Radar Vectors
Civil Air RegulationText changedNov 21, 2026

CAR 42 Proving Period for Large Aircraft Operated Under the Provisions of Part 42

Text re-read from the scan: 10 of 10 passages.

Date
Nov 21, 2026
Recorded
Nov 21, 2026
Passages
10 of 10 changed
Paragraphs
22 added or rewritten, 37 removed or rewritten

Read the current text Official source ↗

What changed in the text

Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.

  1. Changed

    [removed: FBDERAL][added: 42 FEDERAL] AVIATION AGENCY[removed: FLIGHT STANDARDS SBRVICB]

  2. Changed

    [added: FLIGHT STANDARDS SERVICE ]Washington 25, D. C.

  3. Removed

    [removed: h~/J \ - J' .. -]

  4. February 5, 1962

  5. Changed

    CIVIL AIR REGULATIONS DRAFT [removed: RELEASB][added: RELEASE] NO. [removed: Qc2-5][added: 62-5]

  6. Changed

    [removed: SUBJBCT:][added: SUBJECT:] Proving Period for Large Aircraft Operated Under the Provisions[added: of Part 42]

  7. Removed

    [removed: of Part 42]

  8. Added

    [added: The Flight Standards Service of the Federal Aviation Agency has under consideration amendments to Part 42 of the Civil Air Regulations to add thereto provisions similar to those in Parts 40, 41, and 46 which require al1 large aircraft to undergo a specific proving period prior to their being used in air carrier operations. The reasons for these amendments are set forth in the explanatory statement of the attached proposal, which is being published in the Federal Register as a notice of proposed rule making.]

  9. Removed

    [removed: The Flight Standards Service of the Federal Aviation Agency has under consideration amendments to Part 42 of the Civil Air Regulations to add thereto provisions similar to those in Parts 40, 41. and 46 which require all large aircraft to undergo a specific proving period prior to their being used in air carrier operations. The reasons for these amendments are set forth in the explanatory statement of the attached proposal, which is being published in the Federal Register as a notice of proposed]

  10. Added

    [added: The Flight Standards Service desires that all persons who wil1 be affected by the requirements of this proposal be fully informed as to its effect upon them and is therefore circulating copies in order to afford interested persons ample opportunity to submit comments as they may desire.]

  11. Removed

    [removed: rule making.]

  12. Added

    [added: Because of the large number of comments which we anticipate receiving in response to this draft release, we will be unable to acknowledge receipt of each reply. However, you may be assured that all comment will be given careful consideration.]

  13. Removed

    [removed: The Flight Standards Service desires that all persons who will be affected by the requirements of this proposal be fully informed as to its effect upon them and is therefore circulating copies in order to afford interested persons ample opportunity to submit comments as they may desire.]

  14. Removed

    [removed: Because of the large number of comments which we anticipate rece1v1ng in response to this draft release, we will be unable to acknowledge receipt of each reply. However, you may be assured that all comment will be given careful consideration.]

  15. It should be noted that comments should be submitted in duplicate to the Docket Section of the Federal Aviation Agency, and in order to insure consideration must be received on or before April 12, 1962

  16. Removed

    [removed: Director, Flight Standards Service]

  17. Added

    [added: Womicae]

  18. Added

    [added: Gotay Flight Standards Service Director,]

  19. FEDERAL AVIATION AGENCY

  20. FLIGHT STANDARDS SERVICE

  21. Changed

    [14 CFR Part 42] [Regulatory Docket No. 1062; Draft Release No. [removed: 62-5]][added: 62–5]]

  22. NOTICE OF PROPOSED RULE MAKING

  23. Proving Period for Large Aircraft

  24. Removed

    [removed: PUrsuant to the authority delegated to me by the Administrator (14 CFR 405.27), notice is hereby given that there is under consideration a proposal to amend Part 42 of the Civil Air Regulations as hereinafter set forth.]

  25. Added

    [added: Pursuant to the authority delegated to me by the ously proved in air carrier operations have a more ex- Administrator (14 CFR 405.27), notice is hereby given tensive proving period than one which has been that there is under consideration a proposal to amend proved by another air carrier or one which has previ- Part 42 of the Civil Air Regulations as hereinafter ously been proved and is subsequently altered in set forth. design. Interested persons may participate in the making of The aircraft placed into service by air carrier the proposed rules by submitting such written data, and commercial operators conducting operations under views, or arguments as they may desire. Communi- the provisions of Part 42 have not been required cations should be submitted in duplicate to the Docket to undergo any specific proving period.]

  26. Changed

    [removed: Interested][added: Under] [removed: persons may participate in the making of the Droposed rules by submitting such written data, views, or arguments as they may desire. Communications should be submitted in duplicate to the Docket][added: this] Section of the Federal Aviation Agency, Room [removed: 0-226,][added: C-226, part, it has only been required that the Administrator] 1711 New York Avenue, N.W., Washington 25, D.C. [removed: all][added: find] [removed: eommunications][added: the aircraft to be safe for the service offered All communications] received on [removed: 01"][added: or] before April 12,[added: without having to establish specific proving period] 1962, will be considered by the Administrator before [added: requirements. This determination posed no problem ]taking action on the proposed rules. The proposal [removed: contained][added: in the past since the aircraft placed in service by contaíned] in this notice may be changed in the light [removed: of][added: these operators had either undergone a previous provof] comments received. All comments submitted will[added: ing period when operated by a scheduled air carrier] be available in the Docket Section for examination by[added: or had been proved by virtue of many years of safe] interested persons when the prescribed date for return of comments has expired.[added: and successful operation by the military services.]

  27. Removed

    [removed: For a number of years, the aircraft placed into service by air carriers operating under the provisions of Part 40, 41, or 46 of the Civil Air Regulations have had to undergo a specific proving period in accord'-]

  28. Added

    [added: Recently, however, newly certificated aircraft not previ- For a number of years, the aircraft placed into ously proved, and previously proved aircraft which service by air carriers operating under the provisions of Part 40, 41, or 46 of the Civil Air Regulations have were subsequently altered in design, have been placed had to undergo a specific proving period in accord into service by certain air carriers operating under ance with the provisions of those parts prior to being the provisions of Part 42. Prior to utilizing these airused in air carrier operations. This proving period craft in air carrier operations, the operators conhas been conducted under the surveillance of the cerned have conducted fairly extensive training and Federal Aviation Agency, or its predecessor agencies. familiarization programs.]

  29. Removed

    [removed: ance with the proviSions of those parts prior to being used in air carrier operations. This proving period has been conducted under the surveillance of the Federal Aviation Agency, or its predecessor agencies.]

  30. Added

    [added: While these programs may, The purpose of a proving period is twofold : It pro- to some extent, accomplish the objective of the provvides the Administrator with established criteria to ing period, they may not fully comply with, or be as assist him in determining that an air carrier can comprehensive as, the specific proving period requiresafely operate a new or different type of aircraft; ments set forth in either Part 40, 41, or 46. and it affords the air carrier an opportunity to ac- In view of the foregoing, the Federal Aviation quire, first hand, the experience necessary to operate Agency considers it appropriate to propose an amendnew equipment safely and efficiently.]

  31. Removed

    [removed: The purpose of a proving period is twofold: It pro· vides the Administrator with established criteria to assist him in determining that an air carrier can safely operate a new or different type of aircraft; and it affords the air carrier an opportunity to acquire, first hand, the experience necessary to operate new equipment safely and efficiently. Proving periods are also of great value since they help to familiarize air carrier personnel with the various peculiarities of a new or different type aircraft with regard to operations, maintenance, servicing, and handling. The extent of this proving period varies with the newness of the type aircraft being placed into service by the air carrier. For example, the regulations require that an aircraft recently type certificated and not previ-]

  32. Added

    [added: Proving periods ment to Part 42 of the Civil Air Regulations to add are also of great value since they help to familiarize thereto provisions similar to those in Parts 40, 41, and air carrier personnel with the various peculiarities 46 which require all aircraft to undergo a specific of a new or different type aircraft with regard to proving period prior to their being used in air carrier operations, maintenance, servicing, and handling. The operations. Such an amendment, if adopted, would extent of this proving period varies with the newness be applicable to all large aircraft used for the first of the type aircraft being placed into service by the time after the effective date of the amendment by an air carrier. For example, the regulations require that air carrier or commercial operator operating under an aircraft recently type certificated and not previ- the provisions of Part 42.]

  33. Removed

    [removed: ously proved in air carrier operations have a more extensive proving period than one which has been proved by another air carrier or one which has previously been proved and is subsequently altered in design.]

  34. Added

    [added: Accordingly, notice is hereby given that it is proposed to amend Part 42 of the Civil Air Regulations (14 CFR Part 42, as amended) by adding a new § 42.17 to read as follows:]

  35. Removed

    [removed: The aircraft placed into service by air carrier and commercial operators conducting operations under the provisi'ons of Part 42 have not been required to undergo any speCific proving period. Under this part, it has only been required that the Administrator find the aircraft to be safe for the service offered without having to establish specific proving period requirements. This determination posed no problem in the past since the aircraft placed in service by these operators had either undergone a previous proving period when operated by a scheduled air carrier or had been proved by virtue of many years of safe]

  36. Added

    [added: 42.17 Proving tests for large aircraft.]

  37. Removed

    [removed: and successful operation by the military services. Recently, however, newly certificated aircraft not previously proved, and previously proved aircraft which were subsequently altered in design, have been placed into service by certain air carriers operating under the provisions of Part 42. Prior to utilizing these aircraft in air carrier operations, the operators CODcerned have conducted fairly extensive training and familiarization programs. While these programs may, to some extent, accomplish the objective of the proving period, they may not fully comply with, or be as comprehensive as, the specific proving period requirements set forth in either Part 40, 41, or 46.]

  38. Added

    [added: (a) A type of aircraft not previously proved for use in air cartier operation shall have at least 100 hours of proving tests. in addition to the aircraft certification tests. accomplished under the supervision of an authorized representative of the Administrator. As part of the 100-hour total at least 50 hours shall be flown in en route operation and at least 10 hours shall be flown at night.]

  39. Removed

    [removed: In view of the foregoing, the Federal Aviation Agency considers it appropriate to propose an amendment to Part 42 of the Civil Air Regulations to add thereto provisions Similar to those in Parts 40, 41, and 46 which require all aircraft to undergo a specific proving period prior to their being used in air carrier operations. Such an amendment, if adopted, would be applicable to all large aircraft used for the first time after the effective date of the amendment by an ail' carrier or commercial operator operating under the provisions of Part 42.]

  40. Added

    [added: (b) A type of aircraft which has been previously proved for use in air carrier operation shall be tested for at least 50 hours, of which at least 25 hours shall be flown in en route operation, unless deviations are specifically authorized by the Administrator on the ground that the special circumstances of a particular case make a literal observance of the requirements of]

  41. Removed

    [removed: Accordingly, notice is hereby g1\""en that it is proposed to amend Part 4.2 of the Ci~il Air Regulations]

  42. Added

    [added: this paragraph unnecessary for safety, when the aircraft : (1) Is materially altered in design, or (2) Is to be used by an air carrier who has not previously proved such a type. Note: A type of aircraft will be considered to be materially altered in design when the alterations include, but are not necessarily limited to: (a) Installation of powerplants other than the powerplants of a type similar to those with which the aircraft is certificated; (b) major alteration to the aircraft or its components which materially affects the flight characteristics. (c) During proving tests only those persons required to make the test and those designated by the Administrator shall be carried. Mail, express, and other cargo may be carried when approved. This amendment is proposed under the authority of sections 313(a), 601, 605, of the Federal Aviation Act of 1958 (72 Stat. 752, 775, 778: 49 U.S.C. 1354, 1421, 1425).]

  43. Removed

    [removed: (14 CFR Part 42, as amended \ by adding a new § 42.17 to read as follows:]

  44. Removed

    [removed: 42.17 Pro-ving te.sts for large aircraft. (a) A type of aircraft: not prenously pro~ed for use in air carrier operation shall han~ at least 100 hours of pro\""ing test.."'. in addition to the aircraft certification tests. aN'omplish€'d under the super.ision of an authorized repr-esentati~e of the Administrator.]

  45. Removed

    [removed: As part of the l()().hour total at least 50 hours shall be flown in en route operation and at least 10 hours shal1 be :flown at night.]

  46. Removed

    [removed: (b) A. type of aircraft which bas been pre~iously]

  47. Removed

    [removed: pron~d for use in air carrier operation shall be tested for at least ;'i() honrs, of which at least 25 hours shall be flown in en route operation. unless de~iations are]

  48. Removed

    [removed: specifically authorized by the Administrator on the ground that the special circumstances of a particular]

  49. Removed

    [removed: ca....~ make a literal obserrance of the requirements of]

  50. Removed

    [removed: this paragraph unnecessary for safety, when the air·]

  51. Removed

    [removed: craft :]

  52. Removed

    [removed: (1) Is materially altered in design, or (2) Is to be used by an air carrier who has not previously proved such a type.]

  53. Removed

    [removed: NOTE: A type of aircraft will be considered to be materially altered in design when the alterations in· elude, but are not necessarily limited to: (a) In· stallation of powerplants other than the powerplants of a type similar to those with which the aircraft is certificated; (b) major alteration to the aircraft or its components which materially affects the :flight characteristics.]

  54. Removed

    [removed: (c) During proving tests only those persons required to make the test and those designated by]

  55. Removed

    [removed: the Administrator shall be carried. Mail, express, and otber cargo may be carried when approved.]

  56. Removed

    [removed: This amendment is proposed under the authority of sections 313(a), 601, 605, of the Federal Aviation Act of 1958 (72 Stat. 752. 775. 778: 49 U.S.C. 1354, 1421, 1425).]

  57. Director, Flight Standards Service

  58. Removed

    [removed: p ""']

  59. Added

    [added: Issued in Washington, D.C., on February 5, 1962.]

  60. Added

    [added: P 0204]

Whole text before this change

FBDERAL AVIATION AGENCY FLIGHT STANDARDS SBRVICB

Washington 25, D. C.

h~/J \ - J' .. -

February 5, 1962

CIVIL AIR REGULATIONS DRAFT RELEASB NO. Qc2-5

SUBJBCT: Proving Period for Large Aircraft Operated Under the Provisions

of Part 42

The Flight Standards Service of the Federal Aviation Agency has under consideration amendments to Part 42 of the Civil Air Regulations to add thereto provisions similar to those in Parts 40, 41. and 46 which require all large aircraft to undergo a specific proving period prior to their being used in air carrier operations. The reasons for these amendments are set forth in the explanatory statement of the attached proposal, which is being published in the Federal Register as a notice of proposed

rule making.

The Flight Standards Service desires that all persons who will be affected by the requirements of this proposal be fully informed as to its effect upon them and is therefore circulating copies in order to afford interested persons ample opportunity to submit comments as they may desire.

Because of the large number of comments which we anticipate rece1v1ng in response to this draft release, we will be unable to acknowledge receipt of each reply. However, you may be assured that all comment will be given careful consideration.

It should be noted that comments should be submitted in duplicate to the Docket Section of the Federal Aviation Agency, and in order to insure consideration must be received on or before April 12, 1962

Director, Flight Standards Service

FEDERAL AVIATION AGENCY

FLIGHT STANDARDS SERVICE

[14 CFR Part 42] [Regulatory Docket No. 1062; Draft Release No. 62-5]

NOTICE OF PROPOSED RULE MAKING

Proving Period for Large Aircraft

PUrsuant to the authority delegated to me by the Administrator (14 CFR 405.27), notice is hereby given that there is under consideration a proposal to amend Part 42 of the Civil Air Regulations as hereinafter set forth.

Interested persons may participate in the making of the Droposed rules by submitting such written data, views, or arguments as they may desire. Communications should be submitted in duplicate to the Docket Section of the Federal Aviation Agency, Room 0-226, 1711 New York Avenue, N.W., Washington 25, D.C. all eommunications received on 01" before April 12, 1962, will be considered by the Administrator before taking action on the proposed rules. The proposal contained in this notice may be changed in the light of comments received. All comments submitted will be available in the Docket Section for examination by interested persons when the prescribed date for return of comments has expired.

For a number of years, the aircraft placed into service by air carriers operating under the provisions of Part 40, 41, or 46 of the Civil Air Regulations have had to undergo a specific proving period in accord'-

ance with the proviSions of those parts prior to being used in air carrier operations. This proving period has been conducted under the surveillance of the Federal Aviation Agency, or its predecessor agencies.

The purpose of a proving period is twofold: It pro· vides the Administrator with established criteria to assist him in determining that an air carrier can safely operate a new or different type of aircraft; and it affords the air carrier an opportunity to acquire, first hand, the experience necessary to operate new equipment safely and efficiently. Proving periods are also of great value since they help to familiarize air carrier personnel with the various peculiarities of a new or different type aircraft with regard to operations, maintenance, servicing, and handling. The extent of this proving period varies with the newness of the type aircraft being placed into service by the air carrier. For example, the regulations require that an aircraft recently type certificated and not previ-

ously proved in air carrier operations have a more extensive proving period than one which has been proved by another air carrier or one which has previously been proved and is subsequently altered in design.

The aircraft placed into service by air carrier and commercial operators conducting operations under the provisi'ons of Part 42 have not been required to undergo any speCific proving period. Under this part, it has only been required that the Administrator find the aircraft to be safe for the service offered without having to establish specific proving period requirements. This determination posed no problem in the past since the aircraft placed in service by these operators had either undergone a previous proving period when operated by a scheduled air carrier or had been proved by virtue of many years of safe

and successful operation by the military services. Recently, however, newly certificated aircraft not previously proved, and previously proved aircraft which were subsequently altered in design, have been placed into service by certain air carriers operating under the provisions of Part 42. Prior to utilizing these aircraft in air carrier operations, the operators CODcerned have conducted fairly extensive training and familiarization programs. While these programs may, to some extent, accomplish the objective of the proving period, they may not fully comply with, or be as comprehensive as, the specific proving period requirements set forth in either Part 40, 41, or 46.

In view of the foregoing, the Federal Aviation Agency considers it appropriate to propose an amendment to Part 42 of the Civil Air Regulations to add thereto provisions Similar to those in Parts 40, 41, and 46 which require all aircraft to undergo a specific proving period prior to their being used in air carrier operations. Such an amendment, if adopted, would be applicable to all large aircraft used for the first time after the effective date of the amendment by an ail' carrier or commercial operator operating under the provisions of Part 42.

Accordingly, notice is hereby g1\""en that it is proposed to amend Part 4.2 of the Ci~il Air Regulations

(14 CFR Part 42, as amended \ by adding a new § 42.17 to read as follows:

42.17 Pro-ving te.sts for large aircraft. (a) A type of aircraft: not prenously pro~ed for use in air carrier operation shall han~ at least 100 hours of pro\""ing test.."'. in addition to the aircraft certification tests. aN'omplish€'d under the super.ision of an authorized repr-esentati~e of the Administrator.

As part of the l()().hour total at least 50 hours shall be flown in en route operation and at least 10 hours shal1 be :flown at night.

(b) A. type of aircraft which bas been pre~iously

pron~d for use in air carrier operation shall be tested for at least ;'i() honrs, of which at least 25 hours shall be flown in en route operation. unless de~iations are

specifically authorized by the Administrator on the ground that the special circumstances of a particular

ca....~ make a literal obserrance of the requirements of

this paragraph unnecessary for safety, when the air·

craft :

(1) Is materially altered in design, or (2) Is to be used by an air carrier who has not previously proved such a type.

NOTE: A type of aircraft will be considered to be materially altered in design when the alterations in· elude, but are not necessarily limited to: (a) In· stallation of powerplants other than the powerplants of a type similar to those with which the aircraft is certificated; (b) major alteration to the aircraft or its components which materially affects the :flight characteristics.

(c) During proving tests only those persons required to make the test and those designated by

the Administrator shall be carried. Mail, express, and otber cargo may be carried when approved.

This amendment is proposed under the authority of sections 313(a), 601, 605, of the Federal Aviation Act of 1958 (72 Stat. 752. 775. 778: 49 U.S.C. 1354, 1421, 1425).

Director, Flight Standards Service

p ""'

Whole text after this change

42 FEDERAL AVIATION AGENCY

FLIGHT STANDARDS SERVICE Washington 25, D. C.

February 5, 1962

CIVIL AIR REGULATIONS DRAFT RELEASE NO. 62-5

SUBJECT: Proving Period for Large Aircraft Operated Under the Provisions of Part 42

The Flight Standards Service of the Federal Aviation Agency has under consideration amendments to Part 42 of the Civil Air Regulations to add thereto provisions similar to those in Parts 40, 41, and 46 which require al1 large aircraft to undergo a specific proving period prior to their being used in air carrier operations. The reasons for these amendments are set forth in the explanatory statement of the attached proposal, which is being published in the Federal Register as a notice of proposed rule making.

The Flight Standards Service desires that all persons who wil1 be affected by the requirements of this proposal be fully informed as to its effect upon them and is therefore circulating copies in order to afford interested persons ample opportunity to submit comments as they may desire.

Because of the large number of comments which we anticipate receiving in response to this draft release, we will be unable to acknowledge receipt of each reply. However, you may be assured that all comment will be given careful consideration.

It should be noted that comments should be submitted in duplicate to the Docket Section of the Federal Aviation Agency, and in order to insure consideration must be received on or before April 12, 1962

Womicae

Gotay Flight Standards Service Director,

FEDERAL AVIATION AGENCY

FLIGHT STANDARDS SERVICE

[14 CFR Part 42] [Regulatory Docket No. 1062; Draft Release No. 62–5]

NOTICE OF PROPOSED RULE MAKING

Proving Period for Large Aircraft

Pursuant to the authority delegated to me by the ously proved in air carrier operations have a more ex- Administrator (14 CFR 405.27), notice is hereby given tensive proving period than one which has been that there is under consideration a proposal to amend proved by another air carrier or one which has previ- Part 42 of the Civil Air Regulations as hereinafter ously been proved and is subsequently altered in set forth. design. Interested persons may participate in the making of The aircraft placed into service by air carrier the proposed rules by submitting such written data, and commercial operators conducting operations under views, or arguments as they may desire. Communi- the provisions of Part 42 have not been required cations should be submitted in duplicate to the Docket to undergo any specific proving period.

Under this Section of the Federal Aviation Agency, Room C-226, part, it has only been required that the Administrator 1711 New York Avenue, N.W., Washington 25, D.C. find the aircraft to be safe for the service offered All communications received on or before April 12, without having to establish specific proving period 1962, will be considered by the Administrator before requirements. This determination posed no problem taking action on the proposed rules. The proposal in the past since the aircraft placed in service by contaíned in this notice may be changed in the light these operators had either undergone a previous provof comments received. All comments submitted will ing period when operated by a scheduled air carrier be available in the Docket Section for examination by or had been proved by virtue of many years of safe interested persons when the prescribed date for return of comments has expired. and successful operation by the military services.

Recently, however, newly certificated aircraft not previ- For a number of years, the aircraft placed into ously proved, and previously proved aircraft which service by air carriers operating under the provisions of Part 40, 41, or 46 of the Civil Air Regulations have were subsequently altered in design, have been placed had to undergo a specific proving period in accord into service by certain air carriers operating under ance with the provisions of those parts prior to being the provisions of Part 42. Prior to utilizing these airused in air carrier operations. This proving period craft in air carrier operations, the operators conhas been conducted under the surveillance of the cerned have conducted fairly extensive training and Federal Aviation Agency, or its predecessor agencies. familiarization programs.

While these programs may, The purpose of a proving period is twofold : It pro- to some extent, accomplish the objective of the provvides the Administrator with established criteria to ing period, they may not fully comply with, or be as assist him in determining that an air carrier can comprehensive as, the specific proving period requiresafely operate a new or different type of aircraft; ments set forth in either Part 40, 41, or 46. and it affords the air carrier an opportunity to ac- In view of the foregoing, the Federal Aviation quire, first hand, the experience necessary to operate Agency considers it appropriate to propose an amendnew equipment safely and efficiently.

Proving periods ment to Part 42 of the Civil Air Regulations to add are also of great value since they help to familiarize thereto provisions similar to those in Parts 40, 41, and air carrier personnel with the various peculiarities 46 which require all aircraft to undergo a specific of a new or different type aircraft with regard to proving period prior to their being used in air carrier operations, maintenance, servicing, and handling. The operations. Such an amendment, if adopted, would extent of this proving period varies with the newness be applicable to all large aircraft used for the first of the type aircraft being placed into service by the time after the effective date of the amendment by an air carrier. For example, the regulations require that air carrier or commercial operator operating under an aircraft recently type certificated and not previ- the provisions of Part 42.

Accordingly, notice is hereby given that it is proposed to amend Part 42 of the Civil Air Regulations (14 CFR Part 42, as amended) by adding a new § 42.17 to read as follows:

42.17 Proving tests for large aircraft.

(a) A type of aircraft not previously proved for use in air cartier operation shall have at least 100 hours of proving tests. in addition to the aircraft certification tests. accomplished under the supervision of an authorized representative of the Administrator. As part of the 100-hour total at least 50 hours shall be flown in en route operation and at least 10 hours shall be flown at night.

(b) A type of aircraft which has been previously proved for use in air carrier operation shall be tested for at least 50 hours, of which at least 25 hours shall be flown in en route operation, unless deviations are specifically authorized by the Administrator on the ground that the special circumstances of a particular case make a literal observance of the requirements of

this paragraph unnecessary for safety, when the aircraft : (1) Is materially altered in design, or (2) Is to be used by an air carrier who has not previously proved such a type. Note: A type of aircraft will be considered to be materially altered in design when the alterations include, but are not necessarily limited to: (a) Installation of powerplants other than the powerplants of a type similar to those with which the aircraft is certificated; (b) major alteration to the aircraft or its components which materially affects the flight characteristics. (c) During proving tests only those persons required to make the test and those designated by the Administrator shall be carried. Mail, express, and other cargo may be carried when approved. This amendment is proposed under the authority of sections 313(a), 601, 605, of the Federal Aviation Act of 1958 (72 Stat. 752, 775, 778: 49 U.S.C. 1354, 1421, 1425).

Director, Flight Standards Service

Issued in Washington, D.C., on February 5, 1962.

P 0204