Radar Vectors
Airworthiness Directive Current Issued Mar 3, 2004 4 pages Copy saved Nov 17, 2026

AD 2004-05-02 AeroSpace Technologies of Australia Pty Ltd. Models N22B, N22S, and N24A Airplanes

The FAA adopts a new airworthiness directive (AD) for all AeroSpace Technologies of Australia Pty Ltd. (ASTA) Models N22B, N22S, and N24A airplanes. This AD requires you to repetitively inspect wing fittings for fatigue defects, replace or correct defective wing fittings, and replace the stub wing front spar assembly and wing fitting when fatigue life limits are reached. This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Australia. We are issuing this AD to detect and correct defects in the wing strut upper end fittings, wing strut lower end fittings, stub wing strut pick up fittings, and the stub wing front spar assembly. These defects could result in failure of the fittings or spar assembly and lead to reduced structural capability or reduced controllability of the airplane.

Official source ↗ Official PDF ↗

14 CFR Part 39

[Docket No. 2003-CE-37-AD; Amendment 39-13494; AD 2004-05-02] RIN 2120-AA64

Airworthiness Directives; AeroSpace Technologies of Australia Pty Ltd. Models N22B, N22S, and N24A Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Final rule.

SUMMARY: The FAA adopts a new airworthiness directive (AD) for all AeroSpace Technologies of Australia Pty Ltd. (ASTA) Models N22B, N22S, and N24A airplanes. This AD requires you to repetitively inspect wing fittings for fatigue defects, replace or correct defective wing fittings, and replace the stub wing front spar assembly and wing fitting when fatigue life limits are reached. This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Australia. We are issuing this AD to detect and correct defects in the wing strut upper end fittings, wing strut lower end fittings, stub wing strut pick up fittings, and the stub wing front spar assembly. These defects could result in failure of the fittings or spar assembly and lead to reduced structural capability or reduced controllability of the airplane.

Dates

DATES: This AD becomes effective on April 20, 2004.

As of April 20, 2004, the Director of the Federal Register approved the incorporation by reference of certain publications listed in the regulation.

ADDRESSES: You may get the service information identified in this AD from Nomad Operations, Aerospace Support Division, Boeing Australia, PO Box 767, Brisbane, QLD 4000 Australia; telephone 61 7 3306 3366; facsimile 61 7 3306 3111.

Addresses

You may view the AD docket at FAA, Central Region, Office of the Regional Counsel, Attention: Rules Docket No. 2003-CE-37-AD, 901 Locust, Room 506, Kansas City, Missouri 64106. Office hours are 8 a.m. to 4 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Ron Atmur, Aerospace Engineer, FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California 90712; telephone (562) 627-5224; facsimile (562) 627-5210.

Supplementary Information

SUPPLEMENTARY INFORMATION:

Discussion

What events have caused this AD? The Civil Aviation Safety Authority (CASA), which is the airworthiness authority for Australia, recently notified FAA that an unsafe condition may exist on all ASTA Models N22B, N22S, and N24A airplanes. The CASA reports that fatigue tests on the wing strut upper end fitting have shown premature failures and rapid crack growth. Also, fatigue tests on the wing strut lower end fittings, stub wing strut pick up fitting, and stub wing front spar assembly have identified appropriate fatigue lives for the respective parts.

Discussion

What is the potential impact if FAA took no action? Fatigue loading could result in failure of the wing strut upper end fitting, wing strut lower end fittings, stub wing strut pick up fitting, or stub wing front spar assembly. This failure could lead to reduced structural capability or reduced controllability of the airplane.

Has FAA taken any action to this point? We issued a proposal to amend part 39 of the Federal Aviation Regulations (14 CFR part 39) to include an AD that would apply to all ASTA Models N22B, N22S, and N24A airplanes. This proposal was published in the Federal Register as a notice of proposed rulemaking (NPRM) on October 24, 2003 (68 FR 60887). The NPRM proposed to require you to repetitively inspect wing fittings for fatigue defects, replace or correct defective wing fittings, and replace the stub wing front spar assembly and wing fitting when fatigue life limits are reached.

Comments

Comments

Was the public invited to comment? We provided the public the opportunity to participate in the development of this AD. We received no comments on the proposal or on the determination of the cost to the public.

Conclusion

What is FAA's final determination on this issue? We have carefully reviewed the available data and determined that air safety and the public interest require adopting the AD as proposed except for minor editorial corrections. We have determined that these minor corrections:

Conclusion

--Are consistent with the intent that was proposed in the NPRM for correcting the unsafe condition; and --Do not add any additional burden upon the public than was already proposed in the NPRM.

Changes to 14 CFR Part 39--Effect on the AD

How does the revision to 14 CFR part 39 affect this AD? On July 10, 2002, the FAA published a new version of 14 CFR part 39 (67 FR 47997, July 22, 2002), which governs the FAA's AD system. This regulation now includes material that relates to altered products, special flight permits, and alternative methods of compliance. This material previously was included in each individual AD. Since this material is included in 14 CFR part 39, we will not include it in future AD actions.

Costs of Compliance

Costs of Compliance

How many airplanes does this AD impact? We estimate that this AD affects 15 airplanes in the U.S. registry.

What is the cost impact of this AD on owners/operators of the affected airplanes?

We estimate the following costs to accomplish the inspection of the wing strut upper end fitting bolt holes:

Total cost per

Labor cost Parts cost airplane Total cost on U.S. operators

12 workhours x $65 per hour = Not applicable … $780 15 x $780 = $11,700.

$780.

We estimate the following costs to accomplish the inspection of the stub wing strut pick up fittings:

Total cost per

Labor cost Parts cost airplane Total cost on U.S. operators

16 workhours x $65 per hour = Not applicable … $1,040 15 x $1,040 = $15,600.

$1,040.

We estimate the following costs to accomplish any necessary replacements of the wing strut upper end fittings that will be required based on the results of the inspection or on reaching the fatigue life limit. We have no way of determining the number of airplanes that may need the replacement:

Labor cost Parts cost Total cost per airplane

10 workhours x $65 per hour = $650 … $679 $650 + $679 = $1,329.

We estimate the following costs to accomplish any necessary replacements of the wing strut lower end fittings that will required based on reaching the fatigue life limit. We have no way of determining the number of airplanes that may need the replacement:

Labor cost Parts cost Total cost per airplane

12 workhours x $65 per hour = $780 … $193 $780 + $193 = $973.

We estimate the following costs to accomplish any necessary replacements of the stub wing strut pick up fittings that will be required based on the results of the inspection or on reaching the fatigue life limit. We have no way of determining the number of airplanes that may need the replacement:

Labor cost Parts cost Total cost per airplane

80 workhours x $65 per hour = $5,200 … $985 $5,200 + $985 = $6,185.

We estimate the following costs to accomplish any necessary replacements of the stub wing front spar assembly that will be required based on reaching the fatigue life limit. We have no way of determining the number of airplanes that may need the replacement:

Labor cost Parts cost Total cost per airplane

370 workhours x $65 per hour = $24,050 … $4,820 $24,050 + $4,820 = $28,870.

Regulatory Findings

Will this AD impact various entities? We have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.

Regulatory Findings

Will this AD involve a significant rule or regulatory action? For the reasons discussed above, I certify that this AD:

1. Is not a "significant regulatory action" under Executive Order 12866;

2. Is not a "significant rule" under the DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and

3. Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.

We prepared a summary of the costs to comply with this AD and placed it in the AD Docket. You may get a copy of this summary by sending a request to us at the address listed under ADDRESSES. Include "AD Docket No. 2003-CE-37-AD" in your request.

List of Subjects in 14 CFR Part 39

List of Subjects in 14 CFR Part 39

Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety.

Adoption of the Amendment

Accordingly, under the authority delegated to me by the Administrator, the Federal Aviation Administration amends part 39 of the Federal Aviation Regulations (14 CFR part 39) as follows:

PART 39--AIRWORTHINESS DIRECTIVES

PART 39--AIRWORTHINESS DIRECTIVES

1. The authority citation for part 39 continues to read as follows:

Authority: 49 U.S.C. 106(g), 40113, 44701.

§ 39.13 [Amended]

2. FAA amends § 39.13 by adding a new AD to read as follows:

2004-05-02 Aerospace Technologies of Australia Pty Ltd.: Amendment 39-13494; Docket No. 2003-CE-37-AD.

When Does This AD Become Effective?

When Does This AD Become Effective?

(a) This AD becomes effective on April 20, 2004.

What Other ADs Are Affected By This Action?

(b) None.

What Airplanes Are Affected by This AD?

(c) This AD affects Models N22B, N22S, and N24A airplanes, all serial numbers, that are certificated in any category.

What Is the Unsafe Condition Presented in This AD?

What Is the Unsafe Condition Presented in This AD?

(d) This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Australia. The actions specified in this AD are intended to detect and correct defects in the wing strut upper end fittings, wing strut lower end fittings, stub wing strut pick up fittings, and the stub wing front spar assembly. These defects could result in failure of the fittings or spar assembly and lead to reduced structural capability or reduced controllability of the airplane.

What Must I Do To Address This Problem?

What Must I Do To Address This Problem?

(e) To address this problem, you must do the following:

Actions Compliance Procedures

(1) Inspect the wing strut For Models N22S and Follow the

upper end fitting bolt N24A: Initially Accomplishment

holes: inspect before Instructions in

(i) visually inspect for 3,600 hours time-in- Boeing Australia

scoring, ovality, fretting, service (TIS) on Aerospace

corrosion, and dimensions; the wing strut Technologies of

and upper end fitting Australia Nomad

(ii) inspect, using eddy or within the next Alert Service

current inspection, for 100 hours TIS after Bulletin No. ANMD-

cracks April 20, 2004 (the 57-12, Revision 2,

effective date of dated May 25, 1999.

this AD), whichever

occurs later.

Repetitively

inspect thereafter

every 900 hours TIS

until 14,400 hours

TIS are accumulated

on the wing strut

upper end fitting.

For Model N22B:

Initially inspect

before 5,400 hours

TIS on the wing

strut upper end

fitting or within

the next 100 hours

TIS after April 20,

2004 (the effective

date of this AD),

whichever occurs

later. Repetitively

inspect thereafter

at every1,200 hours

TIS until 14,400

hours TIS are

accumulated on the

wing strut upperend

fitting.

(2) Complete corrective Before further Follow the

actions for defects of the flight after the Accomplishment

wing strut upper end inspection required Instructions in

fittings: in paragraph (e)(1) Boeing Australia

(i) If a crack is found or of this AD, unless Aerospace

the hole in the strut upper already done. Technologies of

end fitting is damaged and Australia Nomad

will not clean up, replace Alert Service

the wing strut upper end Bulletin No.ANMD-57-

fittings. 12, Revision 2,

(ii) If the hole in the dated May 25, 1999;

strut is oval or damaged, and any repair

and the oversize line scheme obtained

reamer will not repair it: from Nomad

(A) get a repair scheme from Operations,

the manufacturer; and Aerospace Support

(B) follow this repair Division,

scheme. BoeingAustralia, PO

(iii) If scoring, fretting, Box 767, Brisbane,

or corrosion is found, or QLD 4000 Australia;

all dimensions are within telephone 61 73306

limits, line ream the hole 3366; facsimile 61

and replace the bolt 7 3306 3111. Obtain

approval of this

repair scheme

through the FAA at

the address

specified in

paragraph (f) of

this AD.

(3) Replace the wing strut Before further Follow the

upper end fittings. flight when cracks Accomplishment

are found by the Instructions in

inspection required accumulation Boeing

inparagraph (e)(1); Australia Aerospace

and upon the Technologies of

accumulation of Australia Nomad

14,400 hours TIS on Alert Service

the fitting or Bulletin No. ANMD-

within the next 100 57-12, Revision 2,

hours TIS after dated May 25, 1999.

April 20, 2004 (the

effective date of

this AD), whichever

occurs later. For

Models N22S and

N24A: start

repetitive

inspections of

paragraph (e)(1) of

this AD when 7,200

hours TIS are

accumulated on the

wing strut upper

end fitting. For

Models N22B: start

repetitive

inspections of

paragraph (e)(1) of

this AD when 10,800

hours TIS are

accumulated on the

wing strut upper

end fitting.

(4) Replace the wing strut Upon the Follow a repair

lower end fittings: accumulation of scheme from Nomad

(i) get a repair scheme from 14,000 hours TIS on Operations,

the manufacturer; and the fitting or Aerospace Support

(ii) follow this repair within the next 100 Division, Boeing

scheme hours TIS after Australia, PO Box

April 20, 2004 (the 767, Brisbane, QLD

effective date of 4000 Australia;

this AD), whichever telephone 61 73306

occurs later. 3366; facsimile 61

7 3306 3111. Get

approval of this

repair scheme

through the FAA at

the address

specified in

paragraph (f) of

this AD.

(5) Inspect the stub wing Initially inspect Follow the

strut pick up fittings for upon the Accomplishment

cracks accumulation of Instructions in

5,400 hours TIS on Aerospace

the fitting or Technologies of

within the next 300 Australia Nomad

hours TIS on the Service Bulletin

fitting after April No. NMD-53-18,

20, 2004 (the dated February 8,

effective date of 1996; or Boeing

this AD), whichever Australia Aerospace

occurs later. Technologies of

Repetitively Australia

inspect thereafter NomadService

at every 1,800 Bulletin No. NMD-53-

hours TIS until 18, Revision 1,

18,800 hours TIS dated September 3,

are accumulated on 2002; and the

the stub wing strut applicable airplane

pick up fitting. maintenance manual.

(6) Replace the stub wing Before further Follow the

strut pick up fittings flight when cracks Accomplishment

are found after the Instructions in

inspection required Aerospace

in paragraph (e)(5) Technologies of

of this AD, unless Australia Nomad

already done; and Service Bulletin

upon the No. NMD-53-18,

accumulation of dated February 8,

18,800 hours TIS or 1996; or Boeing

300 hours TIS after Australia Aerospace

April 20, 2004 (the Technologies of

effective date of Australia Nomad

this AD), whichever Service Bulletin

occurs later. No. NMD-53-18,

Revision 1, dated

September 3, 2002;

and the applicable

airplane

maintenance manual.

(7) Replace the stub wing Upon the Follow a repair

front spar assembly: accumulation of scheme from Nomad

(i) get a repair scheme from 25,000 hours TIS on Operations,

the manufacturer; and the wing strut Aerospace Support

(ii) follow this repair upper end fitting, Division, Boeing

scheme wing strut lower Australia, PO Box

end fitting, or 767, Brisbane, QLD

stub wing strut 4000 Australia;

pick up fitting, or telephone 61 73306

within the next 100 3366; facsimile 61

hours TIS after 7 3306 3111. Get

April 20, 2004 (the approval of this

effective date of repair scheme

his AD), whichever through the FAA at

occurs later. the address

specified in

paragraph (f) of

this AD.

May I Request an Alternative Method of Compliance?

May I Request an Alternative Method of Compliance?

(f) You may request a different method of compliance or a different compliance time for this AD by following the procedures in 14 CFR 39.19. Unless FAA authorizes otherwise, send your request to your principal inspector. The principal inspector may add comments and will send your request to the Manager, Los Angeles Aircraft Certification Office (ACO), FAA. For information on any already approved alternative methods of compliance, contact Ron Atmur, Aerospace Engineer, FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California 90712; telephone (562) 627-5224; facsimile (562) 627-5210.

Does This AD Incorporate Any Material by Reference?

Does This AD Incorporate Any Material by Reference?

(g) You must do the actions required by this AD following the instructions in Boeing Australia Aerospace Technologies of Australia Nomad Alert Service Bulletin No. ANMD-57-12, Revision 2, dated May 25, 1999; Aerospace Technologies of Australia Nomad Service Bulletin No. NMD-53-18, dated February 8, 1996; and Boeing Australia Aerospace Technologies of Australia Nomad Service Bulletin No. NMD-53-18, Revision 1, dated September 3, 2002. The Director of the Federal Register approved the incorporation by reference of this service bulletin in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You may get a copy from Nomad Operations, Aerospace Support Division, Boeing Australia, P.O. Box 767, Brisbane, QLD 4000 Australia; telephone 61 7 3306 3366; facsimile 61 7 3306 3111. You may review copies at FAA, Central Region, Office of the Regional Counsel, 901 Locust, Room 506, Kansas City, Missouri 64106; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.

Is There Other Information That Relates to This Subject?

Is There Other Information That Relates to This Subject?

(h) These Australian ADs also address the subject of this AD: AD Number AD/GAF-N22/2, Amendment 3, dated January 28, 2003, and AD Number AD/GAF-N22/70, Amendment 2, dated January 28, 2003.

Issued in Kansas City, Missouri, on February 20, 2004. Dorenda D. Baker, Manager, Small Airplane Directorate, Aircraft Certification Service.