Radar Vectors
FAA Notice Cancelled Issued Feb 16, 2012 AJR-1 1 pages Copy saved Nov 22, 2026

Notice N JO 7210.806 Delay Reporting

This document is no longer current. Cancelled by JO 7210.3X. Check the official source before relying on it.

Official source ↗ Open PDF

Distribution: ZAT-721; ZAT-464 Initiated By: AJR-1 System Operations, ATCSCC

NOTICE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION N JO 7210.806

Air Traffic Organization Policy

Effective Date: March 19, 2012

Cancellation Date:

July 26, 2012

SUBJ: Delay Reporting

FEDERAL AVIATION ADMINISTRATION N JO 7210.806

1. Purpose of This Notice. This notice adds a new requirement to Federal Aviation Administration (FAA) Order JO 7210.3, paragraph 17-5-12, for facilities to log verbal notifications to the Air Traffic Control System Command Center (ATCSCC), in National Traffic Management Log (NTML) or the daily log, when delays reach or are anticipated to reach 90 minutes, except for estimated departure clearance time (EDCT) delays as a result of a ground delay program (GDP).

2. Audience. This notice applies to the following Air Traffic Organization (ATO) service units: Terminal, En Route and Oceanic, and System Operations; FAA tower facilities; and Federal contract towers.

3. Where Can I Find This Notice? This notice is available on the MyFAA employee Web site at https://employees.faa.gov/tools_resources/orders_notices/ and on the air traffic publications Web site at http://www.faa.gov/air_traffic/publications/.

4. Procedures. Amend paragraph 17-5-12 to read as follows:

17-5-12. DELAY REPORTING

17-5-12. DELAY REPORTING

Subparagraphs a through c, no change.

d. Facilities must verbally notify the ATCSCC, through the appropriate protocol, when delays reach or are anticipated to reach 90 minutes, except for EDCT delays as a result of a GDP. Facilities must document in their NTML, or the daily log if the facility does not have NTML, that the verbal notification was completed. The ATCSCC must document in their NTML that the 90-minute verbal notification was received. The facility manager must be notified when delays reach 90 minutes, except for delays as a result of a GDP.

5. Distribution. This notice is distributed to the following ATO service units: Terminal, En Route and Oceanic, System Operations, and Mission Support; Office of ATO Safety and Technical Training; the Air Traffic Safety Oversight Service; the William J. Hughes Technical Center; and the Mike Monroney Aeronautical Center. Elizabeth L. Ray Vice President, Mission Support Services Air Traffic Organization Date Signed