Radar Vectors
Proposed Rule Proposed Issued Jun 4, 2003 4 pages Copy saved Nov 17, 2026

68 FR 33420 Airworthiness Directives; Raytheon Aircraft Company Model 1900, 1900C, and 1900D Airplanes

This document proposes to supersede Airworthiness Directive (AD) 97-22-16, which applies to certain Raytheon Model 1900, 1900C, and 1900D airplanes. AD 97-22-16 currently requires you to replace the bearings on the vent blower assemblies with improved design bearings and install a thermal protection device for the vent blowers. That AD resulted from reports of vent blower assembly bearings seizing and locking the blower motor on several of the affected airplanes. This proposed AD is the result of reports that vent blower assemblies modified in accordance with AD 97-22-16 are still malfunctioning. This proposed AD would retain the actions required in AD 97-22-16 for certain vent blower assemblies and require you to incorporate further product improvement modifications on all affected vent blower assemblies. The actions specified by this proposed AD are intended to prevent smoke from entering the cockpit and cabin due to the current configuration of vent blower assemblies, which could result in the pilot becoming incapacitated or impairing her/his judgment. Such a condition could lead to the pilot not being able to make critical flight safety decisions and result in loss of control of the airplane.

This document is proposed. It may have been replaced. Check the official source before relying on it.

Official source ↗ Official PDF ↗

14 CFR Part 39

[Docket No. 2003-CE-16-AD] RIN 2120-AA64

Airworthiness Directives; Raytheon Aircraft Company Model 1900, 1900C, and 1900D Airplanes

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

SUMMARY: This document proposes to supersede Airworthiness Directive (AD) 97-22-16, which applies to certain Raytheon Model 1900, 1900C, and 1900D airplanes. AD 97-22-16 currently requires you to replace the bearings on the vent blower assemblies with improved design bearings and install a thermal protection device for the vent blowers. That AD resulted from reports of vent blower assembly bearings seizing and locking the blower motor on several of the affected airplanes. This proposed AD is the result of reports that vent blower assemblies modified in accordance with AD 97-22-16 are still malfunctioning. This proposed AD would retain the actions required in AD 97-22-16 for certain vent blower assemblies and require you to incorporate further product improvement modifications on all affected vent blower assemblies. The actions specified by this proposed AD are intended to prevent smoke from entering the cockpit and cabin due to the current configuration of vent blower assemblies, which could result in the pilot becoming incapacitated or impairing her/his judgment. Such a condition could lead to the pilot not being able to make critical flight safety decisions and result in loss of control of the airplane.

Dates

DATES: The Federal Aviation Administration (FAA) must receive any comments on this proposed rule on or before August 4, 2003.

ADDRESSES: Submit comments to FAA, Central Region, Office of the Regional Counsel, Attention: Rules Docket No. 2003-CE-16-AD, 901 Locust, Room 506, Kansas City, Missouri 64106. You may view any comments at this location between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. You may also send comments electronically to the following address: [email protected]. Comments sent electronically must contain "Docket No. 2003-CE-16-AD" in the subject line. If you send comments electronically as attached electronic files, the files must be formatted in Microsoft Word 97 for Windows or ASCII text.

Addresses

You may get service information that applies to this proposed AD from Raytheon Aircraft Company, 9709 E. Central, Wichita, Kansas 67201-0085; telephone: (800) 429-5372 or (316) 676-3140. You may also view this information at the Rules Docket at the address above.

FOR FURTHER INFORMATION CONTACT: Dan Withers, Aerospace Engineer, Wichita Aircraft Certification Office, FAA, 1801 Airport Road, Wichita, Kansas 67209; telephone: (316) 946-4196; facsimile: (316) 946-4107.

Supplementary Information

SUPPLEMENTARY INFORMATION:

Comments Invited

How Do I Comment on This Proposed AD?

The FAA invites comments on this proposed rule. You may submit whatever written data, views, or arguments you choose. You need to include the proposed rule's docket number and submit your comments to the address specified under the caption ADDRESSES. We will consider all comments received on or before the closing date. We may amend this proposed rule in light of comments received. Factual information that supports your ideas and suggestions is extremely helpful in evaluating the effectiveness of this proposed AD action and determining whether we need to take additional rulemaking action.

Are There Any Specific Portions of This Proposed AD I Should Pay Attention to?

Are There Any Specific Portions of This Proposed AD I Should Pay Attention to?

The FAA specifically invites comments on the overall regulatory, economic, environmental, and energy aspects of this proposed rule that might suggest a need to modify the rule. You may view all comments we receive before and after the closing date of the rule in the Rules Docket. We will file a report in the Rules Docket that summarizes each contact we have with the public that concerns the substantive parts of this proposed AD.

How Can I Be Sure FAA Receives My Comment?

How Can I Be Sure FAA Receives My Comment?

If you want FAA to acknowledge the receipt of your mailed comments, you must include a self-addressed, stamped postcard. On the postcard, write "Comments to Docket No. 2003-CE-16-AD." We will date stamp and mail the postcard back to you.

Discussion

Discussion

Has FAA Taken Any Action to This Point?

Reports of the vent blower assembly bearings seizing and locking the blower motor on several Raytheon Model 1900, 1900C, and 1900D airplanes caused us to issue AD 97-22-16, Amendment 39-10187 (62 FR 58894, October 31, 1997. AD 97-22-16 currently requires the following on certain Raytheon Model 1900, 1900C, and 1900D airplanes:

Has FAA Taken Any Action to This Point?

--Incorporating a modification to replace the bearings in the vent blower assemblies with improved design bearings (Electromech Technologies Kit No. EM630-201-1 or EM630-201-2 (as appropriate for the blower serial number)); and --Installing a thermal protection for the vent blowers (Electromech Technologies Kit No. EM630-201-1 or EM630-201-2 or Advanced Industries Kit No. BC80A905 (as appropriate for the blower serial number)).

What Has Happened Since AD 97-22-16 To Initiate This Proposed Action?

What Has Happened Since AD 97-22-16 To Initiate This Proposed Action?

The FAA has received reports that vent blower assemblies modified in accordance with AD 97-22-16 are still malfunctioning.

Is There Service Information That Applies to This Subject?

Raytheon has issued Mandatory Service Bulletin SB 21-3448, Issued: October, 2002.

What Are the Provisions of This Service Information?

What Are the Provisions of This Service Information?

This service bulletin includes procedures for incorporating Electromech Technologies Modification Kit No. P/N 630-203-1 and Advanced Industries Modification Kit No. Kit No. P/N BC80A-901-3.

The FAA's Determination and an Explanation of the Provisions of This Proposed AD

What Has FAA Decided?

What Has FAA Decided?

After examining the circumstances and reviewing all available information related to the incidents described above, we have determined that:

--The unsafe condition referenced in this document exists or could develop on other Raytheon Model 1900, 1900C, and 1900D airplanes of the same type design; --The actions specified in AD 97-22-16 and the previously-referenced service information should be accomplished on the affected airplanes; and --AD action should be taken in order to correct this unsafe condition.

What Would This Proposed AD Require?

What Would This Proposed AD Require?

This proposed AD would supersede AD 97-22-16 with a new AD that would retain the actions required in AD 97-22-16 for certain vent blower assemblies and require you to incorporate further product improvement modifications for all affected vent blower assemblies.

How Does the Revision to 14 CFR Part 39 Affect This Proposed AD?

How Does the Revision to 14 CFR Part 39 Affect This Proposed AD?

On July 10, 2002, FAA published a new version of 14 CFR part 39 (67 FR 47997, July 22, 2002), which governs FAA's AD system. This regulation now includes material that relates to special flight permits, alternative methods of compliance, and altered products. This material previously was included in each individual AD. Since this material is included in 14 CFR part 39, we will not include it in future AD actions.

Cost Impact

Cost Impact

How Many Airplanes Would This Proposed AD Impact?

We estimate that this proposed AD affects 300 airplanes in the U.S. registry.

What Would Be the Cost Impact of This Proposed AD on Owners/Operators of the Affected Airplanes?

We estimate the following costs to accomplish this proposed modification:

What Would Be the Cost Impact of This Proposed AD on Owners/Operators of the Affected Airplanes?

Total cost

Labor cost Parts cost per Total cost on U.S. operators

airplane

3 workhours x $60 per hour = $180... $415 (for both the $595 $595 x 300 = $178,500

forward and aft

ventilation blower

assemblies).

Regulatory Impact

Would This Proposed AD Impact Various Entities?

The regulations proposed herein would not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. Therefore, it is determined that this proposed rule would not have federalism implications under Executive Order 13132.

Would This Proposed AD Involve a Significant Rule or Regulatory Action?

Would This Proposed AD Involve a Significant Rule or Regulatory Action?

For the reasons discussed above, I certify that this proposed action (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) if promulgated, will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A copy of the draft regulatory evaluation prepared for this action has been placed in the Rules Docket. A copy of it may be obtained by contacting the Rules Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

Accordingly, under the authority delegated to me by the Administrator, the Federal Aviation Administration proposes to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

PART 39--AIRWORTHINESS DIRECTIVES

1. The authority citation for part 39 continues to read as follows:

Authority: 49 U.S.C. 106(g), 40113, 44701.

§ 39.13 [Amended]

2. FAA amends § 39.13 by removing Airworthiness Directive (AD) 97-22-16, Amendment 39-10187 (62 FR 58894, October 31, 1997), and by adding a new AD to read as follows:

§ 39.13 [Amended]

Raytheon Aircraft Company: Docket No. 2003-CE-16-AD; Supersedes AD 97-22-16, Amendment 39-10187.

(a) What airplanes are affected by this AD? This AD affects the following airplane models and serial numbers that are:

(1) Certificated in any category; and

(2) Equipped with vent blower assembly, part number 114-380028-1,

114-380028-3, 114-380028-5, or 114-380028-7.

Model Serial Nos.

1900 … UA-3.

1900C … UB-1 through UB-74 and UC-1

through UC-174.

1900 (C-12J) … UD-1 through UD-6.

1900D … UE-1 through UE-427.

(b) Who must comply with this AD? Anyone who wishes to operate any of the airplanes identified in paragraph (a) of this AD must comply with this AD.

(c) What problem does this AD address? The actions specified by this AD are intended to prevent smoke from entering the cockpit and cabin due to the current configuration of vent blower assemblies, which could result in the pilot becoming incapacitated or impairing his/her judgment. Such a condition could lead to the pilot not being able to make critical flight safety decisions and result in loss of control of the airplane.

(d) What actions must I accomplish to address this problem? To address this problem, you must accomplish the following:

Actions Compliance Procedures

(1) Check the maintenance Within the next In accordance

records to determine if a part 800 hours time-in- Raytheon Aircraft

number (P/N)114-380028-1, 114- with service Mandatory Service

380028-3, 114-380028-5, or 114- (TIS) after the is Bulletin SB 21-

380028-7 ventilation blower effective date of 3448, Issued:

assembly is installed. this AD, unless October, 2002.

already The owner/

accomplished. operator holding

at least a

private pilot

certificate as

authorized by

section 43.7 of

the Federal

Aviation

Regulations (14

CFR 43.7) may

perform this

check.

(2) If, by checking the Prior to further The owner/operator

maintenance records, the owner/ flight after the holding at least

operator can definitely show maintenance a private pilot

that a P/N 114-380028-1, 114- records check certificate as

380028-3, 114-380028-5, or 114- required in authorized by

380028-7 ventilation blower paragraph (d)(1) section 43.7 of

assembly is not installed, no of this AD. the Federal

further action is required by Aviation

this AD. Make an entry into the Regulations (14

aircraft records showing CFR 43.7) may

compliance with this portion of perform this

the AD in accordance with check.

section 43.9 of the Federal Aviation Regulations (14 CFR 43.9).

(3) If, by checking the Accomplish all In accordance with

maintenance records, the owner/ modifications Raytheon Aircraft

operator can definitely show prior to further Mandatory Service

that a P/N 114-380028-1, 114- flight after the Bulletin SB 21-

380028-3, 114-380028-5, or 114- maintenance check 3448, Issued:

380028-7 ventilation blower required in October, 2002,

assembly is installed, paragraph (d)(1) and Raytheon

accomplish the following for unless already Service Bulletin

each P/N:. accomplished. No. 2721, Issued:

(i) P/N 114-380028-1: modify in January, 1997.

accordance with Raytheon Service Bulletin No. 2721, Issued: January, 1997, prior to incorporating Electromechanic Technologies Modification Kit No. P/N 630-203-01 and changing the P/N to 114-380028-11.. (ii) P/N 114-380028-3: incorporate Advanced Industries Modification Kit No. P/N BC80A-901-3 and change the P/N to 114-380028-9. (iii) P/N 114-380028-5 with a serial number (S/N) of 2162 or above or with a S/N of 2162 with an "A" suffix: no modification is required. Change the part number to 114-380028-11 and make an entry into the aircraft records that shows compliance with this portion of the AD in accordance with section 43.9 of the Federal Aviation Regulations (14 CFR 43.9)..

(iv) P/N 114-380028-5 with a S/N prior to 2162 without an "A" suffix: incorporate Electromechanic Technologies Modification Kit No. P/N 630-203-01 and change the P/N to 114-380028-11. (v) P/N 114-380028-7: incorporate Advanced Industries Modification Kit No. P/N BC80A-901-3 and change the P/N to 114-380028-9..

(4) If the pilot cannot Inspect within the In accordance with

definitely show that a P/N 114- next 800 hours Raytheon Aircraft

380028-1, 114-380028-3, 114- TIS after the Mandatory Service

380028-5, or 114-380028-7 effective date of Bulletin SB 21-

ventilation blower assembly is this AD. Perform 3448, Issued:

installed through the all modifications October, 2002,

maintenance records check, an prior to further and Raytheon

appropriately-rated mechanic flight. Service Bulletin

must perform an inspection to No. 2721, Issued:

determine the P/N of the January, 1997.

installed ventilation blower assembly and accomplish the applicable modification required in paragraphs (d)(2)(i), (d)(2)(ii), (d)(2)(iii), (d)(2)(iv), and (d)(2)(v) of this AD.

(5) Do not install any P/N 114- As of the In accordance with

380028-1, 114-380028-3, 114- effective date of Raytheon Aircraft

380028-5, or 114-380028-7 this AD. Mandatory Service

ventilation blower assembly, Bulletin SB 21-

unless it has been modified as 3448, Issued:

specified in paragraphs October, 2002,

(d)(2)(i), (d)(2)(ii), and Raytheon

(d)(2)(iii), (d)(2)(iv), and Service Bulletin

(d)(2)(v) of this AD. No. 2721, Issued:

January, 1997.

(e) Can I comply with this AD in any other way?

(1) To use an alternative method of compliance or adjust the compliance time, follow the procedures in 14 CFR 39.19. Send these requests to the Manager, Wichita Aircraft Certification Office (ACO). For information on any already approved alternative methods of compliance, contact Dan Withers, Aerospace Engineer, Wichita Aircraft Certification Office, FAA, 1801 Airport Road, Wichita, Kansas 67209; telephone: (316) 946-4196; facsimile: (316) 946-4107.

(2) Alternative methods of compliance approved in accordance with AD 97-22-16, which is superseded by this AD, are not approved as alternative methods of compliance with this AD.

(f) How do I get copies of the documents referenced in this AD? You may get copies of the documents referenced in this AD from Raytheon Aircraft Company, 9709 E. Central, Wichita, Kansas 67201-0085; telephone: (800) 429-5372 or (316) 676-3140. You may view these documents at FAA, Central Region, Office of the Regional Counsel, 901 Locust, Room 506, Kansas City, Missouri 64106.

(g) Does this AD action affect any existing AD actions? This amendment supersedes AD 97-22-16, Amendment 39-10187.

Issued in Kansas City, Missouri, on May 28, 2003. David R. Showers, Acting Manager, Small Airplane Directorate, Aircraft Certification Service.