, responsibility, procedures, controls, process measurements, and interfaces) that should be present in well-designed air carrier systems and processes. Safety Attribute Inspection (SAI) Data Collection Tool

The ATOS tools used to collect data about regulatory compliance in order to assess the adequacy of the design of the processes associated with each system element for an air carrier. The tool is organized in accordance with six safety attributes. SAI Team The team of inspector(s) or a single inspector assigned to accomplish an SAI for a specific CPT or CMT. Scope of Operation Description of an applicant or air carrier’s activities in air commerce System A group of interrelated processes which are a composite of people, procedures, materials, tools, equipment, facilities, and software operating in a specific environment to perform a specific task or achieve a specific purpose, support, or mission requirement for an air carrier. System Analysis Team A team that includes participants from the CMT, the air carrier, other FAA organizations, and other non-FAA entities (e.g., the manufacturer) to accomplish further analysis and determine root causes of system deficiencies.

System Approach The structured, safety-driven means by which the FAA certifies and conducts oversight activities on elements that are designed to interact predictably within the air carrier’s systems and subsystems. System Safety The application of special technical and managerial skills to identify, analyze, assess, and control hazards and risks associated with a complete system. System safety is applied throughout a system’s entire lifecycle to achieve an acceptable level of risk within the constraints of operational effectiveness, time, and cost. System Stability The state of balanced constancy and safety that results when an air carrier is able to effectively manage both the aspects of their organization and their environment; those they control directly and those over which they have no direct control. Technical Administration The system (7.0) for addressing all other aspects of air carrier certification and operations.

Training Program The subsystem (4.2) by which an air carrier ensures that personnel are trained to perform assigned duties in accordance with the air carrier’s approved programs. Unacceptable Risk Risk that cannot be tolerated by the managing activity. It is a subset of identified risk that must be eliminated or controlled.

Appendix D. Air Carrier Evaluation Process D-1 › Appendix B. Procedures for Design and Performance Assessment

Appendix B. Procedures for Design and Performance Assessment

Chapter 1. Design and Performance Assessment System Configuration

(Module 1)

Getting Started

Module 1. System Configuration

Principal Inspector/Certification Project

Manager Air Carrier/Applicant

1.7. Update the Application

Appendix D. Air Carrier Evaluation Process D-1 › Getting Started

Design and Performance Assessment Module 1. System

Configuration

1.2. Request a New or Changed

Scope of Operation

1.1. Triggers for System Configuration

1. Initial Certification 2. FAA-initiated change 3. Air Carrier-initiated change

Design Assessment Module 8. Action Determination

and Implementation (System

Rejected)

Performance Assessment Module 8. Action Determination

and Implementation (Performance of System Not

Affirmed)

1.3. Review the Application for

Request

1.4. Accept the Application for the

Request?

1.6. Return to Air Carrier/Applicant

for Modification

1.5. Tailor the Elements and Questions to the Requested Scope

of Operation

Design Assessment/ Performance Assessment

Module 2. Planning

No

Yes

1. Introduction. The air carrier or applicant defines its scope of operations and develops core processes, procedures, and programs for Federal Aviation Administration (FAA) approval or acceptance. Understanding the scope of operations enables the FAA to develop an oversight profile for a particular applicant or air carrier. The oversight profile allows the principal inspector (PI) or certification project manager (CPM) to plan and conduct oversight activities that are specific to the air carrier’s or applicant’s system configuration.

2. Triggers for System Configuration. (See flowchart process step 1.1.) Three events that can trigger the system configuration process are initial certification, FAA-initiated change, and air carrier-initiated change.

a. Initial Certification. An air carrier submits a formal application package requesting authorization to operate under Title 14 of the Code of Federal Regulations (14 CFR) part 121.

7/2707 N 8900.11 Appendix B

b. FAA-Initiated Change.

(1) FAA issues or revises a regulation or policy that affects the air carrier system or its operating authority.

(2) As part of a design or performance assessment, the FAA may require the air carrier to revise one or more of their programs or systems, or modify one or more of their authorizations.

c. Air Carrier-Initiated Change.

(1) The air carrier proposes a change to its operations specifications (OpSpecs), such as:

(a) Cargo to Passenger, Supplemental to Domestic.

(b) Adding a new aircraft type.

(2) The air carrier proposes a change to its scope of operation that does not require a change to its OpSpecs, such as:

(a) Changes to training programs.

(b) Manual revisions.

3. Request a New or Changed Scope of Operation. (See flowchart process step 1.2.)

a. Initial Certification. An applicant for a part 121 air carrier certificate submits a formal application package to the FAA. In addition to the name of applicant, proposed kind of operation, base location, type of fleet, and proposed date of initial operation, the package must contain:

• Formal Application Letter

• Updated Preapplication Statement of Intent (PASI) FAA Form 8400-6

• Requests for Deviations or Exemptions

• Schedule of Events

• Company Manuals

• Training Curriculum

• Management Resumes

• Lease Agreements/Proof of ownership of aircraft and facilities

• Compliance Statement

7/2707 N 8900.11 Appendix B

• Self Audit Safety Attribute Inspections (SAI)

• Proposed Draft OpSpecs

• Outsourcing Contractual Agreements

• Initial Cadre Check Airman Training Request

• Status of Environmental Assessment, Security Program, Drug and Alcohol Program, Dangerous Goods Procedures Manual and Training Program and Economic Authority

• Corporation/Limited Liability Corporation documents

b. FAA-Initiated Change. The Administrator may amend OpSpecs requirements or require program revisions when safety and public interest require such action. Amendments or revisions can result from significant changes to the certificate holder’s operating environment or safety concerns. Changes to policy or rules may also require an adjustment of OpSpecs. Regardless of who initiates the need for change, the air carrier must submit documentation sufficient for the FAA to evaluate the impact of the change on the air carrier’s configuration.

c. Air Carrier-Initiated Change. The air carrier may make application to amend its OpSpecs or programs by submitting an electronic proposal within the OpSpecs subsystem or a letter to the appropriate FAA office.

4. Review The Application for the Request. (See flowchart process step 1.3.) The PI or CPM determines if the application package contains the required documentation in the form and manner acceptable to the administrator before assessing and making a decision on the air carrier’s or applicant’s request.

a. Initial Certification. The CPM must initially review the application and make a determination of its acceptability upon receipt of the formal application. The CPM reviews the package for content and quality. The CPM determines (1) whether the submitted material represents the air carrier’s scope of operations, and (2) whether the application package is of sufficient quality to allow for a productive formal application meeting and begin the certification process. The following paragraphs are guidance for the more complex documents included in the application package.

(1) Formal Application Letter. The formal application letter must contain the full and official name of the applicant. The owner must sign this letter when applying as an individual or sole proprietorship; all partners must sign when applying as a partnership; or an authorized officer(s) must sign when applying as an organization such as a company or a corporation.

(a) The letter should contain the physical address of the applicant’s intended primary operating location. The applicant’s mailing address must be included in the formal application letter if different than its letterhead. This letter should also include the full name and address of the applicant’s agent for service, as required by United States Code section 46103(c) (formerly section 1005(b) of the Federal Aviation Act).

7/2707 N 8900.11 Appendix B

(b) The letter also confirms the identity of key management personnel such as the general manager, director of operations, director of maintenance, chief pilot, chief inspector, and director of safety, as applicable.

(c) Note any anticipated request for deviation from the qualification requirements of management personnel. The request for the deviation and its justification can be made in a separate letter.

(2) Schedule of Events. The schedule of events is a list of each major item, activity, program, aircraft, and/or facility acquisition. It also sets milestones for accomplishing or submitting the listed items. The accepted schedule of events becomes the basis for agreement between the applicant and the certification team to accomplish the certification project. The applicant’s ability to plan and execute a realistic schedule of events is a major factor in determining the applicant’s fitness to hold a certificate. In reviewing the schedule of events, the certification team must carefully consider its feasibility with respect to the following criteria:

(a) Logic of Sequence. Many activities and events listed in the schedule must be performed sequentially. For example, aircraft systems training cannot begin until the FAA-approved flight manual is available or the company aircraft operating manual has been reviewed and accepted or approved. The aircraft conformity inspection must be completed before the emergency evacuation demonstration.

(b) Timeliness of Events. The schedule of events must be reasonable and provide sufficient time for the certification team to review the applicant’s various documents, manuals, and proposals.

(c) Completeness of Events. The number and kinds of submissions made by the applicant for evaluation and acceptance or approval varies according to the complexity of the proposed operation. Specific manuals and other documents that are required for a particular type of applicant are annotated in the schedule of events.

(3) Company Manual(s). This attachment to the formal application may be in the form of one or more manuals or volumes. These manuals must contain information about the applicant’s organization, general policies, duties, responsibilities of personnel, operational control policy, and procedures. The Certification Project Team (CPT) conducts an initial review of the manuals to determine if the overall content and scope of the manual material indicates that the applicant is proceeding appropriately and in compliance with the regulations. These completed manual submissions provide early indications of the quality of the applicant’s manual program. The applicant’s entire manual system must be completely developed and in compliance with the requirements of §§ 121.133 and 121.135 at the time of formal application. When the CPT reviews manuals, they are actually reviewing a system. CPTs must ensure that the system represented by the manual allows safe operation as intended by the regulations.

(4) Training Curriculum. The company training curriculum must be attached to the formal application. The company training curriculum must include at least the following curriculum segments for each applicable crewmember or dispatcher position: basic indoctrination training, emergency training, initial aircraft ground training, and initial aircraft

7/2707 N 8900.11 Appendix B

flight training. The CPT must ensure that the training curriculum attachments include each of the four curriculum segments for each applicable crewmember or dispatcher position. Each curriculum must be reviewed to determine that basic regulatory requirements are being met and that the applicant is proceeding appropriately with the development of its training programs. During design assessment, a detailed review and initial approval of the training curriculum is accomplished after the applicant has finalized all training arrangements, including instructor lesson plans. The applicant may not start training in a curriculum before that curriculum is initially accepted or approved.

(5) Management Resumes. The CPT must review management qualifications and determine that there is a resume for each required management position, and that the resumes contain the required experience to determine regulatory compliance. The depth of review should be only to determine that there are no obvious omissions or significant discrepancies. For example, a significant discrepancy might be that the regulations require an individual to hold an airline transport pilot certificate, but the resume shows that the individual holds only a commercial pilot certificate.

(6) Purchase, Contract, and Lease Documents. These documents should provide evidence that the applicant has acquired aircraft, facilities, and services to conduct the type of operation proposed; or evidence that the applicant is, in good faith, committed to arranging for aircraft, supporting facilities, and services (as necessary) for the proposed operation. The documents should be reviewed for obvious omissions or significant discrepancies.

(a) An example of an obvious omission might be the lack of documents indicating intent to acquire an aircraft or to arrange for a station facility.

(b) A significant discrepancy might be a document that reflects a contractual arrangement with another organization to perform a type of maintenance when it is known that the other organization is unqualified to perform such work.

(c) These documents will not necessarily receive further review during the certification process because the aircraft, facilities, and services referenced in the documents are the items inspected for acceptance or approval. It is not necessary or desirable for a separate document to exist for every item the applicant will have to acquire. There should be sufficient evidence to show that the applicant has made definitive arrangements to acquire the major items needed for certification.

(7) Compliance Statement. Preparing the compliance statement benefits the applicant by systematically ensuring that all applicable 14 CFR parts 119 and 121 regulatory aspects are appropriately addressed during the certification process.

(a) The compliance statement should be in the form of a complete listing of all parts 119 and 121 sections pertinent to the operation the applicant is proposing. This list should reference any applicable subpart and each relevant section of the subpart. Next to each subparagraph, the applicant must provide a specific reference to company documentation that describes how the company will maintain compliance with each of these rules. The applicant

7/2707 N 8900.11 Appendix B

may also provide a brief narrative description that describes how the applicant will comply with each regulation.

(b) This statement also serves as a master index to the applicant’s manual system to expedite the FAA’s review and approval of the operation and manual system. The compliance statement is an important source document during the certification process.

(c) After the certification process is complete, the compliance statement should be updated as changes are incorporated in the applicant’s system. Where the compliance information has been developed (e.g., the manual material submitted with the formal application), a manual reference or description of the method of compliance must be entered next to the applicable regulatory section.

(8) Self Audit. The applicant must conduct a self audit using the SAI Data Collection Tools (DCT) to assess and document the design of their systems. The complete DCTs, including references to system documentation, must be included as part of the formal application package. In the initial review the CPT reviews a sample of the applicant’s SAI DCTs using all company documentation to determine if the DCTs are complete and accurate.

b. Established Air Carrier. Upon receipt of a request for new or changed scope of operation, the PI reviews any documents submitted as part of the request for content and quality. The PI should account for the complexity of the amendment to evaluate the change. The PI must review the application to ensure that it includes an explanation and any supporting document or information to accurately assess the nature and scope of the proposal. This information allows the PI to determine the effect the request will have on the air carrier’s system and oversight profile.

5. Accept the Application for the Request? (See flowchart process step 1.4.) The CPM or PI follows the appropriate FAA guidance to determine whether to accept or reject an air carrier’s application for a new or changed scope of operations.

a. Initial Certification.

(1) Formal Application Meeting. If the CPM decides that submitted material represents the air carrier’s scope of operations and is of sufficient quality to proceed with the certification process, the CPM contacts the applicant and schedules a formal application meeting. The purpose of the meeting is to (1) resolve any questions from either party, (2) determine the applicant’s knowledge of their air carrier systems, and (3) establish the guidelines for future proceedings of the certification process. The CPM is responsible for conducting the formal application meeting. Except for unanticipated circumstances, all members of the certification team and all the applicant’s key management personnel must attend the meeting.

(2) Notification of Acceptance. If the application process is successful, the CPM notifies the applicant in writing of acceptance of the formal application package. This notification does not constitute acceptance or approval of the air carrier’s system design, manuals, or any other attachment. These attachments are reviewed further during the design assessment, which may require corrective action by the applicant. Acceptance or approval of

7/2707 N 8900.11 Appendix B

each attachment is indicated separately by letter at a later date during the certification process. (See Figure 1-1, Acceptance of Formal Application Letter.)

(3) The PI or CPM may accept the application or request for a new or changed scope of operation; or determine that the application is not acceptable because the applicant or air carrier’s request (1) is not adequately safe for air transportation or air commerce; (2) would not be in the best interest of the public; or (3) conflicts with FAA policy. In any case, the PI or CPM informs the applicant or air carrier in writing that the application is not acceptable in its present form, but will be considered upon the receipt of additional, specified supporting documents and/or information.

6. Return the Application to the Air Carrier or Applicant for Modification. (See flowchart process step 1.6.) If the application requesting a new or changed scope of operation is incomplete or of insufficient quality, the PI or CPM must reject the entire application package and return it to the air carrier or applicant with a letter stating the reasons for its rejection. (See Figure 1-2, Rejection of Formal Application Letter.)

Figure 1-2: picture of page 47Figure 1-2 · page 47
Picture of the page from the copy saved here

7. Update the Application. (See flowchart process step 1.7.) The air carrier or applicant reviews the PI’s or CPM’s comments, makes the appropriate modifications, updates the application package, and resubmits the updated application.

8. Tailor the Elements and Questions to the Requested Scope of Operation. (See flowchart process step 1.5.) If the PI or CPM accepts the application requesting a new or changed scope of operation, the PI or CPM tailors the ATOS elements and DCT questions to the requested scope of operation using the Air Carrier Configuration Checklist.

a. Air Carrier Configuration Checklist. The PI or CPM completes the Air Carrier Configuration Checklist by answering a series of questions about the air carrier or applicant that pertain to the actual or requested type or kind of operation; aircraft make, model, series; certification and manufacture dates; powerplant and equipment; seating capabilities and accommodations; OpSpecs, personnel, and maintenance.

b. Air Carrier Oversight Profile. Completing the configuration checklist creates an air carrier oversight profile which is a tailored list of elements and questions that are applicable to an air carrier’s or applicant’s scope of operation. The PI or CPM can manually modify the profile in the event the air carrier has a unique situation that results in differences from the standard profile, such as a deviation or exemption. The PI or CPM must provide an explanation for all manual adjustments to the air carrier oversight profile.

7/2707 N 8900.11 Appendix B

Figure 1-1. Acceptance of Formal Application

[FAA Letterhead] [Date] Mr. Rockwell J. Jones President and CEO, MidSouth Airlines 601 Sky Harbor Blvd. Little Rock, Arkansas 72202

Dear Mr. Jones:

Your formal application has been reviewed and is acceptable. Our acceptance of the application does not convey specific approval of the attachments. Specific approvals or acceptance of the attachments will be appropriately conveyed after a detailed evaluation by the Federal Aviation Administration certification team.

We look forward to working with your personnel in the continuation of the certification process.

Sincerely,

John T. Smith Certification Project Manager

7/2707 N 8900.11 Appendix B

Figure 1-2. Rejection of Formal Application

[FAA Letterhead] [Date] Mr. Rockwell J. Jones President and CEO, Mid South Airlines 601 Sky Harbor Blvd. Little Rock, Arkansas 72202

Dear Mr. Jones:

This office has reviewed your formal application for an air carrier certificate, dated … We are returning your application because of deficiencies in the following areas:

Resumes of Harvey Anderson, director of Operations and S.F. Whipley, director of Maintenance, were not included in your application.

The compliance statement is incomplete. For example, 14 CFR part 121.XXX (Subject) was not addressed. Methods of compliance with this regulatory section are described in your company’s general manual attachment and should be appropriately referenced in the compliance statement. As previously discussed, all applicable regulatory sections must be addresses in the compliance statement. The minimum equipment list (MEL) does not contain maintenance and operations procedures as required on the master MEL.

We are returning your letter of application with all attachments. You must submit a new formal application when you have corrected all discrepancies noted above and any other omissions that exist. Please contact us if we can be of any further assistance in clarifying the minimum requirements for your formal application.

Sincerely,

John T. Smith Certification Project Manager

7/2707 N 8900.11 Appendix B

Figure 1-3. Air Carrier Configuration Checklist

If the response to any of the following questions is Yes, then…

…These elements

apply

Figure 1-3: picture of page 48Figure 1-3 · page 48
Picture of the page from the copy saved here

1. Does the certificate holder have Special Federal Aviation Regulations (SFAR 36) authorization?

1.3.12

2. Does the certificate holder have a designated alteration station (DAS) authorization?

1.3.13

3. Does the certificate holder use an approved reliability program? 1.3.15 4. Does the certificate holder have an engine condition monitoring program? 1.3.20 5. Does the certificate holder participate in a parts pool agreement? 1.3.21 6. Does the certificate holder use short-term escalation authorization for borrowed parts that are subject to overhaul requirements?

1.3.22

7. Does the certificate holder use short-term escalation? 1.3.23 8. Does the certificate holder use coordinating agencies for suppliers’ evaluation (CASE)?

1.3.24

9. Does the certificate holder conduct supplemental operations? 2.1.5 3.1.13 4.2.11 10. Is the certificate holder authorized to conduct Category II instrument approach and landing operations? (and/or) 11. Is the certificate holder authorized to conduct Category III operations? (and/or) 12. Is the certificate holder authorized to conduct automatic approach and landing operations (other than Categories II and III) at suitably equipped airports?

3.1.10

13. Does the certificate holder use an approved electronic recordkeeping system and/or an electronic flight bag?

3.1.11

14. Does the certificate holder operate aircraft with exit seats as defined in section 121.585?

3.1.6

15. Does the certificate holder carry cargo? 3.1.8 16. Does the certificate holder employ aircrew designated examiners (ADEs)? 4.2.10 17. Does the certificate holder use an Advanced Qualification Program (AQP)? 4.3.3 18. Does the certificate holder use flight attendants? 4.2.4 6.1.3 19 Does the certificate holder use dispatchers? 4.2.5 6.1.4 20. Does the certificate holder use certificated repairmen? 4.4.4 21, Does the certificate holder conduct flight training in airplane simulators or airplane flight training devices?

4.2.8

22. Does the certificate holder outsource crewmember training? 4.2.9 23. Does the certificate holder conduct Class II navigation using multiple long-range navigation systems? (and/or) 24. Does the certificate holder conduct operations in Central East Pacific (CEP) airspace? (and/or) 25. Does the certificate holder conduct operations in North Pacific (NOPAC) airspace? (and/or) 26. Does the certificate holder conduct operations in North Atlantic minimum navigation performance specifications (NAT/MNPS) airspace? (and/or) 27. Does the certificate holder conduct operations in areas of magnetic unreliability?

5.1.7

7/2707 N 8900.11 Appendix B

(and/or) 28. Does the certificate holder conduct north polar operations? 29. Does the certificate holder conduct extended range operations with two-engine airplanes

5.1.8

30. Does the certificate holder conduct operations in reduced vertical separation minimum (RVSM) airspace?

5.1.9

31. Does the certificate holder have maintenance performed within the United States?

6.2.1

Appendix D. Air Carrier Evaluation Process D-1 › Chapter 2. Design and Performance Assessment Planning (Modul

Chapter 2. Design and Performance Assessment Planning (Module 2)

Developing a Comprehensive Assessment Plan

Principal Inspector/Certification Project Manager

Module 2. Planning

2.1 Planning

Data

Design Assessment Module 8. Action Determination and Implementation

Performance Assessment

Appendix D. Air Carrier Evaluation Process D-1 › Developing a Comprehensive Assessment Plan

Module 8. Action Determination and

Implementation

2.2 Assess Air Carrier/Applicant Risk and Update

the ACAT.

Design Assessment/Performance

Assessment Module 1. System

Configuration

2.3. Do the ACAT Results Affect Design

or Performance?

2.4. Adjust Assessment Plan

Due Dates and

Priorities.

2.5. Are There Other Factors That

Affect Due Dates?

2.6. Determine Data Collection Requirements for Each Performance

Assessment.

2.7. Document Data Collection

Requirements Using the Detailed Work Instructions. Design Assessment/ Performance Assessment

Module 3. Resource

Management

Yes No

No

Yes

1. Introduction. The planning process develops a risk-based data collection plan to support design and performance assessments.

Continue reading ↓ 120 of 438 passages shown