Notice N 6191.3 Standard Terminal Automation Replacement System (STARS) Security
Text re-read from the scan: 9 of 10 passages.
- Date
- Nov 22, 2026
- Recorded
- Nov 22, 2026
- Passages
- 9 of 10 changed (was 11)
- Paragraphs
- 65 added or rewritten, 102 removed or rewritten
Read the current text Official source ↗
What changed in the text
Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.
- Removed
[removed: US, DEPARTMENT OF] - Added
[added: U.S. DEPARTMENT OF TRANSPORTATION NOTICE FEDERAL AVIATION ADMINISTRATION N6191.3]
- Removed
[removed: FEDERAL AVIATION] - Added
[added: 09/10/02]
- Removed
[removed: TRANSPORTATION 9DMINISTRATION N6l9l.3] - Added
[added: SUBJ: STANDARD TERMINAL AUTOMATION REPLACEMENT SYSTEM (STARS) SECURITY]
- Removed
[removed: s w : STANDARD TERMINAL AUTOMATION REPLACEMENT SYSTEM (STARS)] - Added
[added: 1. PURPOSE. This Notice is an interim security document which describes Federal Aviation Administration (FAA) procedures and processes while providing direction to STARS Operational Sites (SOS) within the National Airspace System (NAS). Procedures and processes described within this Notice will be included in current and future orders and handbooks related to the development of STARS Security.]
- Removed
[removed: SECURITY] - Added
[added: 2. DISTRIBUTION. This Notice is distributed to offices within Washington Headquarters, Regional Airway Facilities Divisions, William J. Hughes Technical Center, Mike Monroney Aeronautical Center, various offices within the Department of Defense (DoD), and Airway Facilities selected field offices and services having Full STARS-2 (FS-2). An electronic bulletin shall be sent out notifying Offices of Primary Interest (OPI) whenever a major revision occurs.]
- Removed
[removed: 1. PURPOSE. This Notice is an interim security document which describes Federal Aviation Administration (FAA) procedures and processes while providing direction to STARS Operational Sites (SOS) within the National Airspace System (NAS). Procedures and processes described within this Notice will be included in current and future orders and handbooks related to the development of] - Added
[added: 3. CANCELLATION. This notice expires on or before twelve months from the date of signature and revisions are not applicable.]
- Removed
[removed: STARS Security.] - Removed
[removed: 2. DISTRIBUTION. This Notice is distributed to offices w i h Washington Headquarters, Regional Airway Facilities Divisions, William J. Hughes Technical Center, Mike Monroney Aeronautical Center, various offices within the Department of Defense (DoD), and Airway Facilities selected field offices and services having Full STARS-2 (FS-2). An electronic bulletin shall be sent out notifying Offices of Primary Interest (OPI) whenever a major revision occurs.] - Removed
[removed: 3. CANCELLATION. Tlvs notice expires on or before twelve months from the date of signature and revisions are not applicable.] 4. BACKGROUND.
- Changed
[removed: a,][added: a.] The STARS program office anticipates the deployment of STARS FS-2 to several locations in Calendar Years (CY) 2002 and 2003. In order for the Airway Transportation Systems Specialists (ATSS)[removed: FV-2 101 -H,][added: FV-2101-H,] Systems Specialist (SS)[removed: FV-2 101 -I][added: FV-2101-I] or DoD equivalent personnel to properly carry out their duties, Airway Facilities Security directives need to be in place at each location. b. Incorporation of the STARS Security Processes and Procedures (SSPP) into a STARS Security Handbook and the inclusion of General Security policy into an order is an ongoing process with the targeted completion date scheduled for mid to late CY-2003. General security policies directive in nature specific to the STARS Security Handbook will be identified. This Handbook will be inclusive of the SSPPs and maintenance practices required for security.
c. This Notice has the effect of assigning interim direct authority to the body of Security Processes and Procedures (SSPP), and security maintenance intervals (STARS Security Checks) until the General Security Policy, orders and the STARS Security Handbook are completed and approved.
5. ROLES AND RESPONSIBILITY. The Office of Primary Responsibility (OPR) for this Notice is the Integrated Air Traffic Systems (ATS) Security Program Office, AOP-500. The OPR shall maintain this notice and have the authority for cancellation. The signature level for this document resides with the
- Removed
[removed: Distribution: A-W(AF)-2; A-X(AF-3);] - Added
[added: Distribution: A-W(AF)-2; A-X(AF-3); Initiated By: AOP-500 A-Y(AY)-2; A-Z(ACT-200/300/400/500/600)-3; A-FAF-0(STD)]
- Removed
[removed: A-Y(AY)-2; A-Z(ACT-200/300/400/500/600)-3; A-FAF-O(STD)] - Added
[added: N6191.3 09/10/02]
- Removed
[removed: Initiated By: AOP-500] - Removed
[removed: N6191.3] NAS Operations Program Directorate level.
6. ROLES AND RESPONSIBILITIES FOR INTERIM SOLUTION.
a. AOP-500-NAS Security Division shall:
- Changed
[removed: (1) Ensure][added: (1)Ensure] General Security Policy is incorporated into existing orders or develop a separate NAS General Security Policy. (2) Validate that equipment specific security policy, procedures and key performance parameters are in accordance with the general security policy.
(3) Validate that all necessary Maintenance Security Checks have been identified.
- Changed
[removed: . ](4) Collaborate with all appropriate stakeholders for the content of this Notice. (5) Distribute this notice to organizations/agencies listed in paragraph 2.
(6) Verify that formal STARS training meets security requirements.
- 5 unchanged paragraphs
Collaborate with all appropriate stakeholders for the content of this Notice.
d. The Airway Transportation Systems Specialist FV 2101-H, Systems Specialist FV-2101- I, and DoD equivalent personnel shall:
- Changed
(1) Perform the identified STARS Security Checks in accordance with Appendix 1 and Appendix 2 of
[removed: thls][added: this] notice.[added: (2) Use Technical Instruction Manual TI 6191.406, STARS System Administration and Security for the SOS.] - Removed
[removed: (2) Use Technical Instruction Manual TI 61 91.406, STARS System Administration and Security for the SOS.] (3) Use the STARS SSPP for General Security Practices and Procedures.
- Removed
[removed: Page 2] - Added
[added: 09/10/02 N6191.3]
7. RESPONSIBILITIES FOR FINALIZED SECURITY REQUIREMENTS, POLICY AND PROCEDURES (NAS General Security requirements are included within current and future directives and the STARS Security Handbook).
- Changed
a. AOP-500
[removed: -][added: –] NAS Security Division shall: (1) Ensure all security-related requirements, policy, and key performance indicators are identified and standardized for the NAS.
(2) Validate that all necessary Maintenance Security Checks have been identified.
(3) Incorporate the General Security Policy into an existing order or create a NAS General Security Order.
(4) Collaborate with all appropriate stakeholders in formulating the content and format for the General Security Policy.
- Changed
(5) Work with STARS Product Support,
[removed: ATB-23 1 A,][added: ATB-231A,] to[removed: identi@][added: identify] security policies and procedures which impact the maintenance of STARS. (6) Collaborate with all stakeholders for the content and format of the STARS Security Handbook.
(7) Ensure that either the amended order or new General Security Order follows the Clearance Record Procedure.
- 7 unchanged paragraphs
(1) Follow the Security Policy and Procedures identified in the STARS Security Handbook.
(2) Perform the STARS Security Checks as identified in the STARS Security Handbook.
- Removed
[removed: Page 3] - Added
[added: 09/10/02 N6191.3 (3) Use Technical Instruction Manual TI 6191.406, STARS System Administration and Security for the SOS.]
- Removed
[removed: (3) Use Technical Instruction Manual TI 61 91.406, STARS System Administration and Security for the SOS.] - Added
[added: DeberadAoh Debofah A. Johnson]
- Changed
[removed: Director,-NAS][added: Director,NAS] Operations Program - Removed
[removed: Page 4] - Added
[added: 09/10/02]
- Changed
APPENDIX 1-STARS SECURITY CHECKS FOR ATSS OR SS
[removed: 09/10/02] - Removed
[removed: Performance Checks to be Accomplishsd by Either the ATSS or] - Added
[added: N6191.3]
- Removed
[removed: SS Standards and Tolerances] - Added
[added: Performance Checks to be Accomplished by Either the ATSS or SS]
- Removed
[removed: 1 Check rhost files] - Added
[added: Standards and Tolerances]
- Added
[added: Daily]
- Added
[added: Check rhost files]
Check for disconneced FSL, ESL, and Support processors
- Changed
[removed: 3 ]Check key files Weekly
- Changed
[removed: 4 ]Inspect connections - Changed
[removed: 5 ]Review BSM audit logs - Changed
[removed: 6 ]Check for core memory dump files 7 Review Unix audit logs
- Changed
[removed: Successful][added: Successfui] no fault[added: execution] - Removed
[removed: execution] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: execution] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: exewtion] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: exewtion] - Removed
[removed: Successful no fault] - Removed
[removed: exewtion] - Removed
[removed: Successful no fault] - Removed
[removed: execution] - Removed
[removed: Successful no fault] - Removed
[removed: execution] Maintenance Procedure
- Changed
TI
[removed: 61 91.406][added: 6191.406] Appendix A[added: Table A1] - Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI 6191.406 Appendix A[added: Table A1]
- Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI
[removed: 61 91 A06][added: 6191.406] Appendix A[added: Table A1] - Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI
[removed: 61 91.406][added: 6191.406] Appendix A[added: Table A1] - Removed
[removed: Table A1] - Removed
[removed: TI 6191.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: TI 61 91.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: TI 6191.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: Page 1] 09/10/02
APPENDIX 2-STARS SECURITY CHECKS FOR SS
- Removed
[removed: Performance Checks to be] - Added
[added: N6191.3]
- Removed
[removed: .. Accomelbhed ?x@e SS a] - Added
[added: Performance Checks to be Accomplished by the SS Biweekly]
Check for obsolete system status message disk files on FS MCW processor
Monthly
Verify System Account passwords
Verify software baseline integrity
Check for inactive user accounts
- Changed
[removed: identify][added: Identify] all inactive and active accounts - Changed
Update a list of inactive users and disable user
[removed: ID'S][added: ID's] Quarterly
Change system account passwords
Change passwords for root users
General Security Practices and Procedures
- Changed
Standards and[added: Tolerances]
- Removed
[removed: Tolerances . '] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: execution] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: execution] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: execution] - Added
[added: Successful no fault execution]
- Changed
Successful no fault[added: execution]
- Removed
[removed: execution] - Removed
[removed: Successful no fault] - Removed
[removed: execution] - Removed
[removed: Successful no fault] - Removed
[removed: execution] - Removed
[removed: Successful no fault] - Removed
[removed: execution] - Removed
[removed: Successful no fault] - Removed
[removed: execution] Not Applicable
Maintenance Procedure
- Changed
TI 6191.406 Appendix A[added: Table A1]
- Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI
[removed: 61 91.406][added: 6191.406] Appendix A[added: Table A1] - Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI
[removed: 61 91.406][added: 6191.406] Appendix A[added: Table A1] - Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Changed
TI 6191.406 Appendix A[added: Table A1]
- Removed
[removed: Table A1] - Added
[added: TI 6191.406 Appendix A Table A1]
- Removed
[removed: TI 61 91.406 Appendix A] - Added
[added: STARS Security Processes and Procedures (SSPP)]
- Removed
[removed: Table A?] - Removed
[removed: TI 61 91.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: TI 6191.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: TI 61 91.406 Appendix A] - Removed
[removed: Table A1] - Removed
[removed: STARS Security Processes] - Removed
[removed: and Procedures (SSPP)]
Whole text before this change
US, DEPARTMENT OF
FEDERAL AVIATION
TRANSPORTATION 9DMINISTRATION N6l9l.3
s w : STANDARD TERMINAL AUTOMATION REPLACEMENT SYSTEM (STARS)
SECURITY
1. PURPOSE. This Notice is an interim security document which describes Federal Aviation Administration (FAA) procedures and processes while providing direction to STARS Operational Sites (SOS) within the National Airspace System (NAS). Procedures and processes described within this Notice will be included in current and future orders and handbooks related to the development of
STARS Security.
2. DISTRIBUTION. This Notice is distributed to offices w i h Washington Headquarters, Regional Airway Facilities Divisions, William J. Hughes Technical Center, Mike Monroney Aeronautical Center, various offices within the Department of Defense (DoD), and Airway Facilities selected field offices and services having Full STARS-2 (FS-2). An electronic bulletin shall be sent out notifying Offices of Primary Interest (OPI) whenever a major revision occurs.
3. CANCELLATION. Tlvs notice expires on or before twelve months from the date of signature and revisions are not applicable.
4. BACKGROUND.
a, The STARS program office anticipates the deployment of STARS FS-2 to several locations in Calendar Years (CY) 2002 and 2003. In order for the Airway Transportation Systems Specialists (ATSS) FV-2 101 -H, Systems Specialist (SS) FV-2 101 -I or DoD equivalent personnel to properly carry out their duties, Airway Facilities Security directives need to be in place at each location.
b. Incorporation of the STARS Security Processes and Procedures (SSPP) into a STARS Security Handbook and the inclusion of General Security policy into an order is an ongoing process with the targeted completion date scheduled for mid to late CY-2003. General security policies directive in nature specific to the STARS Security Handbook will be identified. This Handbook will be inclusive of the SSPPs and maintenance practices required for security.
c. This Notice has the effect of assigning interim direct authority to the body of Security Processes and Procedures (SSPP), and security maintenance intervals (STARS Security Checks) until the General Security Policy, orders and the STARS Security Handbook are completed and approved.
5. ROLES AND RESPONSIBILITY. The Office of Primary Responsibility (OPR) for this Notice is the Integrated Air Traffic Systems (ATS) Security Program Office, AOP-500. The OPR shall maintain this notice and have the authority for cancellation. The signature level for this document resides with the
Distribution: A-W(AF)-2; A-X(AF-3);
A-Y(AY)-2; A-Z(ACT-200/300/400/500/600)-3; A-FAF-O(STD)
Initiated By: AOP-500
N6191.3
NAS Operations Program Directorate level.
6. ROLES AND RESPONSIBILITIES FOR INTERIM SOLUTION.
a. AOP-500-NAS Security Division shall:
(1) Ensure General Security Policy is incorporated into existing orders or develop a separate NAS General Security Policy.
(2) Validate that equipment specific security policy, procedures and key performance parameters are in accordance with the general security policy.
(3) Validate that all necessary Maintenance Security Checks have been identified.
. (4) Collaborate with all appropriate stakeholders for the content of this Notice.
(5) Distribute this notice to organizations/agencies listed in paragraph 2.
(6) Verify that formal STARS training meets security requirements.
b. ATB-230-Terminal Business Unit shall:
(1) Deliver the Security Checklist identified in TI 6191.406 for validation to AOP-500.
(2) Deliver the STARS distribution list for use by AOP.
(3) Collaborate with all appropriate stakeholders for the content of this Notice.
c. The Operations Test &Evaluation (OT &E) Team and the Professional Airway Systems Specialists (PASS) shall:
Collaborate with all appropriate stakeholders for the content of this Notice.
d. The Airway Transportation Systems Specialist FV 2101-H, Systems Specialist FV-2101- I, and DoD equivalent personnel shall:
(1) Perform the identified STARS Security Checks in accordance with Appendix 1 and Appendix 2 of thls notice.
(2) Use Technical Instruction Manual TI 61 91.406, STARS System Administration and Security for the SOS.
(3) Use the STARS SSPP for General Security Practices and Procedures.
Page 2
7. RESPONSIBILITIES FOR FINALIZED SECURITY REQUIREMENTS, POLICY AND PROCEDURES (NAS General Security requirements are included within current and future directives and the STARS Security Handbook).
a. AOP-500 - NAS Security Division shall:
(1) Ensure all security-related requirements, policy, and key performance indicators are identified and standardized for the NAS.
(2) Validate that all necessary Maintenance Security Checks have been identified.
(3) Incorporate the General Security Policy into an existing order or create a NAS General Security Order.
(4) Collaborate with all appropriate stakeholders in formulating the content and format for the General Security Policy.
(5) Work with STARS Product Support, ATB-23 1 A, to identi@ security policies and procedures which impact the maintenance of STARS.
(6) Collaborate with all stakeholders for the content and format of the STARS Security Handbook.
(7) Ensure that either the amended order or new General Security Order follows the Clearance Record Procedure.
(8) Verify that STARS training meets security requirements.
b. ATB-230-The Terminal Business Unit shall:
(1) Complete production of the final version of the STARS Security Handbook.
(2) Incorporate the SSPPs into a standard maintenance format for the STARS Security Handbook and ensure resolution of issues regarding impact to STARS maintenance.
(3) Distribute the STARS Security Handbook to organizations listed in paragraph 2.
c. Airway Facilities and the Professional Airway Systems Specialists (PASS) shall: Collaborate with all appropriate stakeholders in formulating the content and style of the STARS Security Handbook.
d. The Airway Transportation Systems Specialist, FV-2101-H, Systems Specialist FV 2101- I, and the DoD equivalent shall:
(1) Follow the Security Policy and Procedures identified in the STARS Security Handbook.
(2) Perform the STARS Security Checks as identified in the STARS Security Handbook.
Page 3
(3) Use Technical Instruction Manual TI 61 91.406, STARS System Administration and Security for the SOS.
Director,-NAS Operations Program
Page 4
APPENDIX 1-STARS SECURITY CHECKS FOR ATSS OR SS 09/10/02
Performance Checks to be Accomplishsd by Either the ATSS or
SS Standards and Tolerances
1 Check rhost files
Check for disconneced FSL, ESL, and Support processors
3 Check key files
Weekly
4 Inspect connections
5 Review BSM audit logs
6 Check for core memory dump files
7 Review Unix audit logs
Successful no fault
execution
Successful no fault
execution
Successful no fault
exewtion
Successful no fault
exewtion
Successful no fault
exewtion
Successful no fault
execution
Successful no fault
execution
Maintenance Procedure
TI 61 91.406 Appendix A
Table A1
TI 6191.406 Appendix A
Table A1
TI 61 91 A06 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A1
TI 6191.406 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A1
TI 6191.406 Appendix A
Table A1
Page 1
09/10/02
APPENDIX 2-STARS SECURITY CHECKS FOR SS
Performance Checks to be
.. Accomelbhed ?x@e SS a
Check for obsolete system status message disk files on FS MCW processor
Monthly
Verify System Account passwords
Verify software baseline integrity
Check for inactive user accounts
identify all inactive and active accounts
Update a list of inactive users and disable user ID'S
Quarterly
Change system account passwords
Change passwords for root users
General Security Practices and Procedures
Standards and
Tolerances . '
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Successful no fault
execution
Not Applicable
Maintenance Procedure
TI 6191.406 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A1
TI 6191.406 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A?
TI 61 91.406 Appendix A
Table A1
TI 6191.406 Appendix A
Table A1
TI 61 91.406 Appendix A
Table A1
STARS Security Processes
and Procedures (SSPP)
Whole text after this change
U.S. DEPARTMENT OF TRANSPORTATION NOTICE FEDERAL AVIATION ADMINISTRATION N6191.3
09/10/02
SUBJ: STANDARD TERMINAL AUTOMATION REPLACEMENT SYSTEM (STARS) SECURITY
1. PURPOSE. This Notice is an interim security document which describes Federal Aviation Administration (FAA) procedures and processes while providing direction to STARS Operational Sites (SOS) within the National Airspace System (NAS). Procedures and processes described within this Notice will be included in current and future orders and handbooks related to the development of STARS Security.
2. DISTRIBUTION. This Notice is distributed to offices within Washington Headquarters, Regional Airway Facilities Divisions, William J. Hughes Technical Center, Mike Monroney Aeronautical Center, various offices within the Department of Defense (DoD), and Airway Facilities selected field offices and services having Full STARS-2 (FS-2). An electronic bulletin shall be sent out notifying Offices of Primary Interest (OPI) whenever a major revision occurs.
3. CANCELLATION. This notice expires on or before twelve months from the date of signature and revisions are not applicable.
4. BACKGROUND.
a. The STARS program office anticipates the deployment of STARS FS-2 to several locations in Calendar Years (CY) 2002 and 2003. In order for the Airway Transportation Systems Specialists (ATSS) FV-2101-H, Systems Specialist (SS) FV-2101-I or DoD equivalent personnel to properly carry out their duties, Airway Facilities Security directives need to be in place at each location.
b. Incorporation of the STARS Security Processes and Procedures (SSPP) into a STARS Security Handbook and the inclusion of General Security policy into an order is an ongoing process with the targeted completion date scheduled for mid to late CY-2003. General security policies directive in nature specific to the STARS Security Handbook will be identified. This Handbook will be inclusive of the SSPPs and maintenance practices required for security.
c. This Notice has the effect of assigning interim direct authority to the body of Security Processes and Procedures (SSPP), and security maintenance intervals (STARS Security Checks) until the General Security Policy, orders and the STARS Security Handbook are completed and approved.
5. ROLES AND RESPONSIBILITY. The Office of Primary Responsibility (OPR) for this Notice is the Integrated Air Traffic Systems (ATS) Security Program Office, AOP-500. The OPR shall maintain this notice and have the authority for cancellation. The signature level for this document resides with the
Distribution: A-W(AF)-2; A-X(AF-3); Initiated By: AOP-500 A-Y(AY)-2; A-Z(ACT-200/300/400/500/600)-3; A-FAF-0(STD)
N6191.3 09/10/02
NAS Operations Program Directorate level.
6. ROLES AND RESPONSIBILITIES FOR INTERIM SOLUTION.
a. AOP-500-NAS Security Division shall:
(1)Ensure General Security Policy is incorporated into existing orders or develop a separate NAS General Security Policy.
(2) Validate that equipment specific security policy, procedures and key performance parameters are in accordance with the general security policy.
(3) Validate that all necessary Maintenance Security Checks have been identified.
(4) Collaborate with all appropriate stakeholders for the content of this Notice.
(5) Distribute this notice to organizations/agencies listed in paragraph 2.
(6) Verify that formal STARS training meets security requirements.
b. ATB-230-Terminal Business Unit shall:
(1) Deliver the Security Checklist identified in TI 6191.406 for validation to AOP-500.
(2) Deliver the STARS distribution list for use by AOP.
(3) Collaborate with all appropriate stakeholders for the content of this Notice.
c. The Operations Test &Evaluation (OT &E) Team and the Professional Airway Systems Specialists (PASS) shall:
Collaborate with all appropriate stakeholders for the content of this Notice.
d. The Airway Transportation Systems Specialist FV 2101-H, Systems Specialist FV-2101- I, and DoD equivalent personnel shall:
(1) Perform the identified STARS Security Checks in accordance with Appendix 1 and Appendix 2 of this notice. (2) Use Technical Instruction Manual TI 6191.406, STARS System Administration and Security for the SOS.
(3) Use the STARS SSPP for General Security Practices and Procedures.
09/10/02 N6191.3
7. RESPONSIBILITIES FOR FINALIZED SECURITY REQUIREMENTS, POLICY AND PROCEDURES (NAS General Security requirements are included within current and future directives and the STARS Security Handbook).
a. AOP-500 – NAS Security Division shall:
(1) Ensure all security-related requirements, policy, and key performance indicators are identified and standardized for the NAS.
(2) Validate that all necessary Maintenance Security Checks have been identified.
(3) Incorporate the General Security Policy into an existing order or create a NAS General Security Order.
(4) Collaborate with all appropriate stakeholders in formulating the content and format for the General Security Policy.
(5) Work with STARS Product Support, ATB-231A, to identify security policies and procedures which impact the maintenance of STARS.
(6) Collaborate with all stakeholders for the content and format of the STARS Security Handbook.
(7) Ensure that either the amended order or new General Security Order follows the Clearance Record Procedure.
(8) Verify that STARS training meets security requirements.
b. ATB-230-The Terminal Business Unit shall:
(1) Complete production of the final version of the STARS Security Handbook.
(2) Incorporate the SSPPs into a standard maintenance format for the STARS Security Handbook and ensure resolution of issues regarding impact to STARS maintenance.
(3) Distribute the STARS Security Handbook to organizations listed in paragraph 2.
c. Airway Facilities and the Professional Airway Systems Specialists (PASS) shall: Collaborate with all appropriate stakeholders in formulating the content and style of the STARS Security Handbook.
d. The Airway Transportation Systems Specialist, FV-2101-H, Systems Specialist FV 2101- I, and the DoD equivalent shall:
(1) Follow the Security Policy and Procedures identified in the STARS Security Handbook.
(2) Perform the STARS Security Checks as identified in the STARS Security Handbook.
09/10/02 N6191.3 (3) Use Technical Instruction Manual TI 6191.406, STARS System Administration and Security for the SOS.
DeberadAoh Debofah A. Johnson
Director,NAS Operations Program
09/10/02
APPENDIX 1-STARS SECURITY CHECKS FOR ATSS OR SS
N6191.3
Performance Checks to be Accomplished by Either the ATSS or SS
Standards and Tolerances
Daily
Check rhost files
Check for disconneced FSL, ESL, and Support processors
Check key files
Weekly
Inspect connections
Review BSM audit logs
Check for core memory dump files
7 Review Unix audit logs
Successfui no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Maintenance Procedure
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
09/10/02
APPENDIX 2-STARS SECURITY CHECKS FOR SS
N6191.3
Performance Checks to be Accomplished by the SS Biweekly
Check for obsolete system status message disk files on FS MCW processor
Monthly
Verify System Account passwords
Verify software baseline integrity
Check for inactive user accounts
Identify all inactive and active accounts
Update a list of inactive users and disable user ID's
Quarterly
Change system account passwords
Change passwords for root users
General Security Practices and Procedures
Standards and Tolerances
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Successful no fault execution
Not Applicable
Maintenance Procedure
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
TI 6191.406 Appendix A Table A1
STARS Security Processes and Procedures (SSPP)