Notice N 6100.17 Interim EAS System Certification Revisions to Order JO 6100.1H CHG 1, Maintenance of NAS En Route Stage A - Air Traffic Control System
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Text read by OCR from a scanned file (3 of 14 pages). Check the original, as some words may be misread.
NOT6100.17
Distribution: 66AE, 61PD, 61BA, 61UV, 61UW, AAD0, AAG1, AAG2, AAH0, AK00, AAL0
Initiated By: AJE-12
NOTICE U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION N JO 6100.17
Air Traffic Organization Policy Effective Date:
06/08/11
Cancellation Date:
06/08/12
SUBJ: Interim EAS System Certification Revisions to Order JO 6100.1H CHG 1,
Maintenance of NAS En Route Stage A — Air Traffic Control System 1. Purpose. This notice advises all En Route Automation Modernization (ERAM) related stakeholders of intended updates to Order JO 6100.1H CHG 1, Maintenance of NAS En Route Stage A — Air Traffic Control System. 2. Audience. This notice requires actions by the Airway Transportation System Specialist (ATSS) at sites with the Facility, Service, and Equipment Profiles (FSEP): En Route Automation System (EAS).
3. Where Can I Find This Notice? An electronic version of this notice can be obtained from the following websites:
MYFAA website at https://employees.faa.gov/tools_resources/orders_notices/ ;
NAS Documentation (NASDOC) Team, AJW-172, website at
http://skil.act.faa.gov/AJW-172/library/default.aspx ;
En Route & Oceanic Support Help Desk website at https://enroutesupport.faa.gov . Printed copies will be distributed to national offices with an accurate inventory record in FSEP and a mailing address in the Directive Distribution System (DDS). 4. Cancellation. Not applicable. 5. Action. The changes to be made to Order JO 6100.1H CHG 1 are described in Attachment 1, JO 6100.1H CHG 1 Chapter 3 Proposed Changes, and Attachment 2, JO 6100.1H CHG 1 Appendix 1 Proposed Changes. 6. Background. ATO-E will be revising Order JO 6100.1H CHG 1 to include updates for chapter 3, Standards and Tolerances, Section 9, EAS System, and Appendix 1, Certification, Section 8, En Route Automation System (EAS), system certification table, in accordance with the Concept of Operations (ConOps) philosophy for new EAS software releases. The ConOps defines a recommended procedure for testing, validating, and certifying following the release of new software builds for EAS. Under the current EAS system certification table, the Advertised Services, FDP Capability, SDP Capability, and GIP Capability referenced the
06/08/11 N JO 6100.17
primary channel and backup channel to be verified in the Certification parameters. Therefore, in accordance with ERAM design, the ConOps philosophy of testing and certifying the EAS system following a new software release is to utilize the capabilities of theTest and Training (T&T) laboratory and the backup channel in test mode. As a result, references to the primary channel and backup channel are to be removed from the Certification parameters.
7. Risks.
a. Operational. There are no operational risks associated with this notice.
b. Safety. In compliance with the latest edition of Order 1100.161, Air Traffic Safety Oversight, and JO 1000.37, ATO Safety Management System, all NAS changes, including notices, require an SRM assessment prior to delivery. A safety risk assessment has been performed on this notice. The SRM information for this notice is attached as Attachment 3, Safety Risk Management Decision Memorandum. For further guidance in developing SRM documentation, refer to the latest edition of the Safety Management System (SMS)Manual.
c. Security. There are no security risks associated with this notice.
8. Clarification or Comments. For further information or comments, please contact the ERAM Second Level Support (SLS) Engineering team via the En Route and Oceanic Support Help Desk at (800) 337-0308.
Vincent Capezzuto En Route &Oceanic Services Program Operations/Surveillance & Broadcast Services, AJE-1
Att.1.COVER
06/08/11 N JO 6100.17 ATTACHMENT 1. JO 6100.1H CHG 1 CHAPTER 3 PROPOSED CHANGES
INTERIM UPDATE PER NOTICE N JO 6100.17
Section 9. EN ROUTE AUTOMATION SYSTEM (EAS)
Tolerance/Limit
Parameter Reference Paragraph Standard
Initial Operating
3–300. FDP CAPABILITY. TI 6110.110, par. A.2.63, TI 6110.102, chap. 5, and par. 5–17g.
Satisfactory processing and transfer of flight data using the online certification program, manual techniques (e.g., TD messages), M&C views, or diagnostic tests.
Same as standard
Same as standard
3–301. SDP CAPABILITY. TI 6110.110, chapter 7, par. 5–17g
Satisfactory processing and transfer of surveillance (radar) data using the online certification program, manual techniques, M&C views, or diagnostic tests.
Same as standard
Same as standard
3–302. GIP CAPABILITY. TI 6110.110, table A– 195, par. A.2.63, par. A.2.39, and par. 5–17g
Satisfactory processing and transfer of general information data using the online certification program, manual techniques, M&C views, or diagnostic tests.
Same as standard
Same as standard
Att.2.COVER
06/08/11 N JO 6100.17 ATTACHMENT 2. JO 6100.1H CHG 1 APPENDIX 1 PROPOSED CHANGES
INTERIM UPDATE PER NOTICE N JO 6100.17
Section 8. EN ROUTE AUTOMATION SYSTEM (EAS)
Advertised Service Certification Parameter Reference Paragraph
FDP Capability Satisfactory processing and transfer of flight data
App 1 change
Par. 3–300
SDP Capability Satisfactory processing of surveillance data
Par. 3–301
GIP Capability Satisfactory processing of general information data
Par. 3–302
Connectivity Capability Successful connectivity to EADS Par. 3–303
Successful connectivity to ECG Par. 3–303
Input/Output Capability Satisfactory operation of data entry and ability to receive data at the M&C
Par. 3–304
Control Capability Satisfactory reconfiguration of OUs Par. 3–305
Successful fault sensing and status reporting
Par. 3–305
Configuration Capability Satisfactory software configurations, version level, and adaptation
Par. 3–306
Normal Certification Interval: Event based
Allowable Exceptions: Advertised services, individual channels (A or B), or individual elements
Person Responsible for Certification: ATSS with certification authority
Certification Entries in Facility Maintenance Log:
Without Exception:
EAS Certified
EAS Channel A Certified, local software (release ID)
EAS Channel B Certified, local software (release ID)
With Exception:
EAS Certified except (designation) channel processing
Removing Exception:
EAS (channel designation) Certified
06/08/11 N JO 6100.17 ATTACHMENT 3. SAFETY RISK MANAGEMENT DECISION MEMORANDUM
COVER PAGE
Federal Aviation
Administration
Memorandum
Date: APR 1 4 2011
To: Dan McGovern Program Management, Manager, AJE-12D
From: Sharon M. Davis SRM Lead, AJE-1282
SRMDM_Notice JO 6100.17_final 110414
Prepared by: Steven D. Craig, Host Hardware System Engineer, AJE-1281
Subject: Safety Risk Management DecisionMemorandum (SRMDM) for Notice JO 6100.17, Interim Updates to EAS System Certification Revisions to Order JO 6100.1H CHG 1, Maintenance of NAS En Route Stage A – Air Traffic control System.
National Airspace System (NAS) Change:
The Notice (N JO 6100.17) is being issued to provide interim updates to the maintenance handbook, Order JO 6100.1H CHG 1 for changes to En Route Automation System (EAS) certification table. This notice simplifies the certification parameters for Flight Data Processor (FDP), Radar Data Processor (RDP) and General Information Processor (GIP) capability by removing the terminology "via primary channel" and "via backup channel" as part of the certification parameter. As a result, the EAS certification table falls in accordance with the Concept of Operations (ConOps) philosophy for new EAS software releases as follows:
SECTION 8: EN ROUTE AUTOMATION (EAS)
FDP Capability Satisfactory processing and transfer of flight data RDP Capability Satisfactory processing and transfer of surveillance data GIP Capability Satisfactory processing of general information data
Rationale for not requiring further SRM analysis:
This change does not require any further safety analysis since that there is no impact to the National Airspace System (NAS). No changes are being made to the intent of EAS certification. The certification parameter remains the same without referring to both the primary channel and the backup channel in the certification parameter. As a result, with no changes to any procedures in certifying EAS, this Notice does not require any additional SRM analysis.
We, the undersigned, understand the change described above does not negatively affect safety.
Reviewed by:
4-14-11 Tom Ackermann Date Systems Engineering AJE-1281Manager
Approved by:
J.D.Hunt Date 4/14/2011 Systems Requirements AJE-128 Manager