Notice N JO 6000.257 Interim Change to Section 2.6.4 b. (3) Tester Responsibilities in Order JO 6000.202 Change 5, Terminal Second Level Engineering Operational Support Facility Operating Procedures

This notice releases an interim change to the OSF Delivery Process – Tester Responsibilities in Order JO 6000.202 Change 5, Terminal Second Level Engineering Operational Support Facility Operating Procedures.

This document is historical. It may have been replaced. Check the official source before relying on it.

Official source ↗

Interim Change to Section 2.6.4 b. (3) Tester Responsibilities in Order JO 6000.202 Change 5, Terminal Second Level Engineering Operational Support Facility Operating Procedures

This notice releases an interim change to the OSF Delivery Process – Tester Responsibilities in Order JO 6000.202 Change 5, Terminal Second Level Engineering Operational Support Facility Operating Procedures.