Notice N JO 6470.44 Interim Guidelines for Order 6470.5A, Load Testing of UPMS Using the Load Bank
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Interim Guidelines for Order 6470.5A, Load Testing of UPMS Using the Load Bank