CAM 1 Volume II (11/1956); Supplement No. 4
This document is historical. It may have been replaced. Check the official source before relying on it.
Text read by OCR from a scanned file. Check the original, as some words may be misread.
CIVIL AERONAUTICS MANUALS—Volume II
U. S. Department of Commerce Civil Aeronautics Administration
Civil Aeronauties Manuals and supplements thereto are issued by the Office of Flight Operations and Airworthiness, Civil Aeronauties Administration, for the guidance of the public and are published in the Federal Register and the Code of Federal Regulations.
Supplement No. 4 February 25, 1957
SUBJECT : Revisions to CAM 1 dated November 1956.
Attached are revised pages for insertion in CAM 1. This revision adds new rules requiring manufacturers of replacement and modification parts to establish a fabrication inspection system within 6 months from the date of initial production of the replacement or modification parts to assure that such parts are in conformity with the design data and safe for installation on type certificated produets. Standards for the inspection system are also set forth.
The new material is inđicated by brackets.
Remove and destroy the following pages: I nsert in lieu thereof the following new pages: vII and vII vI through IX 23 and 24 23 through 24–1
Gunew tlelling
For WILLiam B. DAvIs, Director, Office of Flight Operations and Airworthiness.
Attachments.