Radar Vectors
Advisory Circular Cancelled Issued Sep 15, 2007 AAS-100 Copy saved Nov 17, 2026

AC 150/5300-18A General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic Information System (GIS) Standards

Provides the specifications for the collection of airport survey data through field and office methodologies in support of aeronautical information and airport engineering surveys. It also explains how to submit data to the FAA, which will forward the data to the National Geodetic Survey (NGS) for quality control purposes. The primary purpose of these general guidelines and specifications is to list the requirements for aeronautical surveys conducted at airports in support of the FAA Airport Surveying–GIS Program. Because of the size of this document, it is available as one large file (see Complete) or as several smaller files (see Parts 1-4).

This document is no longer current. Cancelled by 150/5300-18B. Check the official source before relying on it.

Official source ↗

General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic Information System (GIS) Standards

Provides the specifications for the collection of airport survey data through field and office methodologies in support of aeronautical information and airport engineering surveys. It also explains how to submit data to the FAA, which will forward the data to the National Geodetic Survey (NGS) for quality control purposes. The primary purpose of these general guidelines and specifications is to list the requirements for aeronautical surveys conducted at airports in support of the FAA Airport Surveying–GIS Program. Because of the size of this document, it is available as one large file (see Complete) or as several smaller files (see Parts 1-4).