Radar Vectors
Civil Aeronautics Manual Historical Issued Sep 15, 1959 268 pages Copy saved Nov 21, 2026

CAM 40 Scheduled Interstate Air Carrier Certification and Operation Rules

This document is historical. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

Civil Aeronautics Manual 40

Scheduled Interstate A Air Carrier

Certification and Operation Rules

CONSOLIDATED REPRINT (Incorporates Supplements 1 through 8)

FEDERAL AVIATION AGENCY

September 15, 1959 For sale by the Superintendent of Documents, U.S. Government Printing Office, Washington 25, D.C.

FEDERAL AVIATION AGENCY

FEDERAL AVIATION AGENCY

N. E. Halaby, Administrator

Important Notice

This is a consolidated reprint of all Civil Aeronautics Manual 40 material and incorporates the pages issued by Supplements 1 through 8. It contains no new material. Subsequent changes will be issued as Supplement No. 9 or as a complete new manual as the circumstances require.

(Reprinted February 15, 1963)

Introductory Note

This manual contains in consolidated form (1) Civil Air Regulations Part 40, Scheduled Interstate Air Carrier Certification and Operation Rules, dated December 31, 1955, Amendments 40–1 through 40–18, and the editorial changes required by Special Regulation SR–430, effective December 31, 1958; and (2) the rules, policies, and interpretations issued by the Administrator of the Federal Aviation Agency in application to the various sections of the regulations. FAA rules are supplementary regulations issued pursuant to authority expressly conferred on the Administrator in the Civil Air Regulations. Such rules are mandatory and must be complied with. FAA policies provide detailed technical information on recommended methods of complying with the Civil Air Regulations. Such policies are for the guidance of the public and are not mandatory in nature. FAA interpretations define or explain words and phrases of the Civil Air Regulations. Such interpretations are for the guidance of the public and will be followed by the Agency in determining compliance with the regulations. This manual is arranged to give the number, title, and text of each section of the regulations followed by any rules, policies, or interpretations applicable to that section. These rules, policies, or interpretations of the Administrator are identified by consecutive dash numbers appended to the regulation section number. This manual supersedes Civil Aeronautics Manual 40 dated April 1, 1956, and all supplements thereto. As amendments and other pertinent materials pertaining to Part 40 are issued, they will be included in this manual. CAM 40 I

Contents

Applicability and Definitions Section Page Applicability of this part_ 40.1 1 Applicability of Parts 43 and 60 of this subchapter 40.2 1 Definitions. 40.5.. 1

Certification Rules and Operations Specifications

Requirements

Certificate required.. 40.10 5 Contents of certificate. 40.11 5 Application for certificate. 40.12.. 5 Application for air carrier operating certificate (FAA rules which apply to sec. 40.12).. 40.12-1. 5 Issuance of certificate 40.13. 10 Amendment of certificate. 40.14 11 Display of certificate.. 40.15 11 Duration of certificate. 40.16 11 Transferability of certificate 40.17. 11 Operations specifications required.. 40.18. 11 Original issuance and amendment of operations specifications (FAA rules which apply to sec. 40.18(a)).- 40.18-1- 11 Form of application for issuance of initial or revised Operations Specifications, Aircraft Maintenance (FA A rules which apply to sec. 40.18(a)) -- 40.18-2. 12 Form of application for issuance of initial or revised Operations Specifications, Aircraft Weight and Balance Control (FAA rules which apply to sec. 40.18(a)).. 40.18–3.. 12 Policies, procedures, and limitations governing issuance and amendment of Operations Specifications, Aireraft Maintenance (FAA policies which apply to sec. 40.18(a))_. 40.18-4.. 12 Contents of specifications.. 40.19. 15 Content of operations specifications, aircraft maintenance (FAA policies which apply to sec. 40.19(e)) 40.19-1. 15 Content of operations specifications, aircraft weight and balance control (FAA policies which apply to sec. 40.19(f))-. 40.19–2.. 15 Utilization of operations specifications. 40.20. 16 Amendment of operations specifications. 40.21. 16 Inspection authority.. 40.22_. 16 Operations and maintenance base and office. 40.23.. 16

Requirements for Services and Facilities

Route requirements; demonstration of competence. 40.30 16 Route requirements; demonstration of competencc (FAA policies which apply to sec. 40.30) - 40.30-1.. 16 Proving fight requirements (FAA policies which apply to sec. 40.30) -- 40.30–2.- 16 Width of routes.. 40.31 17 IFR routes outside of control areas. 40.32 17 Airports.. 40.33.. 17 Airports (FAA policies which apply to sec. 40.33) - 40.33-1- 17 Communications facilities.. 40.34. 18 Communications facilities required for air route traffic control (FAA policies which apply to sec. 40.34(b)).- 40.34-1- 18 Weather reporting facilities... 40.35. 18 En route navigational facilities. 40.36 19

CAM 40 I11

IV CONTENTS

IV CONTENTS

Requirements for Services and Facilities-Continued

Servicing and maintenance facilities..

Section 40.37.

Servicing and maintenance facilities (FA4 policies which apply to sec.

40.37). Location of dispatch centers

Manual Requirements

Preparation of manual. Contents of manual.

40.37-1-- 40.38..

40.50.. 40.51.

19 19

19 19

Contents of manual: methods and procedures for maintaining weight

20

and balance control (FA A policies which apply to sec. 40.51(a)(19))---- 40.51-1--

24

Contents of manual (FA A interpretations which apply to sec. 40.51(a) (8)) . 40.51–2.

Distribution of manual.. Airplane Flight Manual.

Airplane Requirements

General. Airplane certification requirements. Airplane limitation for type of route. Proving tests..-

40.52... 40.53._

40.60.. 40.61 40.62. 40.63..

24 24

24 25 25 25

Materially altered in design (FAA interpretations which apply to sec.

40.63(b)(1)).

40.63-1.

25

Airplane Performance Operating Limitations; Transport

Category

Transport category airplane operating limitations.. Deviations (FA.A rules which apply to sec. 40.70(a))-. Accuracy of data (FAA policies which apply to sec. 40.70(b))..

40.70. 40.70-1. 40.70-2.

26 26 26

Temperature accountability (FAA policies which apply to sec. 40.70(c))._- 40.70–3.

Weight limitations.. Weight limitations (FAA policies which apply to sec. 40.71).. Take off limitations to provide for engine failure . .

40.71 40.71-1. 40.72.

26 26 27 27

Takeoff limitations to provide for engine failure (FAA policies which

apply to sec. 40.72) - - -. En route limitations; all engines operating--. En route limitations; one engine inoperative.. En route limitations; two engines inoperative Special en route limitations..

40.72-1. 40.73.. 40.74. 40.75. 40.76.. 40.76-1.

27 31 31 32 32 32

Special en route limitations (FAA policies which apply to sec. 40.76)_--

Landing distance limitations; airport of destination.

40.77..

33

Landing distance limitations; airport of destination (FAA policies which

apply to sec. 40.77)_. Landing distance limitations; alternate airports.

40.77-1- 40.78.

33 33

Airplane Performance Operating Limitations;

Nontransport Category

Nontransport category airplane operating limitations.. Performance data (FAA rules which apply to sec. 40.90) Takeof limitations - - Takeof limitations (FAA rules which apply to sec. 40.91)-. Takeoff limitations (FAA policies which apply to sec. 40.91). En route limitations; one engine inoperative... En route limitations (FAA rules which apply to sec. 40.92)- Landing distance limitations; airport of intended destination..

40.90 40.90-1- 40.91.- 40.91-1_ 40.91–2. 40.92... 40.92-1. 40.93..

34 34 34 34 35 35 35 35

Landing distance limitations (F.AA rules which apply to sec. 40.93)----

40.93-1..

Landing distanee limitations: airport of destination (FAA policies which

40.93-2..-.

apply to sec. 40.93)..

CAM 40 CONTENTS

CAM 40 CONTENTS

Landing distance limitations: alternate airports.

Section 40.94.

Landing distance limitations; alternate airports (FAA rules which apply

to sec. 40.94)..

40.94-1

Special Airworthiness Requirements

Fire prevention Susceptibility of materials to fire. Cabin interiors. Internal doors. Ventilation.. Fire precautions. Proof of compliance- Propeller de-icing fluid. Pressure cross-feed arrangements. Location of fuel tanks. Fuel system lines and fittings. Fuel lines and fittings in designated fire zones. Fuel valves.. Oil lines and fttings in designated fire zones. Oil valves. Oil system drains. Engine breather line. Fire walls. Fire-wall construction. Cowling--- Engine accessory section diaphragm. Powerplant fire protection. Flammable fluids. Shutoff means.. Lines and fittings. Vent and drain lines. Fire-extinguishing systems. Fire-extinguishing agents. Extinguishing agent container pressure relief_ Extinguishing agent container compartment temperature- Fire-extinguishing system materials. Fire-detector systems. Fire detectors_. Protection of other airplane components against fire. Control of engine rotation. Fuel system independence.. Induction system ice prevention_ ECarriage of cargo in passenger compartments]-

40.110. 40.111. 40.112. 40.113. 40.114 40.115. 40.116. 40.117. 40.118 40.119. 40.120. 40.121 40.122. 40.123. 40.124 40.125. 40.126. 40.127 40.128 40.129 40.130 40.131_ 40.132. 40.133. 40.134. 40.135. 40.136_ 40.137. 40.138. 40.139. 40.140. 40.141. 40.142. 40.143 40.150 40.151. 40.152. 40.153.

37 37 37 37 37 37 38 38 38 38 39 39 39 39 39 39 39 39 39 39 40 40 40 40 40 40 40 40 41 41 41 41 41 41 41 41 41 41

Instruments and Equipment for All Operations

Aircraft instruments and equipment for all operations...

40.170..

42

Approval of aircraft instruments and equipment for all operations (FAA

interpretations which apply to sec. 40.170(a))_.

40.170–1...

43

Determination of operable condition of radio equipment (FA.A interpre-

tations which apply to sec. 40.170(c)) .-

40 170–2..

43

Airspeed limitations and related information contained in the Airplane

40.170-3.

43

Flight Manual (FAA policies which apply to sec. 40.170(b))..

Flight and navigational equipment for all operations. Engine instruments for all operations.

40.171.. 40.172.

43 43

Warning lights for reversible propellers (FAA policies which apply to sec.

40.172(1)) -- Emergency equipment for all operations.

40.172-1. 40.173..

44 44

Hand fire extinguishers for crew, passenger, and cargo compartments

(FAA interpretations which apply to sec. 40.173(b)).-

40.173-1..

VI CONTENTS CAM 40

VI CONTENTS CAM 40

Section Page Seats and safety belts for all occupants.. 40.174.. 45 Miscellaneous equipment for all operations. 40.175. 45 Power supply and distribution systems (FA.4 interpretations which apply to sec. 40.175(c)).- 40.175-1.. 46 Cockpit check procedure. 40.176. 46 Passenger information for all operations.. 40.177.. 46 Exterior exit and evacuation markings for all operations. 40.178. 46

Instruments and Equipment for Special Operations

Instruments and equipment for operations at night.. 40.200. 46 Instruments and equipment for operations under IFR or over-the-top-- 40.201. 47 Supplemental oxygen; reciprocating-engine-powered airplanes.- 40.202. 47 Supplemental oxygen for erew members (F.AA interpretations which apply to sec. 40.202(b) (1)).. 40.202-1.. 47 Oxygen requirements for standby erew members (FAA interpretotions which apply to sec. 40.202(b))... 40.202–2.. 47 Operating instructions (FAA policies which apply to sec. 40.202).. 40.202–3. 48 Oxygen requirements for jump seat occupant (FAA policies which apply to sec. 40.202).- 40.202–4.. 48 Oxygen requirements for infants-in-arms (FA1 policies which apply to sec. 40.202(c)) 40.202–5... 48 Oxygen requirements for elinical purposes (FAA policies which apply to sec. 40.202(c)).- 40.202–6. 48 Supplemental oxygen for sustenance; turbine-powered airplanes. 40.202–T.. 48 Supplemental oxygen requirements for pressurized cabin airplanes; reciprocating-engine-powered airplanes..

40.203 49 Computation of supply for crew members in pressurized cabin aircraft (FAA policies which apply to sec. 40.203(a))--- 40.203-1.. 50 Computations of supply for passengers in pressurized cabin aireraft (FA.A policies which apply to sec. 40.203(b))..- 40.203–2... 51 Oxygen requirements for elinical purposes (FAA policies which apply to sec. 40.203(b)).... 40.203-3... 51 Oxygen requirements for infants-in-arms (FAA policies which apply to sec. 40.203(b)).. 40.203–4... 52 Supplemental oxygen for emergency descent and first aid; turbine-powered airplanes with pressurized cabins. 40.203-T.. 52 Equipment standards.. 40.204. 53 Protective breathing equipment for the flight crew. 40.205. 53 Requirement of protective breathing equipment in nonpressurized cabin airplanes (FA.4 rules which apply to sec. 40.205(b))------ 40.205-1..- 54 Proteetive breathing equipment and installation (FAA policies which apply to sec. 40.205) . 40.205–2.. 54 Equipment for overwater operations. 40.206.. 54 Equipment for operations in icing conditions. 40.207 54 Flight recorders.. 40.208.. 55

Radio Equipment

Radio equipment_ 40.230 55 Independent radio systems (F.A.A interpretations which apply to sec. 40.230) - - - 40.230–1.. 55 Radio equipment for operations under VFR over routes navigated by pilotage_- 40.231. 55 Radio equipment for operations under VFR over routes not navigated by pilotage or for operations under IFR or over-the-top-- 40.232. 55 Dispatch of aireraft equipped with one VHF and one low frequeney radio receiver (FAA interpretations which apply to sec. 40.232(c)) … 40.232-1.... 56

CAM 40 CONTENTS

CAM 40 CONTENTS

VII

Maintenance and Inspection Requirements

Responsibility for maintenance_ Maintenance and inspection requirements.

Section 40.240. 40.241.

Pogt 56 57

Persons directly in charge of inspection, maintenance, overhaul, or repair of airframes, engines, propellers, or appliances (FAA interpretations

which apply to sec. 40.241(b))-- Maintenance and inspection training program. Maintenance and inspection personnel duty time limítations.

40.241-1... 40.242.. 40.243..

57 57 57

Airman and Crew Member Requirements

Utilization of alrman_ Composition of flight crew Flight engineer-- Flight attendant_. Aircraft dispatcher-

40.260.. 40.261 40.263. 40.265_ 40.266. 40.267

57 57 58 58 58

Assignment of emergency evacuation functions for each crew member_--

Training Program Training requirements. Initial pilot ground training- Initial pilot flight training. Initial flight engineer training.. Initial crew member emergency training-

40.280. 40.281. 40.282.. 40.284.. 40.286..

58

58 58 59 60 60

Initial crew member emergency training; synthetic trainers (FAA

interpretations which apply to sec. 40.286(b)).. Initial aircraft dispatcher training. Recurrent training-_. CApproval of training program

40.286-1. 40.288. 40.289. 40.2901....

60 60 60-1 60-1

Flight Crew Member and Dispatcher Qualification

Qualification requirements. Pilot recent experience. Pilot checks.

40.300.. 40.301. 40.302..

60-1 60-1 60-2

Pilot check; proficiency requirements (FAA rules which apply to sec.

40.302(b)). Deleted.

40.302-1._ 40.302–2.

62 64

Pilot checks use of synthetic trainer (FAA policies which apply to sec.

40.302(b) (2) (ii)) _--

40.302–3..

64

Requirements for approved training course—aireraft simulator (FAA

rules which apply to sec. 40.302(b)(3)).

40.302–4..

65

Simulation requirements of aircraft simulators used in an approved train-

ing course (FA A policies which apply to sec. 40.302(b)(3))_. Pilot route and airport qualification requirements.-

40.302–5.. 40.303.

65 66

Pilot route and airport qualification requirements (FAA interpretations

which apply to sec. 40.803).-

40.303–1..-

66

Maintenance and reestablishment of pilot route and airport qualifications for

particular trips__- [Proficiency check; second in comma,d] Flight engineer qualification for duty--

40.304_ 40.305. 40.307_

66 67 67

Flight engineer qualification for duty. (FAA interpretations which apply

to sec. 40.307). Aircraft dispatcher qualification for duty-

Flight Time Limitations Flight time limitations.

40.307-1.. 40.310.

40.320

67 67

68

Duty Time Limitations; Aircraft Dispatcher

Aircraft dispatcher daily duty time limitations.

40.340.

VIII CONTENTS

VIII CONTENTS

Flight Operations

Operational control.. Operations notices. Operations schedules. Flight crew members at controls. Manipulation of controls. -

Section 40.351. 40.352. 40.353. 40.354. 40.355

Page 68-1 69 69 69 69

Manipulation of controls (FAA interpretations which apply to sec. 40.S55

Section 40.351. 40.352. 40.353. 40.354. 40.355

(a) and (b)).. Admission to flight deck.

40.355-1.. 40,356..

69 69 70

Admission to fight deck (F A A interpretations which apply to sec. 40.856) -- 40.356–1.

Use of cockpit check procedure. Personal flying equipment. Restríction or suspension of operation. Emergency decisions; pilot in command and aircraft dispatcher..

40.357. 40.358. 40.359 40.360.

70 70 70 70

Reporting potentially hazardous meteorological conditions and irregularities

of ground and navigational facilities. Reporting mechanical irregularities.. Engine failure or precautionary stoppage Instrument approach procedures. Requirements for air carrier equipment interchange. Briefing of passengers.-- Drinking and serving of alcoholic beverages

Dispatching Rules

Necessity for dispatching authority - Familiarity with weather conditions. Facilities and services. Airplane equipment required for dispatch_.

40.361. 40.362. 40.363.. 40.364. 40.365.. 40.370.. 40.371.

40.381... 40.382.. 40.383.. 40.384..

71 71 71 72 72 72 72

72 72 72 73

Communications and navigational facilities required for dispatch.

Dispatching under VFR.. Dispatching under IFR or over-the-top. Alternate airport for departure. Alternate airport for destination; IFR or over-the-top- Alternate airport weather minimums..

40.385.. 40.386.. 40.387.. 40.388.. 40.389.. 40.390..

73 73 73 73 73 73

Alternate airport landing minimums for airports not served by a radio navigation facility (FAA policies which apply to sec. 40.390(c))-_-----

40.390-1_

74

Establishment of alternate airport landing minimums at airports where ILS or GCA only available instrument approach aids (FAA interpreta-

tions which apply to sec. 40.390(a))-.

40.390-2_..

75

Establishment of alternate airport landing minimums at airports

40.390–3..-.

75

served by ILS (FAA policies which apply to sec. 40.390(a))..

Continuance of flight; flight hazards..

40.391..

75

Circumstances when ineorporation of procedures may be authorized in the air carrier's manual for continued operation beyond a scheduled

terminal (FAA policies which apply to sec. 40.S91(b)).. Operation in ícing conditions - . Redispatch and continuance of flight. Dispatch to and from provisional airport.

40.391-1.- 40.392.. 40.393.. 40.394..

75 75 75 76

Takeofīs from alternate airports or from airports not listed in the operations

specifications. - Fuel supply for all operations. Factors involved in computing fuel required. Takeoff and landing weather minimums; VFR.

40.395. 40.396.. 40,397.. 40.405..

76 76 76 76

VFR takeoff and landing minimums (FAA interpretations which apply

to sec. 40.405) ..

40.405-1..-

76

CAM 40 CONTENTS

CAM 40 CONTENTS

Section Page Takeoff and landing weather minimums; IFR_. 40.406. 77 IFR takeoff and landing, and instrument approach procedure, weather minimums (FAA interpretations which apply to sec. 40.406) - - 40.406-1.-- 77 Ceiling and visibility minimums—IFR (FAA policies which apply to sec. 40.406)-- 40.406–2... 78 Instrument approach procedures and IFR landing weather minimums at airports served by both ILS and GCA (FAA interpretations which apply to sec. 40.406(c))-- 40.406–3. 83 Flight altitude rules.. 40.408.. 83 Altitude maintenance on initial approach_. 40.409 84 Preparation of dispatch release. 40.411. 84 Preparation of load manifest_. 40.412_. 84

Required Records and Reports

Crew member and dispatcher records.. 40.501.. 84 Crew member and dispatcher records (FAA policies which apply to sec. 40.501)... 40.501-1.. 84 List of airplanes. 40.502.. 85 Dispatch release form. 40.503.. 85 Dispatch release form (FAA interpretations which apply to sec. 40.503 (a)(2))-- 40.503-1- 85 Load manifest.. 40.504 85 Disposition of load manifest, dispatch release form and flight plans.. 40.505.. 85 Maintenance records_ 40.506. 85 Maintenance log-... 40.507.. 86 Mechanical reliability reports... 40.508.. 86 Mechanical interruption summary report_. 40.509. 86 Alteration and repair reports. 40.510. 86 Maintenance release. 40.511. 87 Purpose and form of maintenance release (FAA interpretations which apply to sec. 40.511). 40.511–1.. 87 Communication records.. 40.512.. 87

Appendixes Appendix A: Examples explaining use of figures 1-11. 89 Figures 1-11.. 91

Appendix B: Special Civil Air Regulations which affect Part 40- 101 SR-389B. Emergency Exits for Airplanes Carrying Passengers for Hire. 103 Amendment No. 1 to SR-389B. 107 SR-392C. Facilitation of Experiments with Exterior Lighting Systems. 109 CSR-392D. Display of Experimental Exterior Lighting Systems Approved for Use on Aircraft]. 110-1 SR-395A. Authorization for Air Taxi Operators to Conduct Operations Under the Provisions of Part 42 of the Civil Air Regulations—Extension of Expiration Date for Air Taxi Operator Certificates... 111 SR-405. Crew Flight Time Limitations for Certain Transcontinental Nonstop Operations. 113 Interpretation of SR-405.. 115 SR-406C. Application of Transport Category Requirements to C-46 Type Airplanes_ 119 ESR-411B. Operation of Certain Transport Category Airplanes in Cargo Service at Increased Zero Fuel and Landing Weights.. 123 SR-420. Emergency Evacuation Equipment for DC-3 Type Airplanes.. 127 SR-422. Turbine-Powered Transport Category Airplanes of Current Design- 129 SR-422A. Turbine-Powered Transport Category Airplanes of Current Design. 143 SR-422B. Turbine-Powered Transport Category Airplanes of Current Design_ 163 SR-423. Type Certification of Transport Category Airplanes with Turbo-Prop Replacements... 181

CONTENTS CAM 40

CONTENTS CAM 40

Page SR-425C. Provisional Certifcation and Operation of Aircraft_ 185 SR-426. Performance Credit for Transport Category Airplanes Equipped with Standby Power..- 191 SR-432A. Carriage of Persons Aboard All-Cargo Aircraft. 197 SR-436B. Airborne Weather Radar Equipment Requirements for Airplanes Carrying Passengers.. 201 SR-440. Occupancy of Forward Observer's Seat During En Route Inspection.. 205 LSR-446A. Use of Portable Frequency Modulation (FM) Type Radio Receivers on Aircraft During FlightJ. 207 SR-448A. Precautions to Prevent Hijacking of Aircraft and Interference With Crewmembers in the Performance of Their Duties.. 209 [SR-450A. Airspeed Operation Limitation for Transport Category Airplanes]. 211

Addendum

Preambles to Amendments to Part 40. P-1

Scheduled Interstate Air Carrier Certification

and Operation Rules

Applicability and Definitions

40.1 Applicability of this part. The provisions of this part are applicable to air carriers holding certificates of public convenience and necessity issued in accordance with Title IV of the Federal Aviation Act of 1958, as amended, when they engage in scheduled interstate air transportation within the continental limits of the United States: Provided, That the provisions of this part shall not apply to operations conducted pursuant to economic exemption authority issued by the Board for a period of 90 days or less: And provided further, That the Administrator may authorize any air carrier holding authority to engage in scheduled cargo operations pursuant to Title IV of the Federal Aviation Act of 1958, as amended, to conduct such operations in accordance with the air carrier certification and operations rules prescribed in Part 42 of this subchapter: And provided further, That in the case of segments of routes extending beyond the continental limits of the United States the Administrator may authorize an air carrier to conduct operations over such route segments pursuant to provisions of this part. 40.2 Applicability of Parts 43 and 60 of this subchapter. The provisions of Parts 43 and 60 of this subchapter shall be applicable to all air carrier operations conducted under the provisions of this part unless otherwise specified in this part. 40.5 Definitions. As used in this part terms shall be defined as follows: Accelerate-stop distance. Accelerate-stop distance is the distance required to accelerate an airplane to a specified speed and, assuming failure of the critical engine at the instant that speed is attained, to bring the airplane

to a stop. (See the pertinent airworthiness requirements for the manner in which such distance is determined.) Administrator. The Administrator is the Administrator of the Federal Aviation Agency. Air carrier. An air carrier is any citizen of the United States who undertakes directly, or by lease or by other arrangement, the carriage by airplane of persons or property as a common carrier for compensation or hire, or the carriage of mail by airplane. Aircraft dispatcher. An aircraft dispatcher is an individual holding a valid aircraft dispatcher certificate issued by the Administrator who exercises responsibility with the pilot in command in the operational control of each flight. Airframe. Airframe means any and all kinds of fuselages, booms, nacelles, cowlings, fairings, empennages, airfoil surfaces, and landing gear, and all parts, accessories, or controls, of whatever description, appertaining thereto, but not including engines and propellers. Airplane. An airplane is a power-driven fixed-wing aircraft, heavier than air, which is supported by the dynamic reaction of the air against its wings. Airport. An airport is an area of land or water which is used, or intended for use, for the landing and take-off of airplaņes. Alternate airport. An alternate airport is an approved airport to which a flight may proceed if a landing at the airport to which the flight was dispatched becomes inadvisable. Appliances. Appliances are instruments, equipment, apparatus, parts, appurtenances, or accessories of whatever description, which are used, or are capable of being or intended

2 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

2 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

to be used, in the navigation, operation, or Duty aloft. Dut aloft includes the entire control of airplanes in flight (including com- period during which an individual is assigned munication equipment, electronic devices, as a member of an airplane crew during flight and any other mechanism or mechanisms in- time. stalled in or attached to airplanes during Effective length of runway. flight, but excluding parachutes), and which (1) Take-off. The effective length of are not a part or parts of airframes, engines, runway for take-off as used in the take-off or propellers. operating limitations for nontransport cate- Approved. Approved, when used alone or gory airplanes is the distance from the end as modifying terms such as means, method, of the runway at which the take-off is started action, equipment, etc., means approved by to the point at which the obstruction clearthe Administrator. ance plane associated with the other end of Authorized representative of the Adminis- the runway intersects the center line of the trator. An authorized representative of the runway.

Administrator is any employee of the Fed- (2) Landing. The effective length of eral Aviation Agency or any private person, runway for landing as used in the landing authorized by the Administrator to perform operating limitations for both transport and particular duties of the Administrator under nontransport category airplanes is the disthe provisions of this part. tance from the point at which the obstruction Ceiling. Ceiling is the height above the clearance plane associated with the approach ground or water of the lowest layer of end of the runway intersects the center line clouds or obscuring phenomena that is re- of the runway to the far end thereof. ported as “broken," “overcast,” or “obscura- En route. En route means the entire flight tion” and not classified as "thin" or "partial." from the point of origination to the point of Check airman. A check airman is an air- termination, including intermediate stops. man designated by the air carrier and ap- Extended overwater operation.

An exproved by the Administrator to examine tended overwater operation is an operation other airmen to determine their proficiency over water conducted at a distance in excess with respect to procedures and technique of 50 miles from the nearest shore line. and their competence to perform their re- Fireproof. Fireproof material means a spective airman duties. material which will withstand heat equally Crew member. A crew member is any indi- well or better than steel in dimensions approvidual assigned by an air carrier for the per- priate for the purpose for which it is to be formance of duty on an airplane in flight. used. When applied to material and parts Critical engine. The critical engine is that used to confine fires in designated fire zones, engine the failure of which gives the most fireproof means that the material or part will adverse effect on the airplane flight charac- perform this function under the most severe teristics relative to the case under considera- conditions of fire and duration likely to occur tion. in such zones.

Critical-engine-failure speed, V, (trans- Fire-resistant. When applied to sheet or port category airplanes). The critical-en- structural members, fire-resistant material gine-failure speed is the airplane speed used means a material which will withstand heat

required at which the critical engine is as- sumed to fail. (See the pertinent airworthi- in the determination of the take-off distance equally well or better than aluminum alloy in dimensions appropriate for the purpose

ness requirements for the manner in which for which it is to be used. When applied to such speed is determined.) fluid-carrying lines, this term refers to a line Dispatch release. A dispatch release is an and fitting assembly which will perform its authorization issued by an air carrier speci- intended protective funtions under the heat fying the conditions for the origination or and other conditions likely to occur at the continuance of a particular fight. particular location.

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

Flame-resistant. Flame-resistant material means a material which will not support combustion to the point of propagating beyond safe limits, a flame after the removal of the ignition source. Flammable. Flammable fluids or gases mean those which will ignite readily or explode. Flash-resistant. Flash-resistant material means material which will not burn violently when ignited. Flight crew member. A flight crew member is a crew member assigned to duty on an airplane as a pilot or flight engineer. Flight engineer. A flight engineer is an individual holding a valid flight engineer çertificate issued by the Administrator and whose primary assigned duty during flight is to assist the pilots in the mechanical operation of an airplane. Flight time. Flight time is the time from the moment the airplane first moves under its own power for the purpose of fight until it comes to rest at the next point of landing (block-to-block time). High-altitude operation.

High-altitude operation is flight conducted at or above 12,500 feet above sea level east of longitude 100° W. and at or about 14,500 feet above sea level west of longitude 100° W. IFR. IFR is the symbol used to designate instrument fight rules. Interstate air transportation. Interstate air transportation is the carriage by airplane of persons or property as a common carrier for compensation or hire or the carriage of mail by airplane, in commerce between a place in any State of the United States, or the District of Columbia, and a place in any other State of the United States, or the District of Columbia; or between places in the same State of the United States, or the District of Columbia; whether such commerce moves wholly by airplane or partly by airplane and partly by other forms of transportation. Maximum certificated take-off weight. Maximum certificated take-off weight is the maximum take-off weight authorized by the

terms of the airplane airworthiness certificate. NOTE: The airplane airworthiness certificate incorporates as a part thereof the airplane operating record or that portion of an Airplane Flight Manual which contains the pertinent limitation. Minimum control speed. The minimum control speed is the minimum speed at which an airplane can be safely controlled in flight after an engine suddenly becomes inoperative. (See pertinent airworthiness requirements for the manner in which such speed is determined. Month. A month is that period of time extending from the first day of any month as delineated by the calendar through the last day thereof. Night. Night is the time between the ending of evening civil twilight and the beginning of morning civil twilight as published in the American Air Almanac converted to local time for the locality concerned.

NOTE: The American Air Almanac containing the ending of evening twilight and the beginning of morning twilight tables may be obtained from the Superintendent of Documents, Government Printing Office, Washington 25, D.C. Information is also available concerning such tables in the Offices of the Civil Aeronautics Administration or the United States Weather Bur eau. Obstruction clearance area. (1) Take-off. A take-off obstruction clearance area as used in the take-off operating limitations for nontransport category airplanes is an area on the earth's surface defined as follows: The center line of the obstruction clearance area in plan view shall coincide with and prolong the center line of the runway, beginning at the point where the obstruction clearance plane intersects the center line of the runway and proceeding to a point not less than 1,500 feet from the beginning point.

Thereafter the center line shall proceed in a path consistent with the take-off procedure for the runway or, where such a procedure has not been established, consistent with turns of at least 4,000-foot radius until a point is reached beyond which the obstruction clearance plane clears all obstructions. The obstruction clearance area shall extend laterally for a distance of 200

4 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

4 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

feet on each side of the center line at the continuation, diversion, or termination of a point where the obstruction clearance plane fight. intersects the runway and shall continue at Operations Specifications. Operations this width until the end of the runway; specifications are rules of particular applithence it shall increase uniformly to 500 feet cability issued by the Administrator and on each side of the center line at a point 1,500 are not part of the air carrier operating feet from the intersection of the obstruction certificate. clearance plane with the runway; thereafter Over-the-top. Over-the-top means the operit shall extend laterally for a distance of 500 ation of an aírplane above a layer of clouds feet on each side of the center line. or obscuring phenomena that is reported as (2) Landing. A landing obstruction "broken," "overcast," or "obscuration" and clearance area as used in the landing operat- not classified as "thin" or "partial." ing limitations for both transport and non- Pilot in command.

The pilot in command transport category airplanes is an area on is the pilot designated by the aircarrier as the the earth's surface defined as follows: The pilot responsible for the operation and safety center line of the obstruction clearance area of the airplane during the time defined as in plan view shall coincide with and prolong flight time. the center line of the runway, beginning at Pilotage. Pilotage is navigation by means the point where the obstruction clearance of visual reference to landmarks. plane intersects the center line of the runway Propeller. A propeller is a device for proand proceeding to a point not less than 1,500 pelling an airplane through the air, having feet from the beginning point. Thereafter blades mounted on a power-driven shaft, the center line shall proceed in a path con- which when rotated produces by its action sistent with the instrument approach pro- on the air a thrust approximately parallel to cedure for the runway or, where such a pro- the longitudinal axis of the airplane.

cedure has not been established, consistent with turns of at least 4,000-foot radius until Provisional airport. A provisional airport a point is reached beyond which the obstruc- is an airport approved for use by an air cartion clearance plane clears all obstructions. rier for the purpose of providing service to a The obstruction clearance area shall extend community when the regular airport serving laterally for a distance of 200 feet on each that community is not available. side of the center line at the point where the Rating. A rating is an authorization issued obstruction clearance plane intersects the with a certificate, and forming a part thereof, runway and shall continue at this width delineating special conditions, pirvileges, or until the end of the runway; thence it shall limitations pertaining to such certificate. increase uniformly to 500 feet on each side Refueling airport.

A refueling airport is of the center line at a point 1,500 feet from an airport approved as an airport to which the intersection of the obstruction clearance flights may be dispatched only for refueling. plane with the runway; thereafter it shall Regular airport. A regular airport is an extend laterally for a distance of 500 feet airport approved as a regular terminal or inon each side of the center line. termediate stop on an authorized route. Obstruction clearance plane. An obstruc- Route. A route is the airspace on either tion clearance plane is a plane which is tan- side of a course joining those points on the gent to or clears all obstructions within the surface of the earth between which an air obstruction clearance area and which slopes carrier provides air transportation in accordupward from the runway at a slope of 1:20 ance with the terms of its certificate of public to the horizontal as shown in a profile view convenience and necessity issued by the of the obstruction clearance area. Board. Operational control. Operational control Route segment.

A route segment is a poris the exercise of authority over initiation, tion of a route each terminus of which is

CAM 40 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

CAM 40 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

identified by: (1) A continental or insular geographic location, or (2) a point at which a definite radio fix can be established. Runway. A runway is a clearly defined area of an airport suitable for the safe landing or take-off of airplanes. Scheduled for duty aloft. Scheduled for duty aloft means the assignment of a flight crew member on the basis of the flight time established in the operations schedules rather than the actual flight time. Second in command. Second in command means a pilot other than the pilot in command who is designated by the air carrier to act as second in command of an airplane. E(Amendment 40–21, published in 24 F.R. 9765, Dec. 5, 1959, effective Jan. 1, 1961.)1 Show. Show means to demonstrate or prove to the satisfaction of the Administrator prior to the issuance of the air carrier operating certificate and at any time thereafter required by the Administrator. Synthetic trainer. A synthetic trainer is a device the use of which iș approved to simulate certain operating conditions. Take-off safety speed, V2.

The take-off safety speed is the airplane speed used in the determination of the take-off flight path at which the climb-out following take-off can be safely executed with one engine inoperative and with the airplane in the take-off configuration. (See the pertinent airworthiness requirements for the manner in which such speed is determined. Time in service. Time in service, as used in computing maintenance time records, is the time from the moment an airplane leaves the ground until it touches the ground at the end of a flight. Transport category airplane. A transport category airplane is an airplane which has been type certificated in accordance with the requirements of Part 4b of this subchapter or the transport category requirements of Part 4a of this subchapter. Type. With regard to airman qualifications, type means all airplanes of the same basic design, including all modifications thereto except those modifications which the Administrator has found result in a substantial change in characteristics pertinent to the airman concerned.

VFR. VFR is the symbol used to designate visual flight rules. Vs.. Vs. is the symbol used to designate the true indicated stalling speed or the minimum steady flight speed in the landing configuration. Visibility. Visibility is the greatest distance at which conspicuous objects can be seen and identified. (1) Flight visibility. Flight visibility is the average range of visibility forward from the cockpit of an airplane in flight to see and identify prominent unlighted objects by day and prominent lighted objects by night. (2) Ground visibility. Ground visibility is the visibility at the earth's surface as reported by the United States Weather Bureau or by a source approved by the Weather Bureau. Week. A week is that period of time extending from the first day of any week as delineated by the calendar through the last day thereof. Year. A year is that period of time extending from the first day of any year as delineated by the calendar through the last day thereof.

Certification Rules and Operations Specifications Requirements

40.10 Certificate required. No person subject to the provisions of this part shall operate an airplane in scheduled interstate air transportation without, or in violation of the terms of, an air carrier operating certificate issued by the Administrator. 40.11 Contents of certifcate. An air carrier operating certificate shall specify the points to and from which, and the routes over which, an air carrier is authorized to operate. 40.12 Application for certificate. An application for an air carrier operating certificate shall be made in the form and manner and contain information prescribed by the Administrator. 40.12-1 Application for air carrier operating certificate (FAA rules which apply to sec. 40.12.) (a) General. (1) The holder of a certificate of convenience and necessity shall apply to the appro-

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

priate Regional Administrator or an air carrier operating certifcate at least 30 days prior to the date proposed for beginning scheduled interstate air transportation within the continental limits of the United States. The application shall be prepared in loose-leaf form, on white paper of approximately 8′ x 101/" in size, and using one side of the sheet only. The application shall be executed by a duly authorized officer or employee of the applicant having knowledge of the matters set forth therein, and shall have attached thereto two copies of the appropriate written authority issued to such officer or employee by the applicant. (2) Two copies of the application, and of subsequent amendments thereto, shall be filed with the Regional Administrator having jurisdiction over the area in which the principal office of the air carrier is located.

When any facility or service directly affecting the operation of the air carrier concerned is furnished by other than the applicant or the Federal Government, at least two copies of the contract or working agreement concerning such facilities or service shall be submitted with the application. In this connection, if formal contracts covering such facilities or service have not been completed, letters showing agreement between the contracting parties will be accepted until copies of the formal contract are obtainable. (b) Format of application. The application shall be in the form of a letter and shall contain the information outlined below : TO: Regional Administrator, Federal Aviation Agency In accordance with section 604 of the Federal Aviation Act of 1958, as amended, and the Civil Air Regulations, application is hereby made for an Air Carrier Operating Certificate. Give exact name and full post office address of applicant. Give the name, title, and post office address of the official or employee to whom correspondence in regard to the application is to be addressed.

SEctioN I. O perations. A. State whether the type of service proposed is for the carriage of passengers, goods, or mail, or a particular combination thereof. If the type of service is not the same for each route or portion thereof, specify the type of service for each route or portion of a route.

B. State whether the type of operation proposed is day or night, visual fight rules, instrument or over-the-top, or a particular combination thereof. If the type of operation is not the same for each route or route segment, specify the type of operation for each route or route segment. SECTiON II. Schedule. A. Submit a proposed schedule plan (or plans if seasonal changes or differences in equipment are involved) indicating the following: 1. Block to block time and mileage between scheduled stops. 2. Ground time at each intermediate and terminal stop. B. Specify the basis upon which the proposed schedule has been computed, indicating the following: 1. Cruising speed and altitude. 2. Percentage of horsepower. 3. Direction and velocity of prevailing winds. SECTION III. Route. A. Submit a map suitable for aerial navigation on which are shown the exact geographical track of the proposed routes, and information with respect to terminal and intermediate stops, available landing areas, and radio navigational facilities.

This material will be indicated in a manner that will facilitate identification. The applicant may use any method that will clearly distinguish the information, such as different colors, different types of lines, etc. For example, if different colors are used, the identification will be accomplished as follows: 1. Airway routes: Black. 2. Direct routes: Green. 3. Terminal and regular intermediate stops: Orange circle. 4. Alternate landing fields or areas: Purple circle. 5. Other available landing fields or areas: Yellow circle. 6. Indicate the location and normal operating range of all radio navigational facilities to be used in connection with the proposed operation. B. 1irports. Furnish the following information with regard to each regular, alternate, refueling, and provisiona} airport to be used in the conduct of the proposed operation: 1. Name of airport.

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

2. Location (by coordinates, and by name of nearest city or town, and direction and distance thereto). 3. Class of airport or landing area (municipal, commercial, military, private, or marked auxiliary). 4. Altitude above sea level. 5. Dimensions in linear feet of landing space available. 6. If hard-surfaced runways are provıded, give number, direction, length and width of each and indicate type of surfacing. 7. Obstructions (list adjacent obstructions giving height and location, or attach appropriate C.G.A.L. charts if available). 8. Airport lighting (include beacon, auxiliary beacon, boundary lights, floodlights, etc., and any emergency lighting equipment; and by whom operated). 9. List refueling facilities available. 10. Is airport control tower provided and by whom? 11. Itemize radio navigational facilities provided and indicate the operating agency. 12. Does runway gradient exceed 2 percent? If so, state gradient. 13. What provisions are made for protection of passengers during loading and unloading at scheduled stop airports? 14. Prevailing winds? 15.

Where necessary, are adequate snow removal facilities available? C. Weather reporting. 1. Outline the weather service proposed to be used for dispatching over each route; the source, if other than a United States Weather Bureau Station; list in detail the location and agency in control of stations furnishing reports for each service; the frequency and method of collection and dissemination of weather information. Outline available terminal and route forecasting services, the type of maps and the intervals at which they are made each day. 2. Where it has been determined that additional weather reporting services will be required of the U.S. Weather Bureau for the type of operation involved, the air carrier will apply in writing to the appropriate Weather Bureau Regional Office. The request for the weather

reporting services considered essential should be made coincidental with this application to the Federal Aviation Agency. 3. For operations within the continental limits of the United States, if other than a U.S. Weather Bureau Station, show proof of U.S. Weather Bureau approval of the service and specify the meteorological facilities available, the number of personnel and the duties of each, such as the making of weather maps, forecasts, observations, etc. D. Airway lighting. List in detail all airway lighting on the routes other than those airway lighting facilities owned and operated by the Federal Aviation Agency if application includes request for night VFR operation. SECrioN IV. Radio Facilities. A. Communications. List company radio ground communication facilities installed, proposed to be installed, and those available to, but not owned by applicant, for each route. The expected communication coverage of all MF and HF ground facilities should be provided in map form. In the case of VHF, the expected coverage at exemplary altitudes should be outlined.

Aircraft reporting and general change points, and frequencies should be specified either on the maps or as an attachment. (If owned by other than applicant, attach two certified copies of operating agreement. List the following details for each station : Transmitters. List the following information in regard to each transmitter: 1. Make and model number. 2. Remotely or locally controlled. 3. Types of emission and antenna power for each type of emission. 4. Number of frequency channels provided and actual frequencies in kilocycles proposed to be used. 5. Method of frequency change (quick shift or manual tuning). 6. Primary power source, voltage, phase, etc., and whether commerical source or locally generated. 7. Auxiliary power source. 8. Functional purpose of transmitter. If transmitter is used for more than one func-

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

tion, list in order of primary and secondary functions as: a. Radiotelephone plane to ground primary purpose and radiotelephone point to point secondary purpose, or b. Radiotelephone point to point primary purpose and standby radiotelephone plane to ground secondary purpose, ete. Receivers. 1. List each receiver by type of model number and state its primary function, i.e., plane-to-ground guard, point-to-point C.W. or point-to-point radiotelephony. 2. List frequency range of each receiver and state which frequencies in each receiver are crystal controlled, if any. 3. Describe receiver installation to show number of receivers locally controlled and number remotely controlled. B. Radio navigational facilities. List each ground radio navigational facility, other than those operated by the United States Government, to be used in the conduct of the proposed operations (if privately owned ground radio navigátional facilities are to be used and are owned by other than the applicant, attach two certified copies of the operating agreement pertaining to the use of such facilities.

List the following information with respect to each facility: 1. Type of facility, i.e., ILS, GCA, Non- Directional Radio Beacon, LF and VHF Radio Ranges, Loran, etc. 2. Estimated effective range (in miles). 3. Coordinates and location with respect to field or landing area. 4. Power supply; i.e., commercial or locally generated. 5. Auxiliary power supply. 6. Operating frequency or frequencies. C. Aircraft radio equipment. List and describe the aircraft radio equipment installed in each aircraft by : 1. Type number. 2. Manufacturer. 3. Frequency range. 4. Operating frequencies. 5. Emergency power supply. 6. Antenna system. SECTiON V. Weather minimums.

A. Submit in detail the proposed ceiling and visibility limitations for takeoff for instrument flight and let-down-through at each regular, alternate, refueling, and provisional airport. Differentiate between daylight and darkness in the listing, and where more than one type of aircraft is to be utilized, and a differential of limitations exists, indicate proposed limitations for each type of aircraft. B. Submit for each proposed scheduled stop and alternate airport a detailed flight procedure for instrument aproach and let-down-through and where specific procedures are necessary because of terrain or traffic conditions, submit a detailed flight procedure for takeoff and climb (such procedure should be set up on the basis of the ceiling and visibility minimums proposed). C. The above information may be submitted on Forms ACA-511 of the aircarrier's proposed operations specifications. SECTION VI. Aircraft. A. List the following information, as applicable, for each aircraft to be used in the proposed operations: 1. The name of the manufacturer. 2. Certification basis and category. 3.

Manufacturer's model number. 4. Name of the manufacturer and type number of engines. 5. Name of manufacturer and type number of propellers. 6. N registration number and aircraft designation. 7. Type of service in which aircraft will be used (carriage of persons, property, mail, or combination thereof). 8. Will aircraft be used in regular or reserve service? 9. What type of operation (day, night, visual flight rules, instrument (over-the-top)), will be conducted with this aireraft? 10. List each route or portion thereof over which this aircraft is to be operated and the maximum gross weight proposed for each route or portion thereof. 11. What is the service ceiling of each type aircraft with one engine inoperative? 12. List and describe installation and location of all lifesaving equipment and emergency supplies carried aboard each aircraft, such as

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

life rafts, life preservers, portable emergency transmitters, Very pistols and emergency rations. (If the same equipment is not carried during all seasons of the year, and on all routes, list and explain the difference.) SEcTioN VII. Maintenance: Aircraft, engines, and accessories. A. Furnish an organization chart indicating the authority and the duties of the maintenance and inspection personnel employed by the applicant and/or any other person with whom arrangements have been made for the performance of maintenance and inspection functions. B. Furnish a schedule of overhauls, inspections'and checks and the time limitations for such functions which will be performed on each type of aircraft to include the airframes, powerplants, propellers and appliances. The schedule should be sufficiently detailed to indicate all of the overhauls, inspections and checks which will be performed on all components of each type of air carrier aircraft. The schedule should be listed under the following general headings: 1. Aircraft components: a. Wings. b. Fuselage. c. Empennage. d. Landing gear. e. Wheels and brakes. f. Center section. (When applicable.) g. Nacelles. h. Control system. i. Hydraulic system. j. Accessories (aircraft). k. Fuel and oil system (aft of firewall). 1. Fuel tanks. m. Cabin pressurizing and heating systems. 2. Engine components: a. Engine. b. Accessories (engine). c. Propellers. d. Fuel and oil system (forward of firewall). e. Oil tanks. 3. Instruments: a. Flight instruments. b. Aircraft and engine instruments. (If any of the components listed are overhauled on an “on condition" overhaul basis, de-

scribe the procedures used to control the continued airworthiness of such components. When maintenance functions are performed by outside agencies, copies of the maintenance agreement regarding the extent of such services to be furnished should be attached to the application, as provided for in subparagraph (a) (2) of this section. The agreement should specify that services furnished should conform to the standards approved for the operator, the air carrier operations specifications, aircraft maintenance and complies with all requirements of the Civil Air Regulations. C. Indicate and define the type of maintenance operations (overhauls, inspections, and checks) that will be accomplished at each terminal, intermediate and overnight stop, relative to the following: 1. Disassembly and overhaul of aircraft components, engines, propellers, instruments, and accessories (aircraft and engine). 2. Periodic inspection and check of aircraft components, engine, propellers, instruments, and accessories (aircraft and engine). 3.

Routine inspection of aircraft components, engines, propellers, instruments, and accessories (aircraft and engine). 4. Spare part and component replacements at intermediate and overnight stops. 5. Refueling. D. Indicate the number of certificated, noncertificated airmen (repairmen/mechanics), and helpers, etc., including their company designation (foreman, inspectors, crew chiefs, etc.) located at the main overhaul base and each terminal and intermediate stop. E. Indicate the distribution of the following items of spare equipment : 1. Aircraft (list quantity, make and model). 2. Engines (list quantity, make and model). 3. Propellers (list quantity, make and model). 4. Instruments (list quantity, make and model). F. For each terminal, and intermediate stop at which refueling operation will be performed, described the following :

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

1. Number, type (elevated or underground) and capacity of each fuel and oil storage tank. 2. List octane ratings of fuels available. 3. List SAE rating or viscosity of oil available. 4. List facilities and methods for the detection and prevention of fuel contamination. 5. Outline method and procedure with reference to recording water checks. 6. Type of covered container used to convey oil from storage tank to aircraft. 7. Outline method and procedure of grounding aircraft in protection of fire. G. For each terminal and intermediate stop, describe the following facilities: 1. Hangars and/or work docks provided for the protection from the elements for aircraft and personnel performing maintenance operations: a. Number, size and type. b. Dimensions and number of square feet available for aircraft storage. e. Dimensions and number of square feet available for shop space. d. Dimensions of hangar doors and/or capacity of work docks. e. Number of largest sized aircraft of applicant which may be housed. 2.

Equipment for ground handling of aircraft, as may be required for the proposed operation. 3. Tools, fixtures, test equipment and other necessary shop apparatus necessary for the maintenance operations performed. SECrioN VIII. Maintenance: Electrical and Electronic Equipment. A. Briefly, describe the functional operation of the electrical/electronic maintenance organization, indicating the number and scope of responsibility of supervisory personnel and the number and distribution of qualified mechanies and inspectors. Indicate the number, company designation (foreman, inspectors, lead men, etc.) and location of all certificated airmen (eertificated repairmen or certificated mechanics) who are directly in charge of electrical/electronic maintenance activities. B. Indicate the following with respect to aireraft radio equipment maintenance procedures:

1. Overhaul or bench check periods of aircraft radio equipment and station at which accomplished. 2. Periodic inspection and check periods of aircraft radio equipment and stations at which accomplished. 3. Equipment replacement at intermediate and overnight stops. C. Indicate whether overhaul, periodic inspection and routine inspection of aircraft electrical equipment are under the jurisdiction of the radio maintenance department or other department such as aircraft, engine or accessories maintenance department. D. Indicate the following with respect to aircraft electrical equipment procedures: 1. Overhaul or bench check periods of aircraft electrical equipment and stations at which accomplished. 2. Periodic inspection and check periods of aircraft electrical equipment and stations at which accomplished. 3. Routine inspection periods of aircraft electrical equipment and stations at which accomplished. E. Indicate the distribution of the following items of spare equipment: 1. Radio equipment (list quantity, make and model). 2. Electrical equipment (list quantity, make and model). 3.

Other electronic equipment (list quantity, make and model). F. If “on conditions" overhaul of electrical/ electronic is utilized, describe the bench check or major inspection procedures used to control performance tolerances and fixed period overhaul of components subject to wear and deterioration as a function of time in service. (c) Operations Specifications. The operations specifications proposed by the carrier as required by section 40.18 of this part applicable to the intended operation shall be attached to the above letter of application for an air carrier operating certificate. (See sec. 40.18–1. (Published in 18 F.R. 8676, December 24, 1953, effective January 1, 1954. 40.13 Issuance of certificate. (a) An air carrier operating certificate shall be issued by the Administrator to an

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

applicant having a certificate of public convenience and necessity issued by the Civil Aeronautics Board when the Administrator finds, after investigation, that such person is properly and adequately equipped and able to conduct a safe operation in accordance with the requirements of this part and with the operations specifications authorized in this part. (b) Whenever, upon investigation, the Administrator finds that the general standards of safety required for air carrier operations in airplanes of 12,500 pounds or less maximum certificated take-off weight, or for air carrier operations conducted pursuant to a temporary authorization issued under Title IV of the Federal Aviation Act of 1958, as amended, require or permit a deviation from any specific requirement for a particular operation or class of operations for which an application for an air carrier operating certificate has been made, he may issue operations specifications prescribing requirements which deviate from the requirements of this part.

40.14 Amendment of certificate. (a) The Administrator shall, after notice and opportunity for hearing to the carrier concerned, amend an air carrier operating certificate when he finds that such amendment is reasonably required in the interest of safety. (b) Upon application by an air carrier the Administrator shall amend an air carrier operating certificate when he finds that the general standards of safety permit such an amendment. 40.15 Display of certifcate. The air carrier operating certificate shall be available at the principal operations office of an air carrier for inspection by any authorized representative of the Board or the Administrator. 40.16 Duration of certificate. (a) An air carrier operating certificate shall remain in effect until termination of the certificate of public convenience and necessity or other economic authorization issued by the Board held by the air carrier, or until surrendered, suspended, revoked, or

otherwise terminated by order of the Administrator. After suspension or revocation it shall be returned to the Administrator. (b) Nothing in this section shall be construed to deny or to defeat the jurisdic ion of the Federal courts, the Administratoi, or the Board to impose any authorized sinction, including revocation of the certificate, for a violation of the Federal Aviation Act of 1958, as amended, regulations in this subchapter, or the air carrier operating certificate occurring during the effective period of such certificate. 40.17 Transferability of certificate. An air carrier operating certificate is not transferable, except with the written consent of the Administrator. 40.18 Operations specifications required. (a) No person subject to the provisions of this part shall operate as an air carrier without, or in violation of, operations specifications issued by the Administrator. (b) New or amended specifications shall be issued by the Administrator for operations subject to this part in a form and manner prescribed by him and in accordance with the provisions of this part.

40.18–1 Original issuance and amendment of operutions specifications (FAA rules which apply to sec. 40.18 (a)). (a) Original issuance of operations specifications. The air carrier's original application for the issuance of operations specifications shall be included with its letter of application for an air carrier operating certificate (see sec. 40.12-1 of this part). Details concerning appropriate forms, number of copies, etc., will be furnished either by the local FAA Air Carrier District Office or by the FAA Regional Office having jurisdiction over the area in which the air carrier will establish its principal operations base. (b) Amendment of operations specifications. Applications to amend operations specifications shall be submitted by the air carrier to the appropriate local Aviation Safety Agent at least 15 days prior to the proposed effective date of such amendment, unless the Aviation Safety Agent approves a shorter filing period. The information required by section 40.12-1 of this part in connection with the original applica-

12 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

12 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

tion for an air carrier operating certificate shall, of the air carrier. Approval or disapproval insofar as applicable, be furnished in support shall be indicated on the first and second copies of an application to amend an air carrier's of the application and attachments which will operations specifications. be returned to the air carrier. The air carrier (Published in 18 F.R. 8678, December 24. 1953, effec- shall, in turn, indicate receipt in the space tive January 1, 1954.) provided on the second copy and return it to 40.18–2 Form of application for issuance of the assigned agent. initial or revised Operations Specifications, (Published in 18 F.R. 8678, December 24, 1953, effee- Aircraft Maintenance (FAA rules which apply tive January 1, 1954.) to sec. 40.18(a)). Applications by the air car- 40.18–3 Form of application for issuance of rier for new or amended Operations Specifica- initial or revised Operations Specifications, tions, Aircraft Maintenance, shall be made on Aircraft Weight and Balance Control (FAA Operations Specifications Form ACA-1014 or rules which apply to sec.

40.18(a)). equivalent. (a) Applications by the air carrier for new Those pages of the Operations Specifications, or amended Operations Specifications, Aircraft Aircraft Maintenance, which contain the list Weight and Balance Control,2 shall be made on of aircraft components, inspections, checks and Operations Specifications Form ACA-1014 or overhauls, and time limitations therefor, shall equivalent. be prepared by the air carrier on a Form ACA- (b) Four copies of the application shall be 1014 or equivalent. Such pages shall be pre- submitted, the first copy of the application pared to permit insertion in a suitable loose- bearing the signature of a duly authorized repleaf binder. Each page shall be consecutively resentative of the air carrier. Approval or disnumbered and identified as an Operations approval of the carrier's application shall be Specification, Aircraft Maintenance. indicated on the first and second copies of the The air carrier shall list the aircraft compo- application which will be returned to the air nents and the overhauls, inspections, checks, carrier.

The air carrier shall, in turn, indicate and time limitations therefor either on separate receipt in space provided on the second copy pages in the Operations Specifications, Aircraft. and return it to the assigned agent. Maintenance, or together on the same pages. (Published in 18 F.R. 8678, December 24, 1953, effee- If listed separately, the overhauls, inspections, tive January 1, 1954.) and checks shall be appropriately and thor- 40.184 Policies, procedures, and limitations oughly identified, by number and/or nomen- governing issuance and amendment of Operaclature, to include any applicable abbreviations. tions Specifications, Aircraft Maintenance The list of individual aircraft components shall (FAA policies which apply to sec. 40.18(a)). show proper reference to the overhauls, inspee- (a) General. The Administrator will issue tions or checks by means of the applicable num- and amend Operations Specifications, Aircraft ber, nomenclature or abbreviation thereof.

Maintenance, in accordance with the following When so listed, it shall mean that such compo- policies, procedures, and limitations. The crinents are overhauled, inspected, or checked at teria hereinafter set forth will be followed by times identified in Operations Specifications. the Administrator in fixing time limitations for Four copies of the application1 and attach- the performance of overhaul, inspections, and ments shall be submitted to the assigned agents, checks, or in permitting or requiring revisions

the first copy of the application bearing the signature of a duly authorized representative thereto. The basic principle followed by the Administrator will be that the inspections, checks, maintenance, or overhaul be performed

1 Applicatilon for Initial time limitations applicable to new at times well within the expected or proven aireraft, engines, propellers or appliances. not previously used in air carrier service may require Washington concurrence 2The Operations Specifications, Alrcraft Weight and Balprlor to final issuance by the FAA regional office and there- ance Control. may combine weight control procedures common fore should be submitted as soon as possible. but not later to more than one aircraft or they may separate weight and than 15 days prior to the date that the aircraft or component balance procedures specifcally adapted to a particular aircraft is to be placed into service. type and model.

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

service life of each component of the aircraft. In determining what the expected or proven service life of an aircraft or any of its components might be, the Administrator will consider the following factors: (1) geographical area or areas of operation; (2) engine operating powers, procedures, etc.; (3) number of landings, long haul versus short haul, etc.; (4) maintenance organization and inspection procedures; (5) other operators’ service experience records; (6) manufacturers’recommendations; (7) service history, particularly of known or evident trends toward malfunctioning. Special reliance will be placed on service experience, including the information obtained from such tests, inspections, or measurements as have been performed in accumulating such service experience. (b) Procedure for establishing new or revised time limitations. Time limitations may be established in terms of hours of operation, multiples of engine overhaul periods or multiples of inspection periods.

Time limitations for components on which deterioration is not necessarily a function of operating hours, such as electronic units, pitot tubes, and emergency flotation equipment, may be established in terms of calendar months. Certain items may be maintained on an “on condition" overhaul basis. “On condition" overhaul is applicable to components on which a determination of airworthiness may be made by visual inspection, measurements, tests, or other means without a teardown inspection or overhaul. (c) Airframe—Initial time limitations. The initial time limitations for overhauls, inspections, or checks of airframes may be established on a recurrent fixed time basis or by adoption of a structural inspection specification covering procedures such as pattern inspections, block overhauls, or progressive inspections. Regardless of the basis upon which the time limitations are established, the same basic standards will be applicable.

The maintenance program must specify checks, inspections, and overhauls to be performed and times at which they will be performed. (d) Applicances—Initial time limitations. Initial time limitations for inspections, bench checks, major inspections, or overhaul, as applicable, to the appliance involved, should not

be greater than those limitations applicable to the same or similar appliances used in existing aircraft operated by the air carrier. When the usage or installation of such appliances differs to a substantial extent from the previous usage or installation, the time limitations shall be adjusted to reflect the extent of such difference. When new usage or installation is involved, conservative time limitations should be established until service experience shows that more liberal time limits can be used. In those cases where an appliance has a subcomponent which is subject to wear with time in service, the air carrier will establish maintenance procedures for periodic inspection of such subcomponent to insure its continued airworthiness. (e) Powerplants—Initial time limitations. The initial overhaul time limitations for any engine which has never been used in air carrier service will tentatively be established at 1,000 hours.

However, the operations specifications will require sample overhaul of a representative number of engines, but not less than three, to be accomplished at each increment of 100 hours, beginning at 800 hours, unless such new model engine incorporates certain unconventional features not previously employed in air carrier operations, in which case, the initial overhaul period will be established by the Administrator. Satisfactory teardown inspection will be necessary before increasing the fleet overhaul period to the next higher increment. This sample overhaul procedure and evaluation of service experience will provide the operator with necessary information to substantiate the basic 1,000hour overhaul. The initial time limitations for overhaul of an engine model which has received substantial air carrier service experience, but not by the applicant, will tentatively be established at 1,000 hours.

An engine model will not be considered as having substantial air carrier service experience unless it has been satisfactorily operated by another carrier on an approved 1,000-hour or higher overhaul period. However, the operations specifications will require that the basic 1,000-hour overhaul period be substantiated on the same basis as outlined for a new engine except that sample overhauls of a representative number of engines will be accomplished in increments of 100-hour periods beginning at 900 hours. The initial time limitations

14 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

14 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

for overhaul of accessories which are a part of der currently approved time limitations. If, the power package, including propellers, will be after disassembly and inspection of the exhibit established at the overhaul period fixed for the engines and related components, it is found engine itself, unless service experience permits that the new time limitations are justified, the or requires higher or lower overhaul periods. air carrier may then submit a formal applica- (f) Revision of time limitations—General. tion for an amendment in the routine manner The inspection and overhaul time limitations requesting the extension of the overhaul period applicable to airframes, powerplants, propel- on the entire fleet of engines and related comlers, and appliances will be revised on the basis ponents of the same type and model. Engine of service experience.

Increases in such time accessories may be operated to double or triple limitations may be made when the record of the approved engine overhaul time limitations service experience for the previous 90 days if it is found that previous satisfactory service indicates that such increase will not adversely and overhaul experience, including the service affect the continuous condition of airworthi- to be performed at each engine change period, ness. When the service records indicate that would justify the increase as not adversely any component or subcomponent consistently affecting the continuous condition of airworthirequires repair, adjustment, or other mainte- ness of the component involved. The procedure nance because of damage, wear, or deteriora- for requesting and granting increases in overtion, within the current time limitations, the haul time limitations for such components will air carrier will be responsible for initiating be the same as used for the basic engine. corrective action. (3) Appliances, general—Revision of time (1) Airframe—Revision of time limita- limitations.

Increases in established times for tions. The increases of time limitations for inspections, bench tests, or overhaul periods will overhaul (or major inspection in case of pattern be based on consideration of the following facsystem, etc.) of airframes will be based on eval- tors: (i) geographical area or areas of operauation of all pertinent service records and ex- tion ; (ii) number of landings, long haul versus amination of at least one aircraft, of the model short haul; (ii) maintenance organization and involved, that has been overhauled at the inspection procedures; (iv) manufacturers' reccurrently approved time limitations. When a ommendations; (v) service history, particupattern or block overhaul type of maintenance larly of known or evident trends toward malsystem is used, it will be permissible to resched- functioning.

When electrical/electronic appliul individual items in another block or pattern, ances are overhauled on an on condition basis, if performance and condition of the specific special consideration will be given to the conitem warrants such an increase. tinued airworthiness of mechanical components (2) Powerplant and associated mechanical of such equipment. appliances—revision of time limitations. In- (4) Emergency equipment. The inspeccreases in engine overhaul periods will not be tion periods for first aid kits, flotation equipapproved in increments greater than 100 hours. ment, and other emergency equipment will as- Increases in time limitations above the 1,000- sure the continued serviceability and immedihour basic engine overhaul period will be con- ate readiness of such equipment. for its intended sidered on the basis of satisfactory service emergency purposes. Major inspection periods experience at the currently approved time limi- will be established for the purpose of determintations.

The operator may request amendment ing that all components of the emergency equipto the currently approved time limitations by ment are complete and airworthy and may be submitting a letter to the assigned FAA agent expected to remain in this condition until the indicating the desired time limitations on the next major inspection or actual use under emerparticular engines involved, and designating gency conditions. Routine inspection periods three to five engines for disassembly inspection will be established to assure that such equipby the FAA agent. The engines chosen for ment (or any component thereof) is installed or exhibit must have operated in a satisfactory stored properly, has not been tampered with, manner for the maximum time permissible un- damaged, or had articles removed since the last

CAM 40 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

CAM 40 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

inspection. All inspection periods will be adjusted in accordance with service experience and pertinent operating conditions. (Published in 18 F.R. 8607, December 22, 1953, effective January 1, 1954; amended in 19 F.R. 7081, October 30, 1954, effective November 15, 1954.) 40.19 Contents of specifications. The operations specifications shall contain the following: (a) Types of operations authorized; (b) Types of airplanes authorized for use; (c) En route authorizations and limitations; (d) Airport authorizations and limitations; (e) Time limitation for overhauls, inspections, and checks of airframes, engines, propellers, and appliances, or standards by which such time limitations shall be determined ; (f) Procedures used to maintain control of weight and balance of airplanes; (g) Interline equipment interchange requirements, if pertinent; and (h) Such additional items as the Administrator determines, under the enabling provisions of this part, are necessary to cover a particular situation.

40.19-1 Content of Operations Specifications, Aircraft Maintenance (FAA policies which apply to sec. 40.19(e)). The Administrator will issue Operations Specifications, Aircraft Maintenance, which have the following minimum contents: (a) The Operations Specifications, Aircraft Maintenance, will contain a listing of the components of airframes, engines, propellers, and appliances, and the time limitations for checks, inspections and overhauls applicable to each listed component. The list of components will be complete and inclusive except that subcomponents which are subject to check, inspection, and overhaul at the same time limitations as the components to which they are related may be omitted from the listing (e.g., that form commonly called the “short form"). When this is done, the operations specifications will bear a statement to the effect that parts and subcomponents not listed will be checked, inspected, and overhauled at the same time limitations

specified for the component or assembly to which such components are related.

When coded identifications or titles, such as “operation #1, #2, #3, etc." or “line check, intermediate check, base inspection, etc.," are used in connection with specified time limitations in the operations specifications, a brief description of such terms will be included which identifies the operation concerned. (b) If the carrier proposes Operations Specifications, Aircraft Maintenance, which would permit for all or any part of an aircraft a block overhaul system, a sampling inspection and overhaul system, or any other maintenance system which either (1) does not prescribe a fixed period for overhaul, inspection, or check of each component of an aircraft, or (2) includes alternative standards and procedures under which the air carrier may be given authority to establish and adjust such time limitations, the air carrier will fully define and describe the manner in which such a special maintenance program will be performed. (c) Operations specifications identified as Operations Specifications, Aircraft Maintenance—General, will contain conditions uniformly applicable to all

Operations Specifications, Aircraft Maintenance. (Published in 18 F.R. 8609, December 22, 1953, effective January 1, 1954. 40.19–2 Content of Operations Specifications, Aircraft Weight and Balance Control (FAA policies which apply to sec. 40.19(f)). The Operations Specifications, Aircraft Weight and Balance Control, as submitted by an air carrier, will contain an accurate description of the procedures used to maintain control of weight and balance of all aircraft operated under the terms of the operating certificates which will insure that the aircraft, under all operating conditions, is loaded within the gross weight and center of gravity limitations. This description should include procedures used for determining weight of passengers, weight of baggage, periodic aircraft weighing, type of loading devices, and identification of aircraft concerned. (Published in 18 F.R. 8609, December 22, 1953, effective January 1, 1954.)

16 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

16 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

40.20 Utilization of operations specifica- shall not require actual flight over a route or tions. The air carrier shall keep its person- route segment, if the air carrier shows that nel informed with respect to the contents of such flight is not essential to safety. The the operations specifications and all amend- air carrier may thereafter conduct operaments thereto applicable to the individual's tions between regular, provisional, or reduties and responsibilities. A set of specifi- fueling airports on any approved route or cations shall be maintained by the air carrier routes on which the operational facilities and as a separate and complete document. Per- procedures are substantially similar: Protinent excerpts from the specifications or vided, That high-altitude VFR operations references thereto shall be inserted in the may be conducted over any route. manual issued by the air carrier. 40.30–1 Route requirements; demonstration 40.21 Amendment of operations specifica- of competence (FAA policies which apply to tions. Any operations specification may be sec. 40.30).

In determining the competence of amended by the Administrator if he finds an air carrier to operate over a route or route that safety in air transportation so requires segment, the Administrator will require the or permits. Except in the case of an emer- carrier to show that it can conduet the proposed gency requiring immediate action in respect operation in compliance with the applicable to safety in air transportation or upon con- provisions of the Civil Air Regulations and the sent of the air carrier concerned, no amend- air carrier's operations specifications. The ment shall become effective prior to thirty Administrator's determination may be based on days after the date the air carrier has been a proving flight or, in a proper case, a deternotified of such amendment. mination may be based on written justification 40.22 Inspection authority. An author- from the carrier as to why a proving flight is ized representative of the Administrator unnecessary.

The Administrator's determinashall be permitted at any time and place to tion in any event will be predicated upon the make inspections or examinations to deter- adequacy of the facilities provided by or availamine an air carrier's compliance with the ble to the air carrier including, but not limited requirements of the Federal Aviation Act of to aircraft, airports, lighting facilities, mainte- 1958, as amended, the regulations in this sub- nance facilities, communication and navigation chapter, the provisions of the air carrier's facilities, fueling facilities, ground and aircraft operating certificate, and the operations radio facilities, and the competency of personspecifications. nel to be used in the proposed operation. 40.23 Operations and maintenance base (Published in 18 F.R. 6615, October 17, 1953, effecand office. Each air carrier shall give writ- tive January 1, 1954.) ten notice to the Administrator of his princi- 40.30–2 Proving flight requirements (FAA pal business office, his principal operations policies which apply to sec.

40.30). base, and his principal maintenance base. (a) A pplication. When the Administrator Thereafter, prior to any change in any such has determined that a route proving flight is office or base, he shall give written notice to necessary, the carrier shall comply with the folthe Administrator. lowing: At least 15 days prior to the scheduling of route proving flights, officials of the air Requirements for Services and Facilities carrier shall submit to the Federal Aviation 40.30 Route requirements; demonstration Agency office handling its operations specificaof competence. The air carrier shall show tions, a written request for the assigment of that it is competent to conduct scheduled Federal Aviation Agency personnel to observe operations over any route or route segment the fights.

This request must be accompanied between any regular, provisional, or refuel- by an original application and copies of pertiing airport and that the facilities and nent proposed amendments to the operations services available are adequate for the type specifications, and must include sufficient data of operation proposed. The Administrator pertaining to the route to satisfy the Adminis-

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

trator that the air carrier is prepared for the route proving flights. This will allow sufficient time for making any necessary additions or corrections, thus preventing delays or misunderstandings. (b) Conduct. After the air carrier has made all the necessary preparations to conduct the route proving flights, duly designated representatives of the Federal Aviation Agency will be assigned to observe them. All route proving flights shall be undertaken exactly as the operator intends to operate in scheduled air transportation when carrying passengers, property, or mail, or any combination thereof. Air carrier personnel assigned to conduct the route proving flights shall be regular crew members who, it is anticipated, will be assigned to the route. (c) Duration. Route proving flights shall continue until the air carrier has demonstrated to the satisfaction of the Administrator that it is competent to conduct a safe operation over the entire route to be flown in air transportation.

(Published in 18 F.R. 6615, October 17, 1953, effective January 1, 1954.) 40.31 Width of routes. A route or route segment shall include the navigable airspace on each side of an approved course or courses, and it shall have a width designated by the Administrator consistent with terrain, available navigational aids, traffic density, and air traffie control procedures: Provided, That for high-altitude VFR operations courses need not be approved and the width of navigable airspace on each side thereof need not be designated by the Administrator. 40.32 IFR routes outside of control areas. IFR routes outside of control areas shall be approved if the air carrier shows that the navigational and communications facilities are adequate for the operations proposed, unless the Administrator finds that because of traffic density an adequate level of safety cannot be insured in a particular area: Provided, That IFR routes outside of control areas shall not be approved for high-altitude operations. 40.33 Airports. The air carrier shall show that each route has sufficient airports found by the Administrator to be properly

equipped and adequate for the type of operations to be conducted. Consideration shall be given to items such as size, surface, obstructions, facilities, public protection, lighting, navigational and communications aids, and traffic control. 40.33-1 Airports (FAA policies which apply to sec. 40.33,. An airport shall be deemed as properly equipped and adequate; when it meets the following minimum standards: (a) Size. The landing area shall be of sufficient length to permit compliance with the airplane performance operating limitations of the transport category or nontransport category requirements of this part appropriate to the type of aircraft used. (b) Surface. The landing area and taxiway areas shall be clearly defined. They may be unpaved or hard surfaced or a combination of both. These areas shall be sufficiently smooth and firm to permit an airplane of the type used to traverse them safely. Shoulders of runways and taxiways shall be graded to the extent that they will not constitute a hazard to the aircraft operating thereon. (c) Obstructions.

Obstructions on and in the vicinity of the airport shall be obstruction marked and lighted as applicable for day or night operations. In determining obstructions to air navigation, the criteria contained in Federal Aviation Agency Technical Standard Order N-18 will be used, insofar as practicable. (d) Facilities. (1) At each airport utilized, whether reports prepared from observations made and released by the U.S. Weather Bureau or a source approved by it shall be available. (2) Ramp equipment such as battery carts, fire bottles, loading stands, steps, etc., must be provided and shall be suitable to service the type aircraft being utilized. (3) Satisfactory means of determining wind direction for day and/or night operations shall be provided, i.e., tetrahedron, wind tee, control tower, remote microphone, ete. (e) Public Protection. Safety measures for the protection of the public shall be provided at each airport utilized. Such measures shall be designated to restrict unauthorized personnel and vehicles from the loading ramp, runways,

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

taxiways. etc. They may consist of fences, gates, chains, airport guards, etc., so long as they are sufficient to accomplish the intended result. (f) Lighting. At airports where night operations are conducted. the minimum facilities and equipment shall be required as follows: (1) Lights defining the boundaries of the usable area ineluding threshhold lights and/or runway lights identifying the outer limits of the runways including threshhold lights as prescribed in Federal Aviation Agency Technical Standard Order N-1b. Lights of the open flame type (flare pots) are not considered satisfactory runway lights except in an emergency or when required by other extenuating circumstances. (2) Lights either of a permanent or portable type shall be provided and operated to illuminate the ramp, apron, and passenger loading area. (3) Obstructions on and in the vicinity of the airport shall be obstruction lighted insofar as practicable in accordance with the eriteria contained in Federal Aviation Ageney Obstruetion Marking Manual.3 (4) An airport beacon either of a rotating or combination of rotating beacon and flashing code beacon shall be provided and operated continuously from sunset to sunrise. In this respect, the criteria contained in Federal Aviation Agency Technical Standard Order N-19 shall apply. (g) Navigation, Communication Aids and Traffe Control. These facilities shall be suitable for the type of operations to be conducted. (Published in 18 F.R. 6615, October 17, 1953 ; amended 18 F.R. 6732, October 23, 1953. effective January 1, 1954.)

40.34 Communications facilities. The air carrier shall show that a two-way airground radio communication system is available at such points as will insure reliable and rapid communications under normal operating conditions over the entire route, either direct or via approved point-to-point circuits for the following purposes:

ligbting eriterla. sTSO N-2a, when poblished, will contain the obstruetlon

(a) Communications between airplanes and the appropriate dispatch office, in which case such systems shall be independent of systems operated by the Federal Government, and (b) Communications between airplanes and the appropriate air traffic control unit, in which case the Administrator may permit the use of communications systems operated by the Federal Government. 40.34–1 Communications facilities required for air route traffie control (FA A policies which "pply to sec. 40.34(b)). The communications system used by the air carriers should consist of air-ground radiotelephone facilities and point-to-point radio or landline facilities. Point-to-point comnmunication facilities used between a ground office or communication station of an air carrier and air route traffie control should be a direct interphone or a telephone or other facility approved by the Administrator. Upon prior notification of an air carrier, the Administrator may permit the use of FAA communications facilities on a regular basis for the handling of air route traffic control messages.

Direct pilot-to-controller r a d i o communications may be used on a regular basis by an air carrier without notification to the Administrator for such use. When an air carrier conducts operations through an air route traffic control center area in which a landing is not made, and in which there is nq FAA or non-goverment airground radio communication system used on a regular basis, the air carrier should provide adequate direct interphone service, with priority given to the handling of air route traffic control messages, between the appropriate nongovernment air-ground radio station and the appropriate air route traffic control units.

(Published in 19 F.R. 2801, May 15, 1954.) 40.35 Weather reporting facilities. The air carrier shall show that sufficient weather reporting services are available along the route to insure weather reports and forecasts necessary for the operation. Forecasts used to control flight movements shali be prepared from weather reports furnished in accordance with paragraphs (a) and (b) of this section as appropriate.

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

(a) For operations within the continental limits of the United States, weather reports used to control flight movements shall be those prepared by the U.S. Weather Bureau, or by a source approved by the Weather Bureau. (b) For operations authorized in accordance with section 40.1 to be conducted outside the continental limits of the United States, weather reports used to control flight movements may be those prepared by any source approved by the Administrator. 40.36 En route navigational facilities.

The air carrier shall show that nonvisual ground aids to air navigation are available along each route, that they are so located as to permit navigation to any regular, provisional, refueling, or alternate airport within the degree of accuracy necessary for the operatíon involved, and that they are available for the navigation of airplanes within the degree of accuracy required for air traffic control: Provided, That no nonvisual ground aids to navigation are required for day VFR operations where the characteristics of the terrain are such that navigation can be conducted by pilotage, or for night VFR operations along lighted airways or on routes where the Administrator has determined that reliably lighted landmarks are adequate for safe operations. 40.37 Servicing and maintenance facilities.

The air carrier shall show that competent persónnel and adequate facilities and equipment, including spare parts, supplies, and materials, are available at such points along the air carrier's routes as are necessary for the proper servicing, maintenance, repair, and inspection of airplanes and auxiliary equipment. 40.37-1 Servicing and maintenance facilities (FAA policies which apply to sec. 40.37). (a) General. In demonstrating or proving to the satisfaction of the Administrator that housing, facilities, equipment, and materials are adequate, the air carrier may be guided by Civil Aeronauties Manual 52, section 52.21 and sections 52.30 through 52.36, insofar as applicable to his aircraft and maintenance system.

(b) Facilities provided by other agencies. The air carrier will be required to show that agencies contracting to perform major overhauls, repairs, or alterations for the air carrier are those specified under section 18.10 (b), (d), or (e) of this subchapter. (Published in 18 F.R. 8609, December 22, 1953, effective January 1, 1954.) 40.38 Location of dispatch centers. The air carrier shall show that it has a sufficient number of dispatch centers adequate for the operations to be conducted and located at such points as are necessary to insure the proper operational control of each flight.

Manual Requirements

40.50 Preparation of manual. The air carrier shall prepare and keep current a manual for the use and guidance of flight and ground operations personnel in the conduct of its operations. 40.51 Contents of manual. (a) The manual shall contain instructions, information, and data necessary for the personnel concerned to carry out their duties and responsibilities with a high degree of safety. It shall be in a form to facilitate easy revision, and each page shall bear the date of the last revision thereof. The contents of such manual shall not be contrary to the provisions of any Federal regulations, operations specifications, or the operating certificate. The manual may be in two or. more separate parts (e.g., flight operations, ground operations, maintenance, communications, etc.) to facilitate use by the personnel concerned, but each part shall contain so much of the information listed below as is appropriate for each group of personnel: (1) General policies; (2) Duties and responsibilities of each crew member and appropriate members of the ground organization; (3) Reference to appropriate regulations in this subchapter and Civil Aeronautics Manuals; (4) Flight dispatching and control; (5) En route flight, navigation, and communication procedures, including pro-

20 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

20 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

cedures for the dispatch or continuance of (18) Inspections for airworthiness, inflight, if any item of equipment required for cluding instructions covering procedures, the particular type of operation becomes in- standards, responsibilities, and authority of operative or unserviceable en route; the inspection personnel; (6) Appropriate information from the (19) Methods and procedures for mainen route operations specifications, including taining the airplane weight and center of for each approved route the types of air- gravity within approved limits; planes authorized, their crew complement, (20) Pilot and dispatcher route and airthe type of operation (i. e., VFR, IFR, day, port qualification procedures; night) and other pertinent information; (21) Accident notification procedures; (7) Appropriate information from the and airport operations specifications, including (22) Other data or instructions related for each airport its location, its designation to safety. (i.e., regular, alternate, provisional, ete.), (b) At least one compìete master copy of types of airplanes authorized,

instrument the manual containing all parts thereof shall approach procedures, landing and take-off be retained at the appropriate operations minimums, and other pertinent information; base of the air carrier. (8) Take-off, en route, and landing 40.51–1 Contents of manual—Methods and weight limitations; procedures for maintaining weight and balance (9) Procedures for familiarizing pas- control (FA A policies which apply to sec. 40.51 sengers with the use of emergency equip- (a) (19)). ment during flight; (a) General.

The air carrier may utilize (10) Emergency procedures and equip- any loading schedule, procedure, or means by ment; which the air carrier can show that the aircraft (11) The method of designating succes- is properly loaded and will not exceed authorsion of command of flight crew members; ized weight and balance limitations during (12) Procedures for determining the operation. usability of landing and take-off areas and By whatever method used, the air carrier for dissemination of pertinent information should account for all probable loading condito operations personnel; tions which may be experienced in service and (13) Procedures for operation during show that the loading schedule will provide periods of icing, hail, thunderstorms, turbu- satisfactory loading. Loading schedules may lence, or any potentially hazardous meteor- be applied to individual aircraft or to a comological conditions; plete fleet. Unless otherwise authorized, a copy (14) Airman training programs, in- of pertinent loading data should be carried in cluding appropriate ground, flight, and each aircraft.

When an air carrier operates emergeney phases; several types or models of aircraft, the loading (15) Instructions and procedures for schedule, which may be index type, tabular maintenance, repair, overhaul, and serv- type, or a mechanical computer, will be identiicing; fied with the type or model of aircraft for which (16) Time limitations for overhaul, in- it is designed. spection, and checks, of airframes, engines, (b) Loading provisions. All seats, compropellers, and appliances, or standards by partments, and other loading stations will be which such time limitations shall be deter- properly marked, and the identification used mined; will correspond with the instructions estab- (17) Procedures for refueling airplanes, lished for computing the weight and balance of elimination of fuel contamination, protec- the aircraft.

When the loading schedule protion from fire including electrostatic protec- vides blocking off of seats or compartments in tion, and the supervision and protection of order to remain within the center of gravity passengers during refueling; limits, effective means will be provided to as-

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES

sure that such seats or compartments are not occupied during operations specified. Cargo compartments will be placarded showing the maximum weight of each compartment, and such placards will be readily legible to the loading personnel. Instructions will be prepared for crew members, cargo handlers, and other personnel concerned, giving complete information necessary regarding distribution of passengers, argo, fuel, and other items. Information relative to maximum capacities and other pertinent limitations affecting the weight or balance of the aircraft will be included in these instructions. When it is possible by adverse distribution of passengers to exceed the approved CG limits of the aircraft, special instructions will be issued to the appropriate crew members so that the load distribution can be maintained within the approved limitations. (c) Terms, descriptions, and general standards. For the purpose of weight and balance control, the following terms, descriptions, and general standards will apply.

Deviations from these standards by the individual operator due to the nature of his operation will be acceptable. (1) Empty weight. The empty weight of an aircraft is considered to be the maximum gross weight less the following: (i) All fuel and oil, excepting system fuel and oil.a (ii) Drainable antidetonant injector and de-icing fluids. (iii) Crew and baggage. (iv) Passengers and cargo (revenue and nonrevenue). (v) Removable passenger service equipment, food, magazines, ete., including drainable washing and drinking water. (vi) Emergency equipment (overwater, tropical, frigid). (vii) Other equipment, variable for flights. (viii) Flight spares (spark plugs, wheel, cylinder, etc.). (2) Operating weight. The basic operating weight established by the air carrier for a

System fuel and oll is that amount required to fill both systems and the tanks, where applicable, up to the tank outlets to the engines. When oll is used for propeller feathering, such oil is included as system ofl.

particular model aircraft will include the following standard items of the operator in addition to the empty weight of the aircraft unless otherwise specified : (i) Normal oil quantity. (ii) Antidetonant injector and de-icing (winter) fluids. (iii) Crew and baggage. (iv) Passenger service equipment, including washing and drinking water, magazines, etc. (v) Emergency equipment, if required, for all flights. (vi) All other items of equipment considered standard by the air carrier concerned. (3) Aircraft, zero fuel weight. The zero fuel weight of an aircraft is the maximum weight authorized for such aircraft without fuel. The weight of fuel carried in the fuselage, or equivalent locations, will be deducted from such maximum. When zero fuel weight limitations or equivalent restrictions are specified, proper provision for loading will be made by the operator so that such structural limitations are not exceeded. (d) Aircraft weights.

Aircraft weight and balance control will contain provisions for determining aircraft weights in accordance with. the following procedures: (1) Individual aircraft weights and changes. The loading schedule may utilize the individual weight of the aircraft in computing pertinent gross weight and balance. The individual weight and balance of each aircraft will be reestablished at the specified reweighing periods. It also will be reestablished whenever the accumulated changes to the operating weight exceeds plus or minus one-half of 1 percent of the maximum landing weight or the cumulative change in CG position exceeds onehalf of 1 percent of the MAC. (2) Fleet weights, establishment and changes. For a fleet or group of aircraft of the same model and configuration, an average operating fleet weight may be utilized if the operating weights and CG positions are within the limits established herein. The fleet weight will be calculated on the following basis: (i) An operator's empty fleet weight will be determined by weighing aircraft according

22 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

22 SCHEDULED INTERSTATE AIR CARRIER CERTIFICATION AND OPERATION RULES CAM 40

to the following table: For fleet of 1 to 3, weigh eligible for air carrier operations without all aireraft: for fleet of 4 to 9, weigh 3 aircraft reweighing if the weight and balance records plus at least 50 percent of the number over 3: have been adjusted for alterations or modificafor fleet of over 9, weigh 6 aireraft plus at least tions to the aircraft. Aircraft transferred 10 percent of the number over 9. from one air carrier to another need not be (ii) In choosing the aircraft to be weighed prior to utilization by the latter unless weighed, the aircraft in the fleet having the more than 24 calendar months have elapsed highest time since last weighing should be se- since last weighing. lected. When the average empty weight and (4) Periodic weighing—aircraft using in- CG position has been determined for aircraft dividual weights.

Aircraft operated under a weighed and the basic operating fleet weight loading schedule utilizing individual aircraft (winter and summer, if applicable) established, weights in computing the gross weight will be necessary data should be computed for aircraft weighed at intervals of 24 calendar months. not weighed but which are considered eligible An air carrier may, however, apply for extenunder such fleet weight. If the basic operating sion of this weighing period for a particular weight of any aircraft weighed or the calculated model aircraft, when pertinent records and basic operating weight of any of the remaining actual routine weighing during the preceding aircraft in the fleet varies by an amount more 24 months of air carrier operation show that than plus or minus one-half of 1 percent of the weight and balance records maintained are suffimaximum landing weight from the established ciently accurate to indicate aireraft weights basic operating fleet weight or the CG position within the established limitations.

Such applivaries more than plus or minus one-half of 1 cation should be limited to increases in increpercent of the MAC from the fleet weight CG, ments of 12 months and will be substantiated in that airplane will be omitted from that group each instance with at least two aircraft weighand operated on its actual or calculatd oper- ings. Increases may not be granted which exating weight and CG position. If it falls ceed a time which is equivalent to the aircraft within the limits of another fleet or group, it overhaul period. may then become part of that operating fleet (5) Periodic weighing, aircraft using "fleet weight. In cases where the aircraft is within weights. Aircraft operating under fleet the operating fleet weight tolerance but the weights should be weighed in accordance with CG position varies in excess of the tolerance procedures outlined for the establishment of allowed, the aircraft may still be utilized under fleet weights.

Since each fleet weight will be the applicable operating fleet weight but with reestablished every 2 years and a specified numan individual CG position. ber of aircraft weighed at such periods, no addi- (ii) Reestablishment of the operator's tional weighing is considered necessary. A empty fleet weight or the operating fleet weight rotation program should, however, be incorpoand corresponding CG positions may be accom- rated so all aircraft in the fleet will be plished between weighing periods by calculation reweighed periodically. based on the current empty weight of the air- (6) Weighing procedure. Normal preeraft previously weighed for fleet weight pur- cautions, consistent. with good practices in the poses.

Continue reading ↓ 120 of 977 passages shown