Radar Vectors
Advisory Circular Cancelled Issued Oct 6, 2003 AJR-1 Copy saved Nov 17, 2026

AC 90-98 Change 1 to Simultaneous Closely Spaced Parallel Operations at Airports Using Precision Runway Monitor (PRM) Systems

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗

Change 1 to Simultaneous Closely Spaced Parallel Operations at Airports Using Precision Runway Monitor (PRM) Systems