FEDEPJlL AVIATION AGENCY FLIGHT ST~~DARDS SERVICE

FEDEPJlL AVIATION AGENCY FLIGHT ST~~DARDS SERVICE

Washington 25, D. C.

December 3, 1962

CIVIL AIR REGULATIONS DRAFT RELI'.'l.SE NO. 62-51

SUBJB~r: Requirements for Air Carrier Continuous Airworthiness Program

The Flight Standards Service of the Federal Aviation Agency has under consideration amendments to Parts 40, 41, 42, and 46 of the Civil Air Regulations to require each air carrier to establish an approved

CIVIL AIR REGULATIONS DRAFT RELI'.'l.SE NO. 62-51

quality control program, including a maintenance and inspection organization, to assure the proper performance of maintenance. The reasons therefor are set forth in the explanatory statement of the attached proposal which is being published in the Federal Register as a notice of proposed rule making.

The Flight Standards Service desires that all R<;rsons who will be affected by the requirements of this proposal be fully informed as to

its effect upon them and is therefore circulating copies in order to afford interested persons ample opportunity to submit comments as they may desire.

Because of the large number of comments which we anticipate rece1v1ng in response to this draft release, we will be unable to acknowledge receipt of each reply. However, you may be assured that all comment will be given careful consideration.

It should be noted that comments should be submitted in duplicate to the Docket Section of the Federal Aviation Agency, and in order to insure consideration should be received on or before February 7,

1963 • J; ft' t ;-: ~,.;#

Director,

Flight Standards Service

1032

FEDERAL AVIATION AGENCY

FEDERAL AVIATION AGENCY

FLIGHT STANDARDS SERVICE

li4 CFR Parts 40, 41, 42, 4§.7

NOTICE OF PROPOSED RULE MAKING

Requirements for Air Carrier Continuous Airworthiness Program

Pursuant to the authority delegated to me by the Administrator

(Sec. 11.45, 27 F.R. 9585), notice is hereby given that there is under

NOTICE OF PROPOSED RULE MAKING

consideration a proposal to amend Parts 40, 41, 42, and 46 of the Civil

Air Regulations to amplify upon the maintenance and inspection organ-

ization requirements and to assure the proper performance of maintenance.

Interested persons may participate in the making of the proposed

rules by submitting such written data, views, or arguments as they may

desire. Communications should be submitted in duplicate to the Docket

Section of the Federal Aviation Agency, Room A-l03, 1711 New York Avenue,

N. H., Washington 25, D. C. All communications received on or before

February 7, 1963 , will be considered by the Administrator before taking

action 011 the proposed rules. The proposal contained in this notice may

be changed in the light of comments received. All comments submitted will

be available in the Docket Section for examination by interested persons

at any time.

During the investigation of several major accidents and the surveil-

lance of air carrier maintenance activities by this Agency, weaknesses

were found in the airworthiness program of some air carriers, particularly

in the inspection area. To correct these weaknesses, the Flight Standards

Service, in conjunction with interested industry groups, conducted a study

of toe existing practices and regulatory provisions related to the

control of the quality of air carrier continuous airworthiness programs

to determine whether changes were required. This study indicated that

although the regulations governing air carrier maintenance programs,

maintenance personnel, performance of maintenance, and the certifica-

tion of repair stations, contain standards found in the past to be

basically sound,· they should be reevaluated in the light of current

maintenance practices to assure their adequacy for the safety of present

and future aircraft and equipment used by the air carriers. The need for

this reevaluation was further evidenced by the fact that the basic regu-

lations governing air carrier maintenance progr~ were not changed

materially since the early pos~.ar period. However, during that time the

air carrier airworthiness control organizations grew in size and complexity

as the air carriers ~cquired and operated fleets of evermore sophisticated

aircraft. Horeover, each air carrier developed an airworthiness control

organization which it believes is best suited for its particular type of

aircraft and type of operation. In regard to airworthiness control organ-

izations, the study indicated, in general, that:

(1) The regulations concerning inspections, the key element of

quality control, have been too general and thus applied differently by

the various air carriers;

(2) There is a need for regulations covering standards and

procedures for certain specific components of quality control, such as

completion of required work items and related items; and

(3) There is a lack of uniformity in the air carrier regula-

tions with respect to the requirement for a maintenance release and the

person authorized to sign it. A maintenance release is required by

Parts 40, 41, and 46, but is not required by Part 42. In addition,

Parts 40 and 46 require the maintenance release to be signed by an

"inspector or one authorized by the inspection organization," while

Part 41 requires the release to be signed by "personnel of the air car-

Part 41 requires the release to be signed by "personnel of the air car-

rier charged with the duty of supervising the maintenance."

To the extent that the foregoing study showed a need for a reevalu-

ation of the regulations related to the airworthiness quality control

methods used by the air carriers, especially in regard to inspection, it

was discussed during a maintenance requirements conference held by the

FAA in Washington, D. C., on August 3, 4, and 5, 1960, which was attended

by a wide range of civil aviation representatives, including supplemental

and certificated route air carriers. The air carrier inspection require-

ments were further discussed during subsequent meetings in Washington on

August 18, 1960, and on February 13, April 17, and June 6, 1962, and

representatives of the Air Transport Association and several air carriers

presented oral and written comments respecting the proposals. The princi-

pal problems that were discussed at these meetings pertained to (1) the

"quality control" concepts; (2) the extent to which inspection authority

may be delegated; and (4) the airworthiness release.

The Agency has considered the comments received during these ex-

ploratory conferences and is of the opinion that these problems can be

resolved by the following regulatory proposals:

Inspection.

The existing regulations require each air carrier, or the person

with Whom the carrier has contracted for the performance of maintenance,

alterations, and inspection to establish an inspection organization re-

sponsible for determining that workmanship, methods employed, and materials

used are in conformity with the regulations, and that any airframe, power-

plant, or appliance released for flight is airworthy. The proposed rule

places on the air carrier the responsibility for the inspection program,

even though it may contract with another person to perform the program. In

addition to requiring the establishment of an inspection organization, the

proposed rule further requires each air carrier to include in its manual

provisions Which specify what is to be inspected and how, when, and by whom

the inspection will be conducted. These provisions for inspection must

cover all phases of maintenance and alteration work, including scheduled

and nonscheduled work, materials used, and quality of workmanship.

During the various meetings held in conjunction with the preparation

of this proposal, many persons expressed the desire or need for guide

material which would enable industry and FAA personnel to make a uniform

determination of what inspections are required in various phases of mainte-

nance. The Agency believes that guidelines of this nature are very desir-

able, and realizes the need for more specific delineation of such inspec-

tions. Established FAA/Industry maintenance working groups may be utilized

to prepare lists of maintenance and alteration inspections acceptable to

the Agency for each aircraft type which would be included in each air car-

rier's list of mandatory inspection items. The Federal Aviation Agency

will undertake discussions with the industry with a view toward eventually

developing uniform methods of determining inspection requirements.

•

Pending the development of such a list, due to the varied mainte-

nance systems used, and different configurations of the same model of

aircraft operated by the various air carriers, the proposal does not in-

clude a listing of the items which must be inspected on each aircraft.

This must be determined by each carrier and included in its manual. How-

ever, the determination of what inspections must be accomplished will be

subject to the approval of the assigned FAA inspector.

In discussions of this portion of the proposal, the carriers ex-

pressed concern that the mandatory inspection requirements would require

them to have an inspector for each production worker, and, in addition,

would require them to have full-time inspection personnel phYSically

located at each line station even though maintenance which requires an

inspection is not routinely accomplished on a full-time basis at the

station. This proposal does not require an inspector for each production

employee or at each place where maintenance may be accomplished. For

example, at a small one-man line station a certificated mechanic may certify

the airworthiness release if maintenance or alteration work has been per-

formed which does not require an inspection. If maintenance or alteration

work has been performed which requires an inspection as prescribed by the

air carrier's manual, the inspection must be performed by and certified by

an authorized and qualified person other than the person who did the work.

The person making the inspection mayor may not be stationed at the place

where the work was performed.

Delegation of Inspection Authority.

Delegation of the inspection authority to persons other than those

designated in the carrier's manual is not permissible under this proposal.

This restriction does not prevent the carrier from assigning a properly

qualified person to a line station where he is needed to perform inspection

functions on infrequent occasions and also permitting or requiring him to

perform other duties as a mechanic when there are no inspection functions

to be performed. However, such a person may not inspect any maintenance

or alteration work which he has performed.

Airworthiness Release.

In this proposal the title "maintenance release" is changed to

"airworthiness release or airplane log entry" and the pertinent provisions

of Parts 40, 41, 42, and 46 are standardized by requiring the release or

airplane log entry to be signed by an inspector whenever maintenance func-

tions which require an inspection have been performed. However, when the

maintenance functions performed do not require an inspection, the release

or log entry may be signed by the certificated mechanic or repairman

directly in charge of the work performed.

The foregoing is not intended to be exhaustive of measures taken in

the overall interest of assuming necessary quality control as quality

control is reflected in many other regulatory areas and air carrier

practices. Emphasis here upon the inspection organization and program is

not to indicate that the control of quality begins and ends with inspection.

However, it appears that the regulatory changes discussed above, plus the

other requirements of the regulations and recognized air carrier practices,

will assure that an adequate measure of control is maintained.

The format of any final rules adopted pursuant to this proposal

will be subject to such changes as may be necessary for recodification

under the Agency's recodification program announced in Draft Release 61-25

(26 F .R. 10698).

In consideration of the foregoing, it is proposed to amend Parts 40,

41, 42, and 46 as follot.s:

1. By amending the undesignated center head appearing before

1. By amending the undesignated center head appearing before

§ 40.240 to read as follows:

MAINTENANCE OF AIRPLANES AND APPLIANCES

2. By amending § 40.240 to read as follot.s:

40.240 Responsibility for ain.orthiness of airplanes and appliances.

Each air carrier is primarily responsible for the airworthiness of its

MAINTENANCE OF AIRPLANES AND APPLIANCES

airplanes and appliances used in air transportation, even though it has

made arrangements with another person to perform the Baintenance, alter-

ation, or inspection of its airplanes and appliances.

3. By amending § 40.241 to read as follot.s:

40.241 Haintenance and inspection organization.

(a) Each air carrier must have a maintenance and inspection

organization and an approved maintenance and inspection program to

assure that:

(1) All maintenance, alterations, and inspections performed

by the air carrier, or by persons with whcxn the air carrier contracts for

the per formance of these functions, are performed in compliance wi th the

applicable regulations prescribed by the Administrator in this subchapter,

the airworthiness directives, the air carrier's manual, and accepted

standards;

(2) Sufficient tools, equipment, time, and personnel are

provided for the performance of all maintenance, alterations, and inspec-

tion functions; and

(3) Each airplane released to service is airworthy and has

been properly maintained for operation in air transportation.

(b) Tne maintenance and inspection program of an air

carrier must be set forth in its air carrier manual and include at least

the following:

(1) A description of the maintenance and inspection

organizations, the designation of each unit of such organizations, and

the duties, responsibilities, and authority of each unit;

(2) A description of the types of maintenance and

alterations, both routine and nonroutine, and materials which must

be inspected;

(3) Procedures to assure that maintenance, alterations,

and inspections that are not completed as a result of shift changes or

similar work interruptions are subsequently completed before the airplane

is released to service;

(4) Procedures whereby each person authorized to perform

maintenance, alterations, or inspection will be currently informed of the

types of mnintenance and alterations which must be inspected;

•

(5) Procedures and standards for the operation of the

material review board or salvage committee; and

(6) Procedures and standards for the acceptance of nel;

and used airplanes purchased or leased by the air carrier.

(c) In order to assure the proper performance of the inspec-

tion function, each air carrier1s manual must also include the follm·ling:

(1) Identification of each individual authorized to

perform inspections by name and occupational title, and the types of

inspection he is authorized to perform;

(2) Procedures and standards tor the inspection of each

type of maintenance, alteration, and material which must be inspected;

(3) The scope, standards, and methods for the inspection

and handling of components overhauled by outside agencies;

(4) Procedures and standards for reinspection of I;ork

performed as a result of previous inspection findings (buy-back procedures);

(5) Procedures for the inspection and calibration of test

equipment and measuring devices and the recording of inspections;

(6) Instructions to prevent the inspection decisions of

an authorized member of the inspection organization from being counter-

manded by persons other than designated supervisory personnel of the

inspection organization;

(7) Instructions to prevent a person from inspecting any

maintenance or alteration performed by him; and

(8) Procedures to prevent any person from performing

an inspection unless:

(i) He is authorized by and under the control of

the inspection organization "hen performing the inspection; and

(ii) He holds a mechanic or repairman certificate

and has been trained and qualified to perform the inspection.

4. By redeSignating §§ 40.242 and 40.243 as §§ 40.243 and 40.245,

respectively.

5. By adding a new § 40.242 to read as fo1101's:

40.242 Continuous analysis and surveillance.

(a) Each air carrier shall establish and maintain a system

for the continuous analysis and surveillance of the performance and

effectiveness of its maintenance and inspection program, including the

prompt correction of any deficiency found in the program.

(b) ~~enever the Administrator or his authorized representa-

tive finds that the maintenance and inspection program established by an

air carrier does not contain adequate procedures or standards to meet the

requirements of this Part, the air carrier shall, upon notice thereof,

make such changes in its quality control program as the Administrator or

his authorized representative finds necessary to meet such requirements.

6. By adding a new § 40.244 to read as follows:

40.244 Certificate reguirements. Any individual who is directly in

charge of maintenance, overhaul, or repair of any airframe, engine, propel-

ler, or appliance shall hold an appropriate mechanic or repairman certificate.

7. By amending § 40.511 to read as follows:

40.511 Airworthiness release or airplane log entry.

(a) An airworthiness release, or an appropriate entry in the

airplane log, shall be prepared for each alteration or maintenance per-

formed on an airplane. One copy of the release or entry shall be given

to the pilot in command of the airplane and a record copy retained by

the air carrier for at least two months,

(b) The release or entry shall:

(1) Be prepared in accordance with the procedures set

forth in the air carrier manual;

(2) Certify that the work was performed in accordance

with the requirements of the air carrier manual and the airplane is in

condition for safe operation; and

(3) Be signed by either:

(i) The person authorized to make the inspection

if the work is required to be inspected; or

(ii) The certificated mechanic or repairman directly

in charge of the work performed if the work does not require an inspection.

8, By promulgating amendments to Parts 41, 42, and 46 of the Civil

Air Regulations similar to those proposed herein.

These amendments are proposed under the authority of sections 313(a),

601, 604, 605, 607 of the Federal Aviation Act of 1958 (72 Stat. 752, 775,

778, 779; 49 U.S.C. 1354, 1421, ~~'~4C?~

Director Flight Standards Service

Issued in Washington, D. C., on .. ,.