Radar Vectors
Civil Aeronautics Manual Historical Issued Nov 1, 1959 2 pages Copy saved Nov 21, 2026

CAM 60 Supplement No. 1; Military Jet Aircraft Two-Way Radio Failure Procedures

This document is historical. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

f5-47

Federal Aviation Agency

Washington, D.C.

Civil Aeronautics Manual 60

AIR TRAFFIC RULES

Supplement No. 1, CAM 60 dated July 1, 1959 November 1, 1959

SuBJEct: Military Jet Aircraft Two-Way Radio Failure Procedures

This supplement is issued to revise the policy on the holding procedure to be followed in the event of two-way radio failure by military jet aircraft. The material contained herein was published in the Federal Register on August 8, 1959 (24 F.R. 6388), effective August 8, 1959. Sections 60.49-1(b)(3) (ii) and 60.49–1(c)(3) (ii) currently require that when unable to maintain two-way radio communications, military jet aircraft inbound to an airport at which approved military jet penetration procedures have been established will execute a holding pattern along the left side of the initial penetration course or on the side on which the procedure turn has been prescribed. Actual operating experience has demonstrated that these provisions do not permit an operationally efficient transition from the holding pattern to the penetration phase of flight. Aceordingly, the Department of the Air Force has requested the Federal Aviation Ageney to amend these provisions by speçifying that the pilot of such military jet aircraft will utilize the holding procedures which will be depicted on the jet approach and landing chart for the particular airport of destination. Evaluation of this proposal indicates that it will promote air safety and it does not appear that there will be any adverse effects upon other airspace users. New material is enclosed in black brackets.

AIR TRAFFIC RULES

Remove the following page: Insert the following new page: 29 29

D.D. Thomas

D. D. THOMAS, Director, Bureau of Air Traffic Management. Attachment,

CAM 60 AIR TRAFFIC RULES 29

CAM 60 AIR TRAFFIC RULES 29

route altitude is 3,500 feet. The flight descends time or as soon as possible thereafter. A full back to 8,000 feet after passing the fix defining approved instrument approach procedure will the termination of the 10,000-foot minimum en be executed unless VFR conditions are encounroute altitude segment since the last assigned tered and the pilot elects to continue descent altitude (8,000 feet) is higher than the MEA and approach in accordance with VFR. (3,500 feet).

(2) If a clearance for an approach at the (3) If holding is necessary at the radio airport of intended landing has been received facility serving the destination airport and no and acknowledged, comply with the clearance or holding clearance has been received and ac- other instructions 1a and make normal descent knowledged: for landing. (ii) Where approved military jet pene- (3) Shuttle. tration procedures have been published for the (i) Descent to the appropriate altitude airport of destination, holding by military jet for the execution of the instrument approach on aircraft will be accomplished at the last assigned the radio facility serving the destination airport altitude or flight level in accordance with the will be accomplished by a holding pattern on the holding procedure depicted on the jet approach side of the final approach course on which the and landing chart for that airport. procedure turn is prescribed; or NotE: Detailed approach and landing procedures, (ii) Where approved military jet approved for military jet aircraft, are published in the penetration procedures

have been published for U. S. Air Force-U. S. Navy "Flight Information Publi- the airport of destination, military jet aircraft cation—-Terminal——High Altitude" by the Aeronautical will descend to initial penetration altitude or Chart and Information Center, St. Louis, Missouri. flight level while executing the holding pro- (c) Instrument letdown. cedure depicted on the jet approach and landing (1) If a clearance for an approach has not chart for that airport.] been received and acknowledged, descent from (Published in 22 F. R. 9046, Nov. 14, 1957, effective the altitude maintained to the radio facility Dee. 11, 1957; as amended in 22 F. R. 10304, Dec. 20, 1957, effective Dec. 20, 1957; amended in 24 F. R. 6388, serving the destination airport will start at the Aug. 8, 1959, effective Aug.

8, 1959.) expected approach time last received and acknowledged, or if no expected approach time "blind" transmissions on radio frequencies directly available or may " Air Traffic Control may issue approprlate Instructions by meana of was received and acknowledged, descent will be authorize "blind" transmissions of appropriate tnstructions over air started at the estimated time of arrival indi- carrler radio facllities (for air carrier aircraft), and/or over suitable radio range facilities. Instructions should not be broadcast unleas authorized cated by the elapsed time specified in the flight by Air Traffe Control.

(Rev. 11/1/59) U.S, GOVERNMENT PRINTING OFFICE: 1960 O -534190

(Rev. 11/1/59) U.S, GOVERNMENT PRINTING OFFICE: 1960 O -534190