Radar Vectors
Proposed Rule Proposed Issued Jun 12, 2002 11 pages Copy saved Nov 17, 2026

67 FR 40239 Airworthiness Directives; General Electric Company (GE) CF6-45, -50, -80A, -80C2, and -80E1 Turbofan Engines

The Federal Aviation Administration (FAA) proposes to supersede three existing airworthiness directives (AD's), that are applicable to GE CF6-45, -50, -80A, -80C2, and -80E1 turbofan engines. Those AD's currently require specific handling of the GE CF6 series high pressure compressor rotor (HPCR) stage 3-9 spools during a fluorescent penetrant inspection process, and an initial and repetitive ultrasonic and eddy current inspections of certain HPCR stage 3-9 spools for cracks. This proposal would remove the AD that requires special handling of the spools during fluorescent-penetrant inspection, and would adjust and combine the initial and repetitive inspection requirements, currently listed in two AD's, into one AD for the HPCR stage 3-9 spool. This proposal aligns repetitive inspection requirements with the more stringent initial inspection requirements required by AD 2000-16-12, Amendment 39-11868 (65 FR 50623, August 21, 2000) and terminates AD 95-18-14, Amendment 39-9361 (60 FR 46216, September 6, 1995) that is no longer necessary. The actions specified in the proposed AD are intended to prevent cracks which can cause separation of the HPCR stage 3-9 spool and possible uncontained engine failure.

This document is proposed. It may have been replaced. Check the official source before relying on it.

Official source ↗ Official PDF ↗

14 CFR Part 39

[Docket No. 2001-NE-26-AD] RIN 2120-AA64

Airworthiness Directives; General Electric Company (GE) CF6-45, - 50, -80A, -80C2, and -80E1 Turbofan Engines

AGENCY: Federal Aviation Administration, DOT.

ACTION: Notice of proposed rulemaking (NPRM).

SUMMARY: The Federal Aviation Administration (FAA) proposes to supersede three existing airworthiness directives (AD's), that are applicable to GE CF6-45, -50, -80A, -80C2, and -80E1 turbofan engines. Those AD's currently require specific handling of the GE CF6 series high pressure compressor rotor (HPCR) stage 3-9 spools during a fluorescent penetrant inspection process, and an initial and repetitive ultrasonic and eddy current inspections of certain HPCR stage 3-9 spools for cracks. This proposal would remove the AD that requires special handling of the spools during fluorescent-penetrant inspection, and would adjust and combine the initial and repetitive inspection requirements, currently listed in two AD's, into one AD for the HPCR stage 3-9 spool. This proposal aligns repetitive inspection requirements with the more stringent initial inspection requirements required by AD 2000-16-12, Amendment 39-11868 (65 FR 50623, August 21, 2000) and terminates AD 95-18-14, Amendment 39-9361 (60 FR 46216, September 6, 1995) that is no longer necessary. The actions specified in the proposed AD are intended to prevent cracks which can cause separation of the HPCR stage 3-9 spool and possible uncontained engine failure.

Dates

DATES: Comments must be received by August 12, 2002.

ADDRESSES: Submit comments in triplicate to the Federal Aviation Administration (FAA), New England Region, Office of the Regional Counsel, Attention: Rules Docket No. 2001-NE-26-AD, 12 New England Executive Park, Burlington, MA 01803-5299. Comments may be inspected at this location, by appointment, between 8 a.m. and 4:30 p.m., Monday through Friday, except Federal holidays. Comments may also be sent via the Internet using the following address: "[email protected]". Comments sent via the Internet must contain the docket number in the subject line.

Addresses

The service information referenced in the proposed rule may be obtained from General Electric Company via Lockheed Martin Technology Services, 10525 Chester Road, Suite C, Cincinnati, Ohio 45215, telephone (513) 672-8400, fax (513) 672-8422. This information may be examined, by appointment, at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA.

For Further Information Contact

FOR FURTHER INFORMATION CONTACT: Chris Gavriel, Aerospace Engineer, Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive Park, Burlington, MA 01803-5299; telephone (781) 238-07147; fax (781) 238-7199.

SUPPLEMENTARY INFORMATION:

Comments Invited

Comments Invited

Interested persons are invited to participate in the making of the proposed rule by submitting such written data, views, or arguments as they may desire. Communications should identify the Rules Docket number and be submitted in triplicate to the address specified above. All communications received on or before the closing date for comments, specified above, will be considered before taking action on the proposed rule. The proposals contained in this action may be changed in light of the comments received.

Comments are specifically invited on the overall regulatory, economic, environmental, and energy aspects of the proposed rule. All comments submitted will be available, both before and after the closing date for comments, in the Rules Docket for examination by interested persons. A report summarizing each FAA-public contact concerned with the substance of this proposal will be filed in the Rules Docket.

Commenters wishing the FAA to acknowledge receipt of their comments submitted in response to this action must submit a self-addressed, stamped postcard on which the following statement is made: "Comments to Docket Number 2001-NE-26-AD." The postcard will be date stamped and returned to the commenter.

Availability of NPRM's

Availability of NPRM's

Any person may obtain a copy of this NPRM by submitting a request to the FAA, New England Region, Office of the Regional Counsel, Attention: Rules Docket No. 2001-NE-26-AD, 12 New England Executive Park, Burlington, MA 01803-5299.

Discussion

On August 29, 1995, the FAA issued AD 95-18-14, Amendment 39-9361 (60 FR 46216, September 6, 1995), to require specific handling of the HPCR 3-9 spool during fluorescent penetrant inspection whenever that inspection is performed on these spools. That action was prompted by a report of an uncontained failure of a General Electric Company (GE) CF6-50 HPCR stage 3-9 spool. This requirement, adopted at that time by that AD, has since been incorporated in General Electric fluorescent penetrant inspection (FPI) Standard Practice 70-32-02.

Discussion

On October 18, 1999, the FAA issued AD 99-24-15, Amendment 39-11440 (64 FR 66554, November 29, 1999), to require more stringent ultrasonic and eddy current inspection intervals for certain HPCR stage 3-9 spools, added CF6-80E1 engines to the inspection program, added inspection requirements for spools manufactured from 8 inch diameter billet, added inspection requirements for stage 3-5 blade slot bottoms, and added inspection requirements for web and hub-to-web transition areas. Airworthiness Directive 99-24-15 superseded AD 95-23-03, Amendment 39-9423 (60 FR 57803, November 21, 1995). Subsequent to that action, there was an additional HPCR stage 3-9 spool separation in service and a reassessment was made of the adequacy of the existing program in place at that time, to prevent a HPCR stage 3-9 spool cracking and separation. Based on that assessment, the FAA determined there was a need to make changes to AD 99-24-15.

On August 10, 2000, the FAA issued AD 2000-16-12, Amendment 39-11868 (65 FR 50623, August 21, 2000), to require initial ultrasonic and eddy current inspections of certain HPCR stage 3-9 spools for cracks at a further accelerated rate relative to the requirements of AD 99-24-15. AD 2000-16-12 required initial inspection, on a priority basis, of HPCR stage 3-9 spools that had higher probability of failure based on service life. AD 2000-16-12 did not require repetitive inspection requirements. Certain inspection requirements of AD 99-24-15, which are still applicable today, are no longer consistent with that recent corrective action. Therefore, a comprehensive initial and repetitive inspection program is being proposed for the affected 3-9 spools still in service. This proposed rule combines the requirements of AD 99-24-15 and AD 2000-16-12 with the following additional changes:

• Extends the accelerated initial inspection requirements of AD 2000-16-12 beyond July 28, 2001,

• Relaxes initial compliance requirement for the CF6-50 and CF6-80A 13-inch billet spools to make them consistent with 9 and 10-inch billet spools,

• Adds repetitive inspection requirements to the existing one-time inspection requirement for the CF6-80C and -80E series engine spool web and hub-to-web transition areas,

• Replaces engine shop visit inspection threshold limits for certain spools with cyclic limits,

• Adds a time limit for slot bottom inspection for 13-inch billet spools for CF6-50, -80A engines and for 9-inch and 10-inch billet spools for CF6-50, -80A, and -80C engines,

• Adds time limitation for the initial inspection and adds repeat inspection intervals for stage 3-5 slot bottom inspection for certain spools,

• Adds a time limit for one-time inspection of 8-inch billet 2-piece spools, and

• Provides for an alternative modular inspection for the slot bottoms,

The action was prompted by a report of an uncontained failure of an HPCR 3-9 spool. These conditions, if not corrected, could result in separation of the HPCR stage 3-9 spool and a possible uncontained engine failure.

Manufacturer's Service Information

The FAA has reviewed and approved the technical contents of the following GE Alert Service Bulletins (ASB's):

Manufacturer's Service Information

ASB GE CF6-50 72-A1108, Revision 4, dated June 6, 2001 ASB GE CF6-50 72-A1131, Revision 3, dated June 6, 2001 ASB GE CF6-50 72-A1157, Revision 3, dated January 31, 2002 ASB GE CF6-80A 72-A0678, Revision 4, dated June 6, 2001 ASB GE CF6-80A 72-A0691, Revision 4, dated June 6, 2001 ASB GE CF6-80A 72-A0719, Revision 4, dated January 31, 2002 ASB GE CF6-80C2 72-A0812, Revision 3, dated June 6, 2001 ASB GE CF6-80C2 72-A0848, Revision 7, dated June 6, 2001 ASB GE CF6-80C2 72-A0934, Revision 3, dated January 31, 2002 ASB GE CF6-80E1 72-A0135, Revision 2, dated June 6, 2001 ASB GE CF6-80E1 72-A0126, Revision 4 , dated June 6, 2001 ASB GE CF6-80E1 72-A0137, Revision 3, dated January 31, 2002

Those ASB's describe procedures for eddy current and ultrasonic inspections of HPCR stage 3-9 spools for cracks.

FAA's Determination of an Unsafe Condition and Proposed Actions

FAA's Determination of an Unsafe Condition and Proposed Actions

Since an unsafe condition has been identified that is likely to exist or develop on other GE CF6-45, -50, -80A, -80C2, and -80E1 turbofan engines of this same type design, the proposed AD would supersede AD 95-18-14, AD 99-24-15, and AD 2000-16-12 to require initial and repetitive ultrasonic and eddy current inspections. The actions would be required to be done in accordance with the service bulletin described previously.

Interim Actions

Interim Actions

These proposed actions are considered interim actions, and may be changed in future rulemaking actions.

Cost Analysis

There are approximately 3,147 engines of the affected design in the worldwide fleet. The FAA estimates that 1,289 engines installed on airplanes of U.S. registry would be affected by this proposed AD. The FAA also estimates that it would take approximately 238 work hours per engine to perform the proposed actions. The average labor rate is $60 per work hour. Required parts would cost approximately $35,000 per engine. In addition, because of the previous AD actions, the FAA estimates that only 72 percent (928 engines) of the engines installed on airplanes of U.S. registry would be affected. Based on these figures, the total cost of the proposed AD on U.S. operators is estimated to be $45,731,840.

Regulatory Analysis

Regulatory Analysis

This proposed rule does not have federalism implications, as defined in Executive Order 13132, because it would not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. Accordingly, the FAA has not consulted with state authorities prior to publication of this proposed rule.

For the reasons discussed above, I certify that this proposed regulation (1) is not a "significant regulatory action" under Executive Order 12866; (2) is not a "significant rule" under the DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and (3) if promulgated, will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. A copy of the draft regulatory evaluation prepared for this action is contained in the Rules Docket. A copy of it may be obtained by contacting the Rules Docket at the location provided under the caption ADDRESSES.

List of Subjects in 14 CFR Part 39

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Safety.

The Proposed Amendment

Accordingly, pursuant to the authority delegated to me by the Administrator, the Federal Aviation Administration proposes to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

PART 39--AIRWORTHINESS DIRECTIVES

1. The authority citation for part 39 continues to read as follows:

Authority: 49 U.S.C. 106(g), 40113, 44701.

§ 39.13 [Amended]

2. Section 39.13 is amended by removing Amendments 39-9361 (60 FR 46216, September 6, 1995), 39-11440 (64 FR 66554, November 29, 1999), and 39-11868 (65 FR 50623, August 21, 2000), and by adding a new airworthiness directive:

§ 39.13 [Amended]

General Electric Company (GE): Docket No. 2001-NE-26-AD. Supersedes AD 95-18-14, Amendment 39-9361; AD 99-24-15, Amendment 39-11440; and AD 2000-16-12, Amendment 39-11868.

Applicability

This airworthiness directive (AD) is applicable to GE CF6-45, - 50, -80A, -80C2, and -80E1 turbofan engines with high pressure compressor rotor (HPCR) stage 3-9 spools with part numbers (P/N's) listed in the following Table 1 installed:

Applicability

Table 1

Engine model HPCR stage 3-9 spool P/N

CF6-45/50 Series Engines … 9136M89G02, 9136M89G03, 9136M89G06,

9136M89G07, 9136M89G08, 9136M89G09,

9136M89G17, 9136M89G18, 9136M89G19,

9136M89G21, 9136M89G22, 9136M89G27,

9136M89G29, 9253M85G01, 9253M85G02,

9273M14G01, 9331M29G01.

CF6-80A Series Engines … 9136M89G10, 9136M89G11, 9136M89G20,

9136M89G21, 9136M89G22, 9136M89G27,

9136M89G28.

CF6-80C2 Series Engines … 1333M66G01, 1333M66G03, 1333M66G07,

1333M66G09, 1333M66G10, 1781M52P01,

1781M53G01, 1854M95P01, 1854M95P02,

1854M95P03, 1854M95P04, 1854M95P05,

1854M95P06, 1854M95P07, 1854M95P08,

9380M28P05.

CF6-80E1 Series Engines … 1669M22G01, 1669M22G03, 1782M22G01,

1782M22G02, 1782M22G04.

These engines are installed on, but not limited to, Airbus A300, A310, and A330 series, Boeing 747 and 767 series, and McDonnell Douglas DC-10 and MD-11 series airplanes.

Note 1: This AD applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (p) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.

Compliance

Compliance

Compliance with this AD is required as indicated, unless already done.

To detect cracks, which can cause separation of the HPCR stage 3-9 spool and possible uncontained engine failure, do the following:

CF6-50 16-inch billet spools

(a) For CF6 HPCR stage 3-9 spool, part numbers (P/N's) 9136M89G02, 9136M89G06, 9253M85G02, 9273M14G01, 9331M29G01, and for P/N 9136M89G08 with serial numbers (SN's) listed in the following Table 2, do the following:

CF6-50 16-inch billet spools

Table 2

MPOE3486 MPOE3487 MPOE3488 MPOE3489 MPOE3490 MPOE3491 MPOE3492

MPOG3832 MPOG3833 MPOG3834 MPOG3835 MPOG3836 MPOG3837 MPOG3838

MPOG3839 MPOG3840 MPOG3841 MPOG3842 MPOG3843 MPOG3844 MPOG3845

MPOG3846 MPOG3847 MPOG3848 MPOG3850 MPOG3851 MPOG5228 MPOG5230

MPOG5231 MPOG5232 MPOG6727 MPOG6728 MPOG6729 MPOG6730 MPOG6731

MPOG6732 MPOG6733 MPOG6735 MPOG6736 MPOG6738 MPOG6739 MPOG6740

MPOG6741 MPOG6742 MPOG6743 MPOG6744 MPOG6745 MPOG6746 MPOG7713

MPOG7714 MPOG7715 MPOG7716 MPOG7717 MPOG7718 MPOG7719 MPOG7720

MPOG7721 MPOG7722 MPOG7723 MPOG7724 MPOG7725 MPOG7726 MPOG7727

MPOG7728 MPOG7729 MPOG7730 MPOG7731 MPOG7732 MPOG7733 MPOG7734

MPOG7735 MPOG7736 MPOG7737 MPOG7738 MPOG7739 MPOG7740 MPOG7741

MPOG7742 MPOG7743 MPOG7744 MPOG7819 MPOG7820 MPOG7821 MPOG7822

MPOG7823 MPOG7824 MPOG7825 MPOG7826 MPOG7827 MPOG7828 MPOG7829

MPOG7830 MPOG7831 MPOG7832 MPOG7833 MPOG7834 MPOG7835 MPOG7836

MPOG7837 MPOG7838 MPOG7839 MPOG8822 MPOG8823 MPOG8824 MPOG8825

MPOG8826 MPOG8827 MPOG8828 MPOG8829 MPOG8830 MPOG8831 MPOG8832

MPOG8833 MPOG8834 MPOG8835 MPOG8836 MPOG8837 MPOG9185 MPOG9186

MPOH0289 MPOH0290 MPOH0291

MPOH0292 MPOH0293 MPOH0294 MPOH0295

MPOH0296 MPOH0297 MPOH0298 MPOH0299 MPOH0300 MPOH0301 MPOH0302

MPOH0303 MPOH0304 MPOH0305 MPOH1805 MPOH2040 MPOH2041 MPOH2042

MPOH2043 MPOH2044 MPOH2045 MPOH2046 MPOH2047 MPOH2048 MPOH2049

MPOH2050 MPOH2051 MPOH2052 MPOH2053 MPOH2054 MPOH2055 MPOH2056

MPOH2057 MPOH2058 MPOH2059 MPOH2060 MPOH2061 MPOH2062 MPOH2829

MPOH2830 MPOH2831 MPOH2832 MPOH2833 MPOH2834 MPOH2835 MPOH2836

MPOH2837 MPOH2838 MPOH2839 MPOH2840 MPOH2841 MPOH2842 MPOH2843

MPOH2844 MPOH2845 MPOH2846 MPOH2847 MPOH2848 MPOH2849 MPOH2850

MPOH2851 MPOH2852 MPOH2853 MPOH2854 MPOH2855 MPOH2856 MPOH2857

MPOH2858 MPOH4307 MPOH4308 MPOH4309 MPOH4310 MPOH4311 MPOH4312

MPOH4313 MPOH5277 MPOH5278 MPOH5279 MPOH5280 MPOH5281 MPOH5282

MPOH5283 MPOH5520 MPOH5530 MPOH5531 MPOH5532 MPOH5533 MPOH5534

MPOH5535 MPOH5536 MPOH5537 MPOH5538 MPOH5539 MPOH5540 MPOH5541

MPOH5542 MPOH5543 MPOH5544 MPOH5545 MPOH5546 MPOH5547 MPOH5548

MPOH5549 MPOH5550 MPOH5551 MPOH5552 MPOH5553 MPOH5554 MPOH7020

MPOH7021 MPOH7022 MPOH7023 MPOH7024 MPOH7025 MPOH7026 MPOH7027

MPOH7028 MPOH7030 MPOH7960 MPOH7965 MPOH7966 MPOH7967

MPOH7968

MPOH7969 MPOH7970 MPOH7971 MPOH7972 MPOH7973 MPOH7974 MPOH7975

MPOH8638 MPOH8639 MPOH8640 MPOH8641 MPOH8642 MPOH8643 MPOH8644

MPOH8645 MPOH8646 MPOH8647 MPOH8648 MPOH8649 MPOH8650 MPOH8651

MPOH8652 MPOH8653 MPOH8654 MPOH8655 MPOH8656 MPOH8657 MPOH8658

MPOH8659 MPOH8677 MPOH8678 MPOH8679 MPOH8680 MPOH8682 MPOH8683

MPOH8684 MPOJ1796 MPOJ1797 MPOJ1798 MPOJ1799 MPOJ1800 MPOJ1801

MPOJ1803 MPOJ1804 MPOJ1806 MPOJ1930 MPOJ1931 MPOJ1932 MPOJ1933

MPOJ1934 MPOJ1935 MPOJ1936 MPOJ1938 MPOJ1939 MPOJ1940 MPOJ1941

MPOJ1942 MPOJ1943 MPOJ1944 MPOJ1945 MPOJ1946 MPOJ1947 MPOJ1948

MPOJ1949 MPOJ1950 MPOJ1951 MPOJ1953 MPOJ1954 MPOJ1955 MPOJ1956

MPOJ1957 MPOJ1958 MPOJ2420 MPOJ2421 MPOJ2422 MPOJ2423 MPOJ2424

MPOJ2425 MPOJ2426 MPOJ2427 MPOJ2428 MPOJ2429 MPOJ2430 MPOJ2431

MPOJ2432 MPOJ2433 MPOJ2434 MPOJ2435 MPOJ2436 MPOJ2437 MPOJ2438

MPOJ2439 MPOJ2440 MPOJ2441 MPOJ2442 MPOJ2443 MPOJ2444 MPOJ2445

MPOJ2446 MPOJ2447 MPOJ2448 MPOJ2449 MPOJ2450 MPOJ4173 MPOJ4174

MPOJ5185 MPOJ5186 MPOJ6035 MPOJ6036 MPOJ6039 MPOJ6040 MPOJ6041

MPOJ6042 MPOJ6043 MPOJ6044 MPOJ6045 MPOJ6046 MPOJ6047 MPOJ6048

MPOJ6049 MPOJ6050

MPOJ6051 MPOJ6052 MPOJ6053 MPOJ6054 MPOJ6055

MPOJ6056 MPOJ6057 MPOJ6058 MPOJ6059 MPOJ6060 MPOJ6061 MPOJ6062

MPOJ6063 MPOJ6064 MPOJ6065 MPOJ6066 MPOJ6067 MPOJ6068 MPOJ6500

MPOJ6501 MPOJ6502 MPOJ6503 MPOJ6505 MPOJ6506 MPOJ6507 MPOJ6508

MPOJ6509 MPOJ6510 MPOJ6511 MPOJ6512 MPOJ6513 MPOJ6514 MPOJ6515

MPOJ6516 MPOJ6517 MPOJ7632 MPOJ7633 MPOJ7634 MPOJ7635 MPOJ7636

MPOJ7637 MPOJ7638 MPOJ7639 MPOJ7640 MPOJ7641 MPOJ7642 MPOJ7643

MPOJ8046 MPOJ8047 MPOJ8048 MPOJ8049 MPOJ8050 MPOJ8051 MPOJ9308

MPOJ9309 MPOJ9310 MPOJ9311 MPOJ9312 MPOJ9313 MPOJ9314 MPOJ9315

MPOK1233 MPOK1234 MPOK1235 MPOK1236 MPOK1237 MPOK1238 MPOK1239

MPOK1240 MPOK1824 MPOK1825 MPOK1826 MPOK1827 MPOK1828 MPOK1829

MPOK1830 MPOK1831 MPOK1832 MPOK2694 MPOK2695 MPOK3067 MPOK3068

MPOK3069 MPOK3070 MPOK3071 MPOK4659 MPOK4660 MPOK4661 MPOK4662

MPOK4663 MPOK4664 MPOK4665 MPOK4666 MPOK4667 MPOK5082 MPOK5083

MPOK5084 MPOK5085 MPOK5086 MPOK5087 MPOK5088 MPOK5520 MPOK5521

MPOK5522 MPOK5955 MPOK5956 MPOK5957 MPOK5958 MPOK5959 MPOK5960

MPOK5961 MPOK5962 MPOK5963 MPOK5964 MPOK6247 MPOK6248 MPOK6249

MPOK6250 MPOK6251 MPOK6252 MPOK6253 MPOK6254

MPOK6255 MPOK6256

MPOK6257 MPOK6715 MPOK6716 MPOK6823 MPOK6824 MPOK6825 MPOK6826

MPOK6827 MPOK6828 MPOK6829 MPOK6830 MPOK6831 MPOK7226 MPOK7227

MPOK7228 MPOK7229 MPOK7230 MPOK7231 MPOK7232 MPOK7233 MPOK7234

MPOM2128 MPOM2129 MPOM2130 MPOM2131 MPOM2132 MPOM2133 MPOM2134

MPOM2135 MPOM2136 MPOM2137 MPOM2138 MPOM2357 MPOM2358 MPOM2359

MPOM2360 MPOM2361 MPOM2362 MPOM2363 MPOM2364 MPOM2365 MPOM2366

MPOM2461 MPOM2462 MPOM5521 MPOM5522 MPOM5523 MPOM5524 MPOM5525

MPOM5526 MPOM5527 MPOM5528 MPOM5529 MPOM5530 MPOM5531 MPOM5532

MPOM5533 MPOM5534 MPOM5535 MPOM5536 MPOM5537 MPOM6151 MPOM6152

MPOM6153 MPOM6154 MPOM6155 MPOM6156 MPOM6157 MPOM6158 MPOM6159

MPOM6160 MPOM6161 MPOM6162 MPOM7087 MPOM7088 MPOM7089 MPOM7091

MPOM7092 MPOM7093 MPOM7094 MPOM7095 MPOM7096 MPOM7097 MPOM7098

MPOM7099 MPOM7100 MPOM7101 MPOM7102 MPOM7103 MPOM7104 MPOM7105

MPOM7106 MPOM7107 MPOM7108 MPOM7109 MPOM8297 MPOM8298 MPOM8299

MPOM8300 MPOM8301 MPOM8302 MPOM9246 MPOM9257 MPOM9258 MPOM9259

MPOM9260 MPOM9261 MPOM9262 MPOM9265 MPOM9721 MPOM9722 MPOM9723

MPON0051 MPON0052 MPON0053 MPON0055 MPON0056 MPON0057 MPON0058

MPON0059

MPON0060 MPON0061 MPON0062 MPON0063 MPON0064 MPON0065

MPON0066 MPON0067 MPON0068 MPON0069 MPON0073 MPON0074 MPON0075

MPON0076 MPON1077 MPON1078 MPON1079 MPON1080 MPON1081 MPON1082

MPON1084 MPON1085 MPON1086 MPON1087 MPON1088 MPON1089 MPON1090

MPON1091 MPON1092 MPON1093 MPON1094 MPON1095 MPON1096 MPON1097

MPON1098 MPON1099 MPON1100 MPON1642 MPON4250 MPON4252 MPON4254

MPON4255 MPON4256

Initial Inspection

Initial Inspection

(1) If the spool has not already been inspected using one of the alert service bulletins (ASB's) or service bulletins (SB's) listed in Column A of the following Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with alert service bulletin (ASB) CF6-50 72-A1108, Revision 4, dated June 6, 2001, and the following compliance times:

Table 3

CF6-50 SB No. Procedures (70-32-XX) in standard practices manual GEK9250

Column A Column B Column C Column D Column E

SB 72-888, Revision 3, dated 70-32-09, Revision 70-32-10, Revision 70-32-13, 70--32-14, TR, 70-

January 31, 1991. 71, dated October 71, dated October Temporary 26, dated August

1, 1995. 1, 1995. Revision (TR), 70- 26, 1996.

25, dated August

26, 1996.

SB 72-888, Revision 4, dated 70-32-09, Revision 70-32-10, Revision 70-32-13, Revision 70-32-14, Revision

March 28, 1991. 72, dated 72, dated 72, dated 72, dated

November 15, 1996. November 15, 1996. November 15, 1996. November 15,

1996.

SB 72-888, Revision 5, dated 70-32-09, Revision 70-32-10, Revision 70-32-13, Revision 70-32-14, Revision

November 7, 1994. 74, dated May 1, 74, dated May 1, 73, dated 73, dated

1998. 1998. November 1, 1997. November 1, 1997.

SB 72-888, Revision 6, dated … 70-32-10, Revision 70-32-13, Revision 70-32-14, Revision

December 22, 1995. 75, dated 75, dated 75, dated

December 15, 1998. December 15, 1998. December 15,

1998.

SB 72-1000, Original, dated … … 70-32-13, TR 70- 70-32-14, TR 70-42

December 14, 1990. 41, dated dated February

February 10, 1999. 10, 1999.

SB 72-1000, Revision 1, dated … … 70-32-13, Revision 70-32-14, Revision

March 28, 1991. 76, dated May 15, 76, dated May 15,

1999. 1999.

SB 72-1000, Revision 2, dated … … 70-32-17, TR 70- 70-32-18, TR 70-

September 9, 1993. 39, dated 40, dated

December 15, 1998. December 15,

1998.

SB 72-1000, Revision 3, dated … … 70-32-17, Revision 70-32-18, Revision

December 22, 1995. 76, dated May 15, 76, dated May 15,

1999. 1999.

SB 72-1108, Original, dated … … 70-32-17, TR 70- 70-32-18, TR 70-

November 6, 1995. 47, dated October 48, dated October

28, 1999. 28, 1999.

SB 72-1108, Revision 1, dated … … … …

July 29, 1996.

ASB 72-A1108, Revision 2, dated … … … …

October 28, 1999.

ASB 72-A1108, Revision 3, dated … … … …

November 12, 1999.

ASB 72-A1108, Revision 4, dated … … … …

June 6, 2001.

(i) For spools with greater than 3,500 cycles-since-new (CSN) on the effective date of this AD, inspect before further flight.

(ii) For spools with 3,500 or fewer CSN, on the effective date of this AD, inspect at the first piece-part exposure (PPE) after 1,000 CSN or by 3,500 CSN, whichever occurs earlier.

(2) For spools that have not been inspected in accordance with the requirements of ASB CF6-50 72-A1131, Revision 3, dated June 6, 2001, or an earlier revision of ASB 72-A1131 or SB 72-1131, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, at the first PPE after 1,000 CSN, but not later than 4,000 additional cycles in-service (CIS) after the effective date of this AD.

(3) For spools that have not been inspected in accordance with the requirements of ASB CF6-50 72-A1157, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A1157, inspect the stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB 72-A1157, Revision 3 dated January 31, 2002, at the earliest of:

(i) The first PPE after 1000 CSN, or

(ii) The first HPC rotor exposure after 1000 CSN, or

(iii) The next required inspection to ASB72-A1108, Revision 4, dated June 6, 2001.

Repetitive Inspection

Repetitive Inspection

(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB 72-A1108, Revision 4, dated June 6, 2001, and the stage 3-5 dovetail slot bottoms in accordance with ASB 72-A1157, Revision 3, dated January 31, 2002, at the earliest of:

(i) Each PPE with more than 1,000 cycles-since-last-inspection (CSLI) and 3,500 CSN, or

(ii) From July 29, 2001 through January 27, 2003, before the cycle limits of Table 4.

Table 4

CSN at last inspection Reinspect by

(A) 6,000 or fewer CSN … 3,500 CSLI

(B) 6,001 to 7,000 CSN … 9,500 CSN

(C) 7,001 to 8,000 CSN … 2,500 CSLI

(D) 8,001 to 8,500 CSN … 10,500 CSN

(E) 8,501 or more CSN … 2,000 CSLI

(iii) After January 27, 2003, before the cycle limits of Table 5.

Table 5

CSN at last inspection Reinspect by

(A) 5,000 or fewer CSN … 3,500 CSLI

(B) 5,001 to 5,500 CSN … 8,500 CSN

(C) 5,501 to 6,500 CSN … 3,000 CSLI

(D) 6,501 to 7,000 CSN … 9,500 CSN

(E) 7,001 to 8,000 CSN … 2,500 CSLI

(F) 8,001 to 8,500 CSN … 10,500 CSN

(G) 8,501 or more CSN … 2,000 CSLI

(5) If inspection findings equal or exceed the reject limits established by ASB 72-A1108, Revision 4, dated June 6, 2001, or ASB 72-A1131, Revision 3, dated June 6, 2001, or ASB 72-A1157, Revision 3, dated January 31, 2002; replace spool before further flight.

CF6-50 13-inch billet spools

CF6-50 13-inch billet spools

(b) For CF6 HPC Rotor Stage 3-9 Spool, P/N's 9136M89G03, 9136M89G07, 9136M89G09, 9136M89G17, 9136M89G18, 9253M85G01, and 9136M89G08 with serial numbers that are not listed in Table 2, do the following:

Initial Inspection

(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A1108, Revision 4, dated June 6, 2001 before further flight.

Initial Inspection

(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A1108, Revision 4, dated June 6, 2001, by the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first engine shop visit (ESV) after 4,000 CSN, or

(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 4,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, or an earlier revision of ASB 72-A1131, or SB 72-1131, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, by the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

(4) For spools that have not been inspected in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A1157, inspect the stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, by the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

Repetitive Inspection

Repetitive Inspection

(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB 72-A1108, Revision 4, dated June 6, 2001, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 4,000 CSN, or

(ii) Each ESV with more than 2,000 CSLI and 4,000 CSN, or

(iii) Before 4,000 CSLI.

(6) If inspection findings equal or exceed the reject limits established by ASB 72-A1108, Revision 4, dated June 6, 2001; or ASB 72-A1131, Revision 3, dated June 6, 2001; or ASB 72-A1157, Revision 3, dated January 31, 2002; replace spool before further flight.

CF6-50 9&10-inch billet spools

CF6-50 9&10-inch billet spools

(c) For CF6 HPCR stage 3-9 spool, P/N's 9136M89G19, 9136M89G21, 9136M89G22 and 9136M89G27, do the following:

Initial Inspection

(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect the hub and bore in accordance with ASB CF6-50 72-A1108, Revision 4, dated June 6, 2001 before further flight.

Initial Inspection

(2) If the spool has 7,000 or fewer CSN on the effective date of this AD, and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect the hub and bore in accordance with ASB CF6-50 72-A1108, Revision 4, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 3,000 CSN, or

(iii) From July 29, 2001 through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, or an earlier revision of ASB 72-A1131, or SB 72-1131, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

(4) For spools that have not been inspected in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A1157, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

Repetitive Inspection

Repetitive Inspection

(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, reinspect the hub and bore in accordance with the requirements of ASB 72-A1108, Revision 4, dated June 6, 2001, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or

(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of the following Table 6, or:

Table 6

CSN at last inspection Reinspect by

(A) 3,500 or fewer CSN … 7,000 CSN

(B) 3,501 to 6,000 CSN … 3,500 CSLI

(C) 6,001 to 7,000 CSN … 9,500 CSN

(D) 7,001 to 8,000 CSN … 2,500 CSLI

(E) 8,001 to 8,500 CSN … 10,500 CSN

(F) 8,501 or more CSN … 2,000 CSLI

(iii) After January 27, 2003, before the cycle limits of Table 5.

(6) If inspection findings equal or exceed the reject limits established by ASB 72-A1108, Revision 4, dated June 6, 2001; or ASB 72-A1131, Revision 3, dated June 6, 2001; or ASB 72-A1157, Revision 3, dated January 31, 2002; replace spool before further flight.

(7) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 9136M89G19, 9136M89G21, 9136M89G22 and 9136M89G27, installed where the spool has 10,500 or more CSN.

CF6-508-inch billet 2-piece spools

CF6-508-inch billet 2-piece spools

(d) For CF6 HPCR stage 3-9 spool, P/N 9136M89G29, do the following:

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A1108, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, or an earlier revision of ASB 72-A1131, or SB 72-1131, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A1131, Revision 3, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A1157, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A1157, Revision 3, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(4) If inspection findings equal or exceed the reject limits established by ASB 72-A1108, Revision 4, dated June 6, 2001; or ASB 72-A1131, Revision 3, dated June 6, 2001; or ASB 72-A1157, Revision 3, dated January 31, 2002; replace spool before further flight.

CF6-80A 16-inch billet spools

CF6-80A 16-inch billet spools

(e) For CF6 HPCR stage 3-9 spool, P/N's 9136M89G10 with SN's MPOM0054, MPOM7090, MPOM8303, MPOM8304, MPOM9263, MPOM9264, MPON0054, MPON0071, MPON0072, MPON1643, MPON4251, or MPON4253, do the following:

Initial Inspection

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 7; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB 72 A0678, Revision 4, dated June 6, 2001, and the following compliance times:

Initial Inspection

Table 7

CF6-80A SB No. Procedures (70-32-XX) in standard practices manual GEK9250

Column A Column B Column C Column D Column E

SB 72-500, Revision 3, dated 70-32-09, Revision 71, dated 70-32-10, Revision 71, dated 70-32-13, Temporary Revision 70-32-14, TR 70-26, dated

March 19, 1991 October 1, 1995 October 1, 1995 (TR), 70-25, dated August August 26, 1996

SB 72-500, Revision 3, dated 70-32-09, Revision 71, dated 70-32-10, Revision 71, dated 70-32-13, Temporary Revision 70-32-14, TR 70-26, dated

26, 1996 SB 72-500, Revision 4, dated 70-32-09, Revision 72, dated 70-32-10, Revision 72, dated 70-32-13, Revision 72, dated 70-32-14, Revision 72, dated

July 1, 1991 November 15, 1996 November 15, 1996 November 15, 1996 November 15, 1996

SB 72-500, Revision 5, dated 70-32-09, Revision 74, dated 70-32-10, Revision 74, dated 70-32-13, Revision 73, dated 70-32-14, Revision 73, dated

SB 72-500, Revision 5, dated 70-32-09, Revision 74, dated 70-32-10, Revision 74, dated 70-32-13, Revision 73, dated 70-32-14, Revision 73, dated

November 7, 1994 May 1, 1998 May 1, 1998 November 1, 1997 November 1, 1997

SB 72-500, Revision 6, dated … 70-32-10, Revision 75, dated 70-32-13, Revision 75, dated 70-32-14, Revision 75, dated

December 22, 1995 December 15, 1998 December 15, 1998 December 15, 1998

SB 72-583, Original, dated … … 70-32-13, TR 70-41, dated 70-32-14, TR 70-42, dated

December 20, 1990 February 10, 1999 February 10, 1999

SB 72-583, Revision 1, dated … … 70-32-13, Revision 76, dated 70-32-14, Revision 76, dated

March 18, 1991 May 15, 1999 May 15, 1999

SB 72-583, Revision 2, dated … … 70-32-17, TR 70-39, dated 70-32-18, TR 70-40, dated

July 15, 1991 December 15, 1998 December 15, 1998

SB 72-583, Revision 3, dated … … 70-32-17, Revision 76, dated 70-32-18, Revision 76, dated

July 24, 1991 May 15, 1999 May 15, 1999

SB 72-583, Revision 4, dated … … 70-32-17, TR 70-47, dated 70-32-18, TR 70-48, dated

September 15, 1993 October 28, 1999 October 28, 1999

SB 72-583, Revision 5, dated December 22, 1995 SB 72-678, Original, dated November 6, 1995 SB 72-678, Revision 1, dated July 29, 1996 ASB 72-A678, Revision 2, dated October 28, 1999 ASB 72-A678, Revision 3, dated November 12, 1999 ASB 72-A0678, Revision 4, dated June 6, 2001

(i) For spools with greater than 3,500 CSN on the effective date of this AD, inspect before further flight.

(ii) For spools with 3,500 or fewer CSN on the effective date of this AD, inspect at the first PPE after 1,000 CSN or within 3,500 CSN, whichever occurs earlier.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, or an earlier revision of ASB 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS accumulated after the effective date of this AD.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, or an earlier revision of ASB 72-A0719, inspect thestage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first HPCR exposure after 1,000 CSN, or

(iii) The next required inspection to ASB 72-A0678, Revision 4, dated June 6, 2001.

Repetitive Inspections

Repetitive Inspections

(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB 72-A0678, Revision 4, dated June 6, 2001; and the dovetail slot bottoms in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or

(ii) From July 29, 2001 through January 27, 2003 before the cycle limits of Table 4, or

(iii) After January 27, 2003, before the cycle limits of Table 5.

(5) If inspection findings equal or exceed the reject limits established by ASB 72-A0678, Revision 4, dated June 6, 2001; or ASB 72-A0691, Revision 4, dated June 6, 2001; or ASB A0719, Revision 4, dated January 31, 2002; replace spool before further flight.

(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool P/N 9136M89G10 with serial numbers (SN's) MPOM0054, MPOM7090, MPOM8303, MPOM8304, MPOM9263, MPOM9264, MPON0054, MPON0071, MPON0072, MPON1643, MPON4251, or MPON4253, installed where the spool has 10,500 or more CSN.

CF6-80A 13-inch billet spools

CF6-80A 13-inch billet spools

(f) For all other CF6 HPCR stage 3-9 spools, P/N 9136M89G10, with SN's that are not listed in paragraph (e) of this AD, and P/N 9136M89G11, do the following:

Initial Inspection

(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001 before further flight.

Initial Inspection

(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 5,000 CSN or

(iii) From July 29, 2001, through January 27, 2003 before 7,000 CSN, and after January 27, 2003, before 5,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, or an earlier revision of ASB 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

(4) For spools that have not been inspected in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, or an earlier revision of ASB 72-A0719 inspect the dovetail slot bottom in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

Repetitive Inspection

Repetitive Inspection

(5) Spools installed in CF6-80A1 and CF6-80A3 engines that were inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with alert ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or

(ii) Each ESV with more than 2,000 CSLI and 5,000 CSN, or

(iii) Within 4,000 CSLI and more than 5,000 CSN.

(6) Spools installed in CF6-80A and CF6-80A2 engines previously inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or

(ii) Each ESV with more than 1,500 CSLI and 5,000 CSN, or

(iii) Within 4,000 CSLI and more than 5,000 CSN.

(7) If inspection findings equal or exceed the reject limits established by ASB 72-A0678, Revision 4, dated June 6, 2001; or ASB 72-A0691, Revision 4, dated June 6, 2001; or ASB A0719, Revision 4, dated January 31, 2002; replace spool before further flight.

CF6-80A 9 and 10-inch billet spools

CF6-80A 9 and 10-inch billet spools

(g) For CF6 HPCR stage 3-9 spools, P/N's 9136M89G20, 9136M89G21, 9136M89G22 and 9136M89G27, do the following:

Initial Inspection

(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001 before further flight.

Initial Inspection

(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 3,000 CSN or

(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 5,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, or an earlier revision of ASB 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

(4) For spools that have not been inspected in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, or an earlier revision of ASB 72-A0719 inspect the dovetail slot bottom in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

Repetitive Inspection

Repetitive Inspection

(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 72-A0678, Revision 4, dated June 6, 2001, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or

(ii) From July 29, 2001 through January 27, 2003, before the cycle limits of Table 6.

(iii) After January 27, 2003, before the cycle limits of the following Table 8:

Table 8

CSN at last inspection Reinspect by

(A) 1,500 or fewer CSN … 5,000 CSN

(B) 1,501 to 5,000 CSN … 3,500 CSLI

(C) 5,001 to 5,500 CSN … 8,500 CSN

(D) 5,501 to 6,501 CSN … 3,000 CSLI

(E) 6,501 to 7,000 CSN … 9,500 CSN

(F) 7,001 to 8,000 CSN … 2,500 CSLI

(G) 8,001 to 8,500 CSN … 10,500 CSN

(H) 8,501 or more CSN … 2,000 CSLI

(6) If inspection findings equal or exceed the reject limits established by ASB 72-A0678, Revision 4, dated June 6, 2001; or ASB 72-A0691, Revision 4, dated June 6, 2001; or ASB A0719, Revision 4, dated January 31, 2002; replace spool before further flight.

(7) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 9136M89G20, 9136M89G21, 9136M89G22 and 9136M89G27, installed where the spool has 10,500 or more CSN.

CF6-80A 8-Inch Billet 2-Piece Spools

CF6-80A 8-Inch Billet 2-Piece Spools

(h) For CF6 HPCR stage 3-9 spool, P/N 9136M89G28, do the following:

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB 72-A0678, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, or an earlier revision of ASB 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0691, Revision 4, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, or an earlier revision of ASB 72-A0719 inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A0719, Revision 4, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(4) If inspection findings equal or exceed the reject limits established by ASB 72-A0678, Revision 4, dated June 6, 2001; or ASB 72-A0691, Revision 4, dated June 6, 2001; or ASB 72-A0719, Revision 4, dated January 31, 2002; replace spool before further flight.

CF6-80C2 13-inch billet spools

CF6-80C2 13-inch billet spools

(i) For CF6 HPCR stage 3-9 spool, P/N's 1781M52P01, 1854M95P02, 1854M95P05 and 9380M28P05, do the following:

Initial Inspection

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB 72-A0812, Revision 3, dated June 6, 2001, and the following compliance times:

Initial Inspection

Table 9

CF6-80C2 SB No. Procedures (70-32-XX) in standard practices manual GEK9250

Column A Column B Column C Column D Column E

SB 72-418, Revision 2, May 70-32-09, Revision 71, dated 70-32-10, Revision 71, dated 70-32-13, Temporary Revision 70-32-14, TR 70-26, dated

14, 1991 October 1, 1995 October 1, 1995 (TR), 70-25, dated August August 26, 1996

26, 1996

SB 72-418, Revision 3, 70-32-09, Revision 72, dated 70-32-10, Revision 72, dated 70-32-13, Revision 72, dated 70-32-14, Revision 72, dated

November 7, 1994 November 15, 1996 November 15, 1996 November 15, 1996 November 15, 1996

SB 72-418, Revision 4, 70-32-09, Revision 74, dated 70-32-10, Revision 74, dated 70-32-13, Revision 73, dated 70-32-14, Revision 73, dated

December 22, 1995 May 1, 1998 May 1, 1998 November 1, 1997 November 1, 1997

SB 72-758, Original, dated … 70-32-10, Revision 75, dated 70-32-13, Revision 75, dated 70-32-14, Revision 75, dated

November 7, 1994 December 15, 1998 December 15, 1998 December 15, 1998

SB 72-758, Revision 1, dated … … 70-32-13, TR 70-41, dated 70-32-14, TR 70-42, dated

December 22, 1995 February 10, 1999 February 10, 1999

SB 72-812, Original, dated … … 70-32-13, Revision 76, dated 70-32-14, Revision 76, dated

November 6, 1995 May 15, 1999 May 15, 1999

SB 72-812, Revision 1, dated … … 70-32-17, TR 70-39, dated 70-32-18, TR 70-40, dated

January 30, 1998 December 15, 1998 December 15, 1998

ASB 72-A0812, Revision 2, … … 70-32-17, Revision 76, dated 70-32-18, Revision 76, dated

dated October 28, 1999 May 15, 1999 May 15, 1999

ASB 72-A0812, Revision 3, … … 70-32-17, TR 70-47, dated 70-32-18, TR 70-48, dated

dated June 6, 2001 October 28, 1999 October 28, 1999

(i) For spools with greater than 3,500 CSN on the effective date of this AD, inspect before further flight.

(ii) For spools with 3,500 or fewer CSN on the effective date of this AD, inspect at the first PPE after 1,000 CSN or before 3,500 CSN, whichever occurs earlier.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A0848, Revision 7, dated June 6, 2001, or an earlier revision of ASB 72-A0848, or SB 72-0848, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0848, Revision 7, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1000 CSN, or

(ii) The next required inspection to ASB 72-A0812, Revision 3, dated June 6, 2001, or

(iii) From July 29, 2001 through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first HPCR exposure after 1,000 CSN, or

(iii) The next required inspection to ASB 72-A0812, Revision 3, dated June 6, 2001

Repetitive Inspection

Repetitive Inspection

(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect the hub and bore in accordance with ASB 72-A812, Revision 3, dated June 6, 2001, the web and hub-to-web transition areas in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, and the stage 3-5 dovetail slot bottoms in accordance with ASB 72-A0934 Revision 3, dated January 31, 2002, at the earliest of:

(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or

(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 4.

(iii) After January 27, 2003, before the cycle limits of Table 5.

(5) If inspection findings equal or exceed the reject limits established by ASB 72-A0812, Revision 3, dated June 6, 2001, or ASB 72-A0848, Revision 7, dated June 6, 2001, or ASB 72-A0934, Revision 3, dated January 31, 2002; replace spool before further flight.

(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1781M52P01, 1854M95P02, 1854M95P05 and 9380M28P05, installed where the spool has 10,500 or more CSN.

CF6-80C2 9&10-inch billet spools

(j) For CF6 HPCR stage 3-9 spool, P/Ns 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 1781M53G01, 1854M95P01, 1854M95P03, 1854M95P04, 1854M95P06 and 1854M95P07, do the following:

Initial Inspection

Initial Inspection

(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, and if the spool has not been inspected in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, or an earlier revision of ASB 72-A0848, or SB 72-0848, inspect the hub and bore in accordance with ASB CF6-50 72-A0812, Revision 3, dated June 6, 2001; and the web and hub-to-web transition areas in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, before further flight.

(2) If the spool has 7,000 or fewer CSN on the effective date of this AD, and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, and if the spool has not been inspected in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, or an earlier revision of ASB 72-A0848, or SB 72-0848, inspect the hub and bore in accordance with ASB CF6-50 72-A0812, Revision 3, dated June 6, 2001; and the web and hub-to-web transition areas in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 3,000 CSN, or

(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) Within 4,000 additional CIS after the effective date of this AD.

Repetitive Inspection

Repetitive Inspection

(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect the hub and bore in accordance with the requirements of ASB 72-A0812, Revision 3, dated June 6, 2001, and the web and hub-to-web transition areas in accordance with ASB 72-A0848, Revision 7, dated June 6, 2001, at the earlier of:

(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or

(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 6, and after January 27, 2003, before the cycle limits of Table 5.

(5) If inspection findings equal or exceed the reject limits established by ASB 72-A0812, Revision 3, dated June 6, 2001, or ASB 72-A0848, Revision 7, dated June 6, 2001, or ASB 72-A0934, Revision 3, dated January 31, 2002; replace spool before further flight.

(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 1781M53G01, 1854M95P01, 1854M95P03, 1854M95P04, 1854M95P06 and 1854M95P07, installed where the spool has 10,500 or more CSN.

CF6-80C2 8-inch billet 2-piece spools

CF6-80C2 8-inch billet 2-piece spools

(k) For CF6 HPCR stage 3-9 spool, P/N's 1333M66G10 and 1854M95P08, do the following:

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB 72-A0812, Revision 3, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A0848, Revision 7, dated June 6, 2001, or an earlier revision of ASB 72-A0848, or SB 72-0848, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB 72-A0848, Revision 7, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB 72-A0934, Revision 3, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(4) If inspection findings equal or exceed the reject limits established by ASB 72-A0812, Revision 3, dated June 6, 2001, or ASB 72-A0848, Revision 7, dated June 6, 2001, or ASB 72-A0934, Revision 3, dated January 31, 2002; replace spool before further flight.

CF6-80E1 9&10-inch billet spools

CF6-80E1 9&10-inch billet spools

(1) For CF6 HPCR stage 3-9 spool, P/N's 1669M22G01, 1669M22G03, 1782M22G01 and 1782M22G02, do the following:

Initial Inspection

(1) If the spool has greater than 7,000 CSN and has not already been inspected using one of the ASB's listed in Column A of the following Table 10; OR a combination AND of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, and if the spool has not been inspected in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the hub and bore in accordance with ASB CF6-50 72-A0135, Revision 2, dated June 6, 2001; and the web and hub-to-web transition areas in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, before further flight.

Initial Inspection

Table 10

CF6-80E1 SB No. Procedures (70-32-XX) in standard practices manual GEK9250

Column A Column B Column C Column D Column E

ASB 72-A0135, dated August 70-32-09, Revision 71, dated 70-32-10, Revision 71, dated 70-32-13, Temporary Revision 70-32-14, TR 70-26, dated

13, 1998 October 1, 1995 October 1, 1995 (TR), 70-25, dated August August 26, 1996

26, 1996

ASB 72-A0135, Revision 1, 70-32-09, Revision 72, dated 70-32-10, Revision 72, dated 70-32-13, Revision 72, dated 70-32-14, Revision 72, dated

dated October 28, 1999 November 15, 1996 November 15, 1996 November 15, 1996 November 15, 1996

ASB 72-A0135, Revision 2, 70-32-09, Revision 74, dated 70-32-10, Revision 74, dated 70-32-13, Revision 73, dated 70-32-14, Revision 73, dated

dated June 6, 2001 May 1, 1998 May 1, 1998 November 1, 1997 November 1, 1997

… 70-32-10, Revision 75, dated 70-32-13, Revision 75, dated 70-32-14, Revision 75, dated

December 15, 1998 December 15, 1998 December 15, 1998

… … 70-32-13, TR 70-41, dated 70-32-14, TR 70-42, dated

February 10, 1999 February 10, 1999

… … 70-32-13, Revision 76, dated 70-32-14, Revision 76, dated

May 15, 1999 May 15, 1999

… … 70-32-17, TR 70-39, dated 70-32-18, TR 70-40, dated

December 15, 1998 December 15, 1998

… … 70-32-17, Revision 76, dated 70-32-18, Revision 76, dated

May 15, 1999 May 15, 1999

… … 70-32-17, TR 70-47, dated 70-32-18, TR 70-48, dated

October 28, 1999 October 28, 1999

(2) If the spool has 7,000 or fewer CSN and has not already been inspected using one of the ASB's listed in Column A of Table 10; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, and if the spool has not been inspected in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the hub and bore in accordance with ASB CF6-50 72-A0135, Revision 2, dated June 6, 2001; and the web and hub-to-web transition areas in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 3,000 CSN, or

(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.

(3) Spools not previously inspected in accordance with the requirements of ASB 72-A0137, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-0137, or SB 72-0137, inspect stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB 72-A0137, Revision 3, dated January 31, 2002, at the earliest of:

(i) The first PPE after 1,000 CSN, or

(ii) The first HPCR exposure after 1,000 CSN, or

(iii) The next required inspection to ASB 72-A0135, Revision 2, dated June 6, 2001.

Repetitive Inspection

Repetitive Inspection

(4) For spools that have already been inspected using one of the ASB's listed in Column A of Table 10; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect the hub and bore in accordance with the requirements of ASB 72-A0135, Revision 2, dated June 6, 2001, the web and hub-to-web transition areas in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, and the stage 3-5 dovetail slot bottoms in accordance with ASB 72-A0137, Revision 3, dated January 31, 2002, at the earlier of:

(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or

(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 6, and after January 27, 2003, before the cycle limits of Table 5.

(5) If inspection findings equal or exceed the reject limits established by ASB 72-A0135, Revision 2, dated June 6, 2001; ASB 72-A0126, Revision 5, dated June 6, 2001; and ASB 72-A0137, Revision 3, dated January 31, 2002; replace spool before further flight.

(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1669M22G01, 1669M22G03, 1782M22G01 and 1782M22G02, installed where the spool has 10,500 or more CSN.

CF6-80E1 8-inch billet 2-piece spools

(m) For CF6 HPCR stage 3-9 spool, P/N 1782M22G04, do the following:

CF6-80E1 8-inch billet 2-piece spools

(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB 72-A0135, Revision 2, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(2) For spools that have not been inspected in accordance with the requirements of ASB 72-A0126, Revision 5, dated June 6, 2001, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the web and hub-to-web transition areas in accordance with ASB 72-A0126, Revision 5, dated June 6, 2001, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(3) For spools that have not been inspected in accordance with the requirements of ASB 72-A0137, Revision 3, dated January 31, 2002, or an earlier revision of ASB 72-A0137, or SB 72-0137, inspect the stage 3-5 dovetail slot bottoms in accordance with ASB 72-A0137, Revision 3, dated January 31, 2002, at the earlier of:

(i) The first PPE after 1,000 CSN, or

(ii) The first ESV after 6,000 CSN.

(4) If inspection findings equal or exceed the reject limits established by ASB 72-A0135, Revision 2, dated June 6, 2001; ASB 72-A0126, Revision 5, dated June 6, 2001; and ASB 72-A0137, Revision 3, dated January 31, 2002; replace spool before further flight.

Reporting Requirements

Reporting Requirements

(n) Within five calendar days of inspection, report the results of inspections that equal or exceed the reject criteria to: Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive park, Burlington, MA 01803-5299; telephone (781) 238-7147. Reporting requirements have been approved by the Office of Management and Budget and assigned OMB control number 2120-0056. Be sure to include the following information:

(1) Part Number (2) Serial Number (3) Spool CSN (4) Spool CSLI (5) Date and location where inspection was done.

Definitions

Definitions

(o) For the purpose of this AD, the following definitions apply:

(1) A module level exposure is a separation of the fan module from the engine.

(2) An HPC rotor exposure is a HPC top or bottom case removal.

(3) A PPE is a disassembly and removal of the stage 3-9 spool from the HPCR structure, regardless of any blades, locking lugs, bolts or balance weights assembled to the spool.

(4) An ESV is the introduction of an engine into the shop where the separation of a major engine flange will occur after the effective date of this AD.

(5) The following maintenance actions, or any combination, are not considered ESV's for requiring repeat inspections:

(i) Introduction of an engine into a shop solely for removal of the compressor top or bottom case for airfoil maintenance.

(ii) Introduction of an engine into a shop solely for removal or replacement of the Stage 1 Fan Disk.

(iii) Introduction of an engine into a shop solely for replacement of the Turbine Rear Frame.

(iv) Introduction of an engine into a shop solely for replacement of the Accessory and/or Transfer Gearboxes.

(v) Introduction of an engine into a shop solely for replacement of the Fan Forward Case.

Alternative Methods of Compliance

(p) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office (ECO). Operators must submit their request through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, ECO.

Alternative Methods of Compliance

Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO.

Special Flight Permits

(q) Special flight permits may be issued in accordance with §§ 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be done.

Special Flight Permits

Issued in Burlington, Massachusetts, on June 5, 2002. Francis A. Favara, Acting Manager, Engine and Propeller Directorate, Aircraft Certification Service.