Radar Vectors
Civil Air Regulation Historical Issued Feb 13, 1961 AIR-600-Policy and Innovation Division 5 pages Copy saved Nov 21, 2026

CAR 57 507 Of Regulations Of The Administrator. Airworthiness Directives. Subpart T -- Taylorcraft, Temco, Timm, E. J. Trytek

This document is historical. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

TAYLORCRAFT

(See Universal for BO Series)

46-36-1 See Continental Engines. should be incorporated; a spacer bushing at 47-16–3 Taylorcraft (Was Mandatory Note least 1/4 x 0.028 x 11/4 inches installed around 11 of AD-700–1; Mandatory Note 12 of AD- the cover plate through bolt is considered satis- 699-1; and Mandatory Note 13 of AD- factory. 696–3.) Applies to All Models BC, BF, and (Taylorcraft, Inc. Service Bulletin 65 covers BL Series Aircraft. this same subject.) Compliance required immediately. Inspect wing strut attachment fittings on 51-9-3 Taylorcraft Applies to All Series lower fuselage longerons for cracks or evidence Aircraft Below Serial Number 13001 Incorof poor weld. If cracks or defects are found, porating a Pushpull Type Fuel Shutoff Conthe fitting should be replaced or reinforced. trol.

50-41-1 Taylorcraft Applies to All Model Compliance required not later than June 1, B Series Aircraft, Serial Numbers 1001 and 1951. Up. To prevent accidental operation of the fuel Compliance required not later than Novem- shutoff valve during flight, a safety device ber 15, 1950. must be installed on this control. The device Reports have been received of interference is to prevent inadvertent operation of the fuel between the elevator horn bolt and the fin shutoff valve by requiring a definite and posicover plate apparently caused by improper tive movement by the pilot before the control field installation of the cover plate through can be operated. Taylorcraft P/N B12–947–3 bolt. Cases are known where the bolt has worn or equivalent is considered satisfactory. P/N through the cover plate and such interference B12–947 which was previously installed in may result in jamming of the elevator control some Taylorcraft airplanes must be replaced system. An inspection of the parts should be by this improved part. made and if evidence of interference is noted, (Taylorcraft Service Bulletin No. 66 dated suitable means of preventing the cover plates December 6, 1950, covers this same subject.) from interfering with the elevator horn bolt This supersedes AD 47–13–1.

TEMCO

49-40-1 Luscombe Applies to All Model 11A Aircraft.

Compliance required on or before the next periodic inspection but not later than December 1, 1949. To preclude the possibility of the elevator trim tab actuating horn becoming disconnected from the trim tab, with consequent serious vibration of the horizontal tail surfaces, it is necessary to rework the attachment of the trim tab horn by adding more rigidity to the attachment. This rework can be accomplished by fabricating two blocks from solid 24ST aluminum alloy that will fit inside the inboard end of the trim tab, one located at the extreme inboard end to which the steel trim tab horn attaches and other one located diagonally chordwise inside the trim tab, with the forward end located approximately 21/2 inches and the aft end approximately 1 inch from the inboard end of the trim tab. These blocks, which actually are equivalent to solid ribs, should be approximately %-inch wide and shaped in elevation to fit the inside contour of the trim tab.

The attachment of these ribs should be effected by four AN 456AD4 rivets in each, drilled on assembly, with the rivets driven through both upper and bottom skins of the trim tab. The trim tab horn should be attached to the trim tab through their regular attaching holes, riveting the horn with two AN 456AD4 rivets to the chordwise end of the inboard revised solid rib and the two remaining holes as originally attached with two AN 456AD4 rivets. The aluminum alloy blocks or ribs should be finished with a protective coating of zinc chromate prior to assembly of the trim tab. An equivalent modification to that described above and in Luscombe Service Bulletin is acceptable. (Luscombe Service Bulletin No. 1-1149, dated January 25, 1949, covers this same subject.)

49-45-1 Luscombe Applies to All Model 11A Aircraft.

Compliance required as soon as possible but not later than next 25 hours operation time and at each 25-hour period thereafter until reinforcement of main landing gear aft canted fuselage bulkhead is accomplished.

Inspect for buckling, cracks or other evidence of failure of permanent set of the main landing gear aft fuselage canted bulkhead in the web and/or flange in the area adjacent to the steel landing gear trunnion and fuel line. Inspect fuselage wing lift strut attach fitting for cracks in the radii of the flanges attaching it to each aft fuselage canted bulkhead. Usually evidence of failure of the aft canted bulkhead can be determined by a crack in the fuselage canted bulkhead web extending from the fuel line hole to the flange attaching the bulkhead to the belly skin and/or buckle in the cabin floor located approximately 1 inch directly aft of the bulkhead under the carpet flooring and/or loose rivets attaching the flange of the canted bulkhead to the belly skin. If the difficulties are not revealed as indicated, a 2-inch hole cut in the cabin floor located approximately 3 inches aft and inboard of that part of the canted bulkhead supporting the door will allow access for detailed examination of the aft side of the rear fuselage canted bulkhead. Removal of seat and floor carpet is necessary to accomplish this inspection.

If loose rivets in the bulkhead flange at the attachment to the belly skin, cracks or permanent set in excess of 1⁄2/8 inch are found in the web of the bulkhead adjacent to the steel trunnion, the bulkhead must either be satisfactorily repaired or replaced. If noticeable permanent set in the web is apparent (under 1⁄2s inch), the web of the bulkhead may be reworked by straightening. If cracks are found in the fuselage wing lift strut attach fitting it should be replaced or the cracks should be stop drilled and the full length of each cracked flange reinforced with a 34 inch by % inch by 0.064 inch 24ST angle.

T-4 TErco

In addition, the following modifications top side to be used for subsequent 25-hour inmust be made: spections, if applicable. A collar must be incorporated on the front Any equivalent structural modification to end of the hinge pin that passes through the preclude a failure, or permanent set in the front and rear main landing gear steel trun- aft canted bulkhead at the attachment of nions which are riveted to the two fuselage the main landing gear trunnion will be concanted bulkheads. This tubular collar should sidered satisfactory. be fabricated of 4230 steel and be at least %-inch long and of sufficient thickness to ef- 50–32–1 See Continental Engines.

fect a snug bearing fit against the forward 51-21-3 Luscombe Applies to Model 11A end of the steel tube composing the socket of Airplanes. the forward steel trunnion. A 1⁄2/4-inch bolt Compliance required prior to 50 hours adshould be used to attach the collar to the hinge ditional flight time and not later than Ocpin using the existing 1⁄2-inch hole in the ex- tober 15, 1951, and each 50 hours thereafter treme forward end of the hinge pin. unless Luscombe P/N 11-5417-D is installed. A curved doubler of 0.064 inch 24ST should Inspect rudder control system bellcrank, be placed over the existing 0.040-inch floor P/N 11-5417, located under forward cabin skin connecting the flanges of the two main floor, for cracks, loose rivets, or deformation. landing gear canted bulkheads.

This doubler If this bellcrank is damaged in any way, it should pick up the existing floor skin and bulk- must be repaired or replaced with the late type, head top flange rivet pattern in the vicinity P/N 11-5417-D. of the landing gear steel trunnion, extending The early type bellcrank may be identified in length at least 3 inches to either side of a by its having four rivets or four AN 3 bolts vertical plane through the centerline of the attaching the center bearing block to the belllanding gear hinge pin and picking up at least crank. The late type bellcrank has 10 rivets six of the existing rivets in each of the canted attaching the center bearing block to the bellbulkheads. Blind type rivets may be used to crank, and this bearing block is longer to acattach this doubler. commodate the added rivets.

The rivet pattern attaching the flange of If the early type bellcrank is installed and the aft canted fuselage bulkhead to the belly is found undamaged, or is repaired and reinskin between the openings in the fuselage stalled, this inspection must be repeated each skin which allow entrance of the main land- 50 hours of flight time. If the late type belling gear legs should be inspected for rivet crank is found to be installed, or is installed to size and pattern. The first 20 rivets inboard replace the early type, only routine maintefrom these openings must be %2-inch A17ST nance inspections are required. spaced approximately 1⁄22-inch apart. In installing either type of bellcrank in the If the 2-inch inspection holes have been cut rudder system, the system must be rigged in in the floor, they must be reinforced by at accordance with Luscombe Airplane Corp., least a 4-inch diameter 0.040-inch 24ST doubler Drawing 11–5402.

Care must be taken not to on the underneath side of the floor skin and overtension the rudder cables, since this overa quick removable inspection cover placed on tensioning can cause failure of the bellcrank.

TIMM

48-32–1 Timm Applies to Models N2T All reinforced as described below, or in an equiv- Serial Numbers, and PT-220-C Aircraft. alent manner. Reinforcements must be in- Compliance required as indicated. stalled not later than January 1, 1949. Instances have been reported of throttle 1. Insert four AN 3 bolts through wood quadrants pulling off the fuselage skin to which they were glued and nailed during man- plate on outboard side of throttle quadrants ufacture. Both front and rear cockpit throttle through support blocks and fuselage skin quadrants must therefore be inspected for using one bolt at each plate corner. Install looseness immediately and if found loose must large flat washers or metal backing plates be repaired prior to the next flight. beneath bolt heads and nuts to avoid crush- This inspection should be repeated fre- ing wood. Loose throttle quadrants should be quently until such time as the throttles are reglued prior to making this reinforcement.

E. J. TRYTEK

E. J. TRYTEK

47-30-8 Aeronca (Was Mandatory Note 9 of AD-675–2 and Mandatory Note 7 of AD- 702–1.) Applies to Models 65-CA, S–65- CA and 65-LA. Compliance required not later than September 30, 1947. In order to prevent the seat belt anchorage from failing during a crash landing, it has been found necessary to modify the seat installation as follows: 1. If there is no need for an adjustable seat, the rear sliding lugs on each side of the

seat should be bolted to the slide tube using %6-inch AN bolts. Location of bolt approximately 11⁄2s inches below and % inch forward of center of seat cross tube. 2. If the seat is to remain adjustable, the rear sliding lugs on the seat are to be reinforced with two 0.094 inch, 1025 steel gussets. Weld corner gussets between fore and aft sides of seat cross tube and back face of seat slide lugs. Gussets are "L" shaped approximately 1 inch wide, extending around bottom lip of lugs. (Aeronca Service Memorandum M-76 dated May 15, 1947, covers this same subject.)