AC 150/5300-16A General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey
Explains the specifications for establishing geodetic control on or near an airport. It also describes how to submit the information to the National Geodetic Survey (NGS) for approval and to be included in the National Spatial Reference System (NSRS) in support of aeronautical information surveys. See also Airports GIS Video Training Series.
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Text read by OCR from a scanned file (4 of 121 pages). Check the original, as some words may be misread.
AC 150/5300-16A, General Guidance and Specifications for Aeronautical…
Advisory Circular
U.S. Department of Transportation Federal Aviation Administration
Subject: General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey
Date: 9/15/2007
Initiated by: AAS-100
AC No: 150/5300-16A
Change:
a. Purpose of this Advisory Circular (AC). This AC explains the specifications for establishing geodetic control on or near an airport. It also describes how to submit the information to the National Geodetic Survey (NGS) for approval and inclusion in the National Spatial Reference System (NSRS) in support of aeronautical information surveys.
b. Audience. Engineering and surveying companies contracted by state aviation agencies or local airport authorities to perform an aeronautical information survey of an airport should read this AC thoroughly and other related advisory circulars before commencing an airport project.
c. Application. The Federal Aviation Administration and the NGS Aeronautical Survey Program recommend the guidance and specifications in this AC for establishing on-airport geodetic control and submitting it to NGS for approval and inclusion in the NSRS in support of aeronautical information surveys. This AC does not constitute a regulation and in general is not mandatory. However, use of these guidelines is mandatory for surveys that are funded under Federal grant assistance programs. It also provides one, but not the only, acceptable means of meeting the requirements of Title 14 Code of Federal Regulations (CFR) part 139, Certification of Airports. Mandatory terms such as “must” apply only to those who conduct aeronautical information surveys using Airport Improvement Program (AIP) or Passenger Facility Charge Program (PFC) funds or those who seek to demonstrate compliance by use of the specific method described by this AC.
d. Cancellation. This AC cancels AC 150/5300-16, General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey, dated February 13, 2006.
e. Principal Changes. The implementation of Wide Area Augmentation System (WAAS) Localizer Performance with Vertical Guidance (LPV) instrument approaches make additional airport surveying guidance necessary. To accommodate these LPV approaches, this revision includes the following principal changes:
• Assigns responsibility for determining which airports require permanent geodetic control to FAA Regional Airports Divisions in Paragraph 2.2.1.
• Specifies when FAA Regional Airports Divisions can allow temporary airport control and how that control should be established in Paragraph 2.2.2.
• Updates the current NGS Geoid model from Geoid03 to Geoid06 for Alaska.
• Clarifies requirements for Secondary Airport Control Station (SACS) adjustment processing in Paragraph 8.9.7.
David L. Bennett Director, Airport Safety and Standards
ii
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › Table of Contents
1. INTRODUCTION … 1
2. ADMINISTRATION … 2
2.1. SPECIFICATIONS … 2
2.2. AIRPORTS REQUIRING GEODETIC CONTROL MONUMENTATION … 2 2.2.1. PERMANENT CONTROL … 2 2.2.2. TEMPORARY CONTROL … 3
2.3. DEFINITIONS … 2 2.3.1. TERMINOLOGY … 2 2.3.2. MEASUREMENTS … 3
2.4. GENERAL REQUIREMENTS … 3
2.5. MODIFICATIONS … 3
2.6. UNUSUAL CIRCUMSTANCES … 3
2.7. REPORTS … 3 2.7.1. WEEKLY STATUS REPORTS … 3
2.8. ORIGINAL DATA … 4
3. NATIONAL SPATIAL REFERENCE SYSTEM (NSRS) … 4
3.1. HORIZONTAL CONTROL … 5
3.2. VERTICAL REFERENCE … 5
3.3. GEOID MODEL … 5
4. REFERENCES AND GLOSSARY … 5
4.1. REFERENCES … 5
4.2. GLOSSARY … 6
5. QUALITY CONTROL … 8
5.1. QUALITY CONTROL PLAN … 8
6. DATA FORMATS … 8
iii
6.1. ORIGINAL DATA … 8
6.2. FINAL DATA … 9
7. DATA MEDIUM AND FILE NAMING CONVENTION … 9
7.1. DATA MEDIUM … 9
7.2. FILE NAMING CONVENTION FOR GPS GROUND SURVEYS … 9
8. SURVEY WORK … 9
8.1. PURPOSE … 9
8.2. RECONNAISSANCE … 9 8.2.1. CONTROL STATIONS … 9 8.2.2. DATABASE SEARCH … 10 8.2.3. CONTACT WITH AIRPORT AUTHORITIES … 10 8.2.4. MARK RECOVER … 11 8.2.5. BENCH MARK SPIRIT LEVEL TIES … 113 8.2.6. VISIBILITY … 13 8.2.7. NATIONAL SPATIAL REFERENCE SYSTEM (NSRS) TIES … 13 8.2.8. STATION LOCATION SKETCH AND VISIBILITY DIAGRAM … 13 8.2.9. PENCIL RUBBINGS … 14 8.2.10. PHOTOGRAPHS … 14 8.2.11. PROPOSED NEW STATION SITES … 21 8.2.12. GPS POSITIONS … 21
8.3. PROJECT SURVEY PLAN … 22
8.4. SELECTION GUIDELINES FOR AIRPORT GEODETIC CONTROL SURVEYS.. 23 8.4.1. REQUIREMENTS … 23 8.4.2. MONUMENT SELECTION … 23 8.4.3. USE OF EXISTING STATIONS … 24 8.4.4. MONUMENT ACCESSIBILITY … 25 8.4.5. MONUMENT SITING CONSIDERATIONS … 25 8.4.6. PACS AND SACS PROXIMITY TO OTHER AIRPORT FEATURES … 25 8.4.7. INTERVISIBILITY CHOICES FOR PACS and SACS … 26
8.5. MONUMENT STABILITY … 26
8.6. MARK SETTING … 27 8.6.1. STAMPING … 28 8.6.2. BRONZE DISKS … 28 8.6.3. STAINLESS STEEL ROD MARKS … 30 8.6.4 CONCRETE MARKS … 37 8.6.5. WITNESS POSTS … 42
iv
8.7. GPS POSITIONING PROCEDURES … 42 8.7.1. CORS SELECTION … 42 8.7.2. CTCORS SELECTION … 43 8.7.3. ACCURACY STANDARDS … 44 8.7.4. GPS OBSERVATION REQUIREMENTS … 44 8.7.5. GPS OCCUPATION AT ALL SURVEY STATIONS … 53 8.7.6. RECOMMENDED EQUIPMENT … 55
8.8. VECTOR PROCESSING … 56 8.8.1. REQUIREMENTS … 56
8.9. PACS ADJUSTMENT PROCESSING … 59 8.9.1. SOFTWARE … 59 8.9.2. ADJUSTMENTS REQUIRED … 60 8.9.3. SOFTWARE RESULTS ACCURACY … 61 8.9.4. NSRS TIE ACCURACY … 61 8.9.5. BENCHMARK (VERTICAL) ACCURACY … 61 8.9.6. BLUE BOOK GUIDANCE … 61 8.9.7. SACS ADJUSTMENT PROCESSING … 62
8.10. NGS PROCEDURAL OUTLINE FOR ADJUSTING GPS DATA FOR AIRPORT GEODETIC CONTROL SURVEYS … 62
8.11. DATA SUBMITTAL … 66
9. FINAL PROJECT REPORT … 67
9.1. FINAL REPORT CONTENTS … 67
10. DELIVERABLES TO NGS … 68
10.1. LABOR, EQUIPMENT, AND OTHER ITEMS … 68
10.2. QUALITY CONTROL PLAN … 68
10.3. SURVEY PLAN … 68
10.4. PROJECT STATUS REPORTS … 68
10.5. PROJECT SKETCH (VECTOR DIAGRAM) … 68
10.6. FIELD LOGS … 68
10.7. VECTOR PROCESSING OUTPUT … 69
10.8. FINAL PROJECT REPORT … 69
10.9. ADJUSTMENT AND CHECKING PROGRAMS … 69
v
10.10. ORIGINAL DATA … 69
10.11. DESCRIPTIONS … 69
10.12. TRANSMITTAL LETTER … 69
APPENDIX 1. SURVEY DISK DIAGRAMS … 71
APPENDIX 2. NATIONAL SPATIAL REFERENCE SYSTEM … 75
APPENDIX 3. AIRPORT INTERVIEW CHECKLISTS … 77
APPENDIX 4. WRITING STATION DESCRIPTIONS AND RECOVER NOTES WITH WINDESC … 85
APPENDIX 5. STATION TABLE FORM … 95
APPENDIX 6. EXAMPLE GPS OBSERVATION SCHEME … 99
APPENDIX 7. INFORMATION, DATA, AND SOFTWARE AVAILABLE ON THE INTERNET … 101
APPENDIX 8. OUTLINE FOR PROCESSING AIRPORT GEODETIC CONTROL SURVEYS WITH PAGE-NT … 105
APPENDIX 9. EXAMPLE COORDINATE COMPARISON SPREADSHEET … 109
APPENDIX 10. PROJECT SUBMISSION CHECKLIST … 113
vi
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 1. INTRODUCTION.
1. INTRODUCTION. Perform geodetic control surveys to establish a basic control network for supplemental surveying, engineering, and mapping work on an airport. The establishment of geodetic control by permanent survey monuments in the airport vicinity is critical to the National Airspace System (NAS). These monuments and their accurate connections to the National Spatial Reference System (NSRS) assure accurate relativity between surveyed points on an airport and between these points and other surveyed points and facilities in the NAS, including the navigation satellites. This geodetic control consists of a Primary Airport Control Station (PACS) and two or more Secondary Airport Control Stations (SACS) tied to the NSRS. These survey marks must be used for future aeronautical and engineering projects related to runway/taxiway construction, navigational aid siting, obstruction clearing, road building, and other airport improvement activities. This document provides guidance and specifications for establishing the geodetic control and submitting the data to National Geodetic Survey (NGS) for publication. AC 150/5300-18 identifies the required data, collection methodologies, and accuracies required for the collection of aeronautical information.
Figure 1.1. Illustrates the connection of the airport to other portions of a control network.
2. ADMINISTRATION. 2.1. SPECIFICATIONS. This AC outlines the Federal Aviation Administration (FAA) requirements for on-airport geodetic control and provides general guidance and specifications for establishing this control on airports. The requirements for reporting deviations, unusual circumstances, and other issues described in the following paragraphs apply to these general specifications.
Figure 1.1 · page 7Picture of the page from the copy saved here
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 2. ADMINISTRATION.
2.2. AIRPORTS REQUIRING GEODETIC CONTROL MONUMENTATION.
2.2.1. Permanent Control. FAA Regional Airports Divisions will determine which airports require permanent geodetic control monumentation in the form of PACS or SACS based on the activity (operational or proposed future construction) at the airport. However, for all airports in the National Plan of Integrated Airport Systems (NPIAS), we strongly recommend that at least the PACS be established. 2.2.2. Temporary Control. Where it is not reasonable from a cost perspective to establish permanent control at the airport, the Regional Airports Division may allow temporary airport control to be established and tied to the NSRS through the use of the NGS Online User Positioning System (OPUS). Contracted surveyors should observe the following practices when using the OPUS to establish temporary airport control:
a. Establish two independent but intervisible marks on an airport as a conformity check and perform redundant observations.
b. Observe each mark in two continuous and independent sessions of at least 4 hours and submit these observations to the NGS OPUS site at http://www.ngs.noaa.gov/OPUS/.
c. Review and follow all other NGS requirements outlined for use of the OPUS. d. Include results of the OPUS sessions in the project report and final deliverables. 2.3. DEFINITIONS. This AC makes use of the following conventions. 2.3.1. TERMINOLOGY. The verb “must” means that compliance is required. The verb “should” denotes a recommendation. The contraction “N/A” means not applicable. The term “position” means horizontal position specified as latitude and longitude unless stated otherwise. The term “elevation” means the distance of a point above a specified datum, measured along the direction of gravity. The term “vertical” refers to the direction in which the force of gravity acts. The term “height” means the distance, measured along a perpendicular, between a point and a datum. The term “observation” means the survey observations resulting in a position and/or elevation for the survey mark in question, whether the mark is an existing mark or a newly set mark. The term “set” means physically constructed.
2.3.2. MEASUREMENTS. Use the U.S. Survey Foot (3.28083333333 feet = 1 meter) for any length conversions or as required by state law. If using a conversion factor other than the U.S. survey Foot, identify the conversion factor used and the reason in the Survey Plan. 2.4. GENERAL REQUIREMENTS. The selected Contractor must provide all labor, equipment, supplies, material, and transportation to produce and deliver data and related products as required by this AC. 2.5. MODIFICATIONS. The Contractor must submit in writing requests for modifications to or deviations from these specifications to the contract issuing authority, NGS, and FAA points of contact (POCs) as soon as a need for them is identified. 2.6. UNUSUAL CIRCUMSTANCES. The Contractor must notify the contract issuing authority of any unusual circumstances occurring during the performance of the tasks identified by this AC that affect the deliverables or their quality (see Section 5). The contract issuing authority, in turn, must notify FAA Airport Surveying-GIS Program Manager and NGS Point of Contacts (POC). 2.7. REPORTS.
Thorough reporting is required. The Contractor must submit a weekly project status report, a Quality Control Plan (see Section 5), a Project Survey Plan (see paragraph 9.3), and a Final Project Report (see Section 10) to the contract issuing authority. The airport sponsor/proponent or designated representative will send all required report submittals and documents to the FAA Airport Surveying-GIS Program Manager, who will forward it to NGS. 2.7.1. WEEKLY STATUS REPORTS. The Contractor must submit project status reports via email every Monday afternoon by 2:00 P.M. Eastern Time, from the date of the contract start until the work is complete. These reports must include the following:
a. Percentage complete for each major project task. b. Status of other work. c. Completion or expected completion dates for each task. d. Any unusual circumstances and/or deviations from the guidance in this AC. This report should be brief, up to date, and include the prime Contractor’s firm name. These reports must break the work into phases to allow for tracking the project’s progress. The following example is a suggested format; however, the percentage complete and completion date are required fields. An “X” or other similar mark in the last column is used to indicate a change in the task status since the last report.
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 3. NATIONAL SPATIAL REFERENCE SYSTEM (NSRS).
Table 2.1. Sample Weekly Email Status Report.
Project Title: ABC Regional Airport Obstruction Chart Survey Contracted Firm Name:
XYZ Engineering
Project Manager’s Name:
Joe Doe
Project Manager’s Position:
P.E
Report Date: MM/DD/YYYY Task Percentage Complete
Date Completed
or Estimated Completion Date
NGS Approval
Date
Updated from
last report
Reconnaissance 100 % Dec 01, 2004 Dec 06, 2004 Survey Plan 100 % Dec 12, 2004 Dec 18, 2004 Mark Setting 90 % Feb 01, 2004 X Observations 20 % Feb 15, 2004 X Vector Processing % Adjustment Processing
%
Final Project Report % Quality Control % % Additional Comments: In this section, provide any required additional comments, unusual circumstances encountered, or approved modifications or deviations from this AC. Be sure to include comments on any changed items indicated in the matrix.
2.8. ORIGINAL DATA. Observation logs and other original records generated during this project are legal records and must be retained for data accountability by the Airport Authority. NGS will receive a copy of the original data for quality assurance purposes. Original logs and records must be submitted and must be legible, neat, clear, accurate, and completed in indelible black ink. Original data must be saved, unmodified, in hand-written or electronic form. In the original records (paper or digital), nothing is to be erased or obliterated. All available spaces on the recording forms should be completed. If a mistake is made on a form, draw a single line through the mistake (e.g., as demonstrated here), and write the correction above or to the side. If space is too limited to permit a field correction, restart with a new log sheet; however, do not recopy the form in the office in order to make a “clean” copy. An explanatory note should be made for all corrections to the original recorded figures. It is essential for all hand-recorded information to be neat and legible. All editing of electronic data must be done on a copy of the original. Submit the original version of the data, not a handmade copy, photocopy, or digital copy. 3. NATIONAL SPATIAL REFERENCE SYSTEM (NSRS). All surveying and positioning must be tied to the NSRS. For further information about the NSRS, refer to Appendix 2.
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 4. REFERENCES AND GLOSSARY.
3.1. HORIZONTAL CONTROL. The only nationally recognized horizontal datum is North American Datum of (NAD) 83 (YYYY), where YYYY is the year of the most recent observations. Note: The year of observations is on the NGS datasheet next to the latitude and longitude. 3.2. VERTICAL REFERENCE. Use North American Vertical Datum (NAVD) 88. For information on NAVD 88, refer to the following website: http://www.ngs.noaa.gov/PUBS_LIB/NAVD88/navd88report.htm. In Alaska and other areas outside the continental United States where NAVD 88 bench marks are not available, make GPS ties to tidal bench marks within the project area. 3.3. GEOID MODEL. Use the most recent NGS model, currently GEOID03 for contiguous 48 locations found at http://www.ngs.noaa.gov/PC_PROD/GEOID03/ and Geoid06 for locations in Alaska. For information on these models, see http://www.ngs.noaa.gov/PC_PROD/pc_prod.shtml. For explanations of many of the terms in Section 4 of this AC, see http://www.ngs.noaa.gov/faq.shtml.
4. REFERENCES AND GLOSSARY. 4.1. REFERENCES.
a. Input Formats and Specifications of the National Geodetic Survey Data Base, the “Blue Book.” Available online at http://www.ngs.noaa.gov/FGCS/BlueBook/.
b. Station Location Sketch and Visibility Obstruction Diagram. For information about the diagram, see http://www.ngs.noaa.gov/PROJECTS/FBN/ (click on “Forms”, then “Visibility Obstruction Diagram”).
c. National Oceanic and Atmospheric Administration (NOAA) Manual National Ocean Service (NOS) NGS 1, Geodetic Bench Marks. Available online at http://www.ngs.noaa.gov/PUBS_LIB/GeodeticBMs.pdf.
d. NGS National Continuously Operating Reference Station (CORS) System. For information on CORS, see http://www.ngs.noaa.gov/CORS/.
e. High Accuracy Reference Network (HARN). For more information on HARN, see http://www.ngs.noaa.gov:80/faq.shtml.
f. Interim Federal Geodetic Control Subcommittee (FGCS) Specifications and Procedures to Incorporate Electronic Digital/Bar-Code Leveling Systems, version. 4.0, 15 Jul 94.
g. Standards and Specifications for Geodetic Control Networks, FGCC, 1984. h. NOAA Manual NOS NGS 3, Geodetic Leveling, 1981. i. File Naming Convention. See paragraph 7.2. j. FAA Airport Identifiers. See http://www.faa.gov/atpubs/lid/lidhme.htm. 4.2. GLOSSARY. Geodetic Glossary, NGS, 1986 (not available online). For a printed copy, contact NGS at (301) 713-3242 or email [email protected]. ANA—Area Navigation Approach. AZ MK—Azimuth Mark. A marked point established in connection with a triangulation (or traverse) station to provide a starting azimuth for dependent surveys. Keep in mind that some azimuth marks also were positioned, and some have an underground disk. The azimuth mark is usually a pre-stamped survey disk, generally 1/4 to 2 miles from the horizontal station. The next consecutive azimuth mark number was used if an earlier number was destroyed. See Appendix 1. BM—Bench Mark. CBN—Cooperative Base Network (NGS). CTCORS—Central Temporary Continuously Operating Reference Station.
A permanently monumented control station established near the center of a 300 km (radius) survey area (as defined elsewhere in this document) functioning as a temporary Continuously Operating Reference Station (CORS). CORS—Continuously Operating Reference Station. A permanent GPS facility whose GPS receiver provides observables from the GPS satellites, allowing stations occupied temporarily by GPS receivers to be differentially positioned relative to it. CORS are related to the North American Datum of 1983 (NAD 83) coordinate system at the 1 to 3 centimeter level either by being collocated at VLBI sites used to define the system or by being differentially positioned relative to such a collocated GPS station. DISK—A thin metal plate about 9 cm in diameter with a stem attached to the center of the bottom. The plate is slightly convex (in vertical) and usually round (in horizontal) and contains the mark for which survey information is known or to be determined. The plate usually also contains a designation, year, and the name of the agency setting the plate.
It is usually made of bronze, brass, or aluminum and may be set in a drill hole or embedded in concrete. DOD—Department of Defense. FAA—Federal Aviation Administration. FBN—Federal Base Network (NGS).
FGCC—Federal Geodetic Control Committee (Changed to FGCS in October 1990). FGCS—Federal Geodetic Control Subcommittee. GPS—Global Positioning System. HARN—High Accuracy Reference Network. ITRF—International Terrestrial Reference Frame. MARK—(1) A dot, the intersection of a pair of crossed lines, or any other physical point corresponding to a point in a survey; (2) the object, such as a disk, on which the mark (1) is placed; (3) the entire monument, consisting of the mark (1), the object on which it occurs (2), and the structure to which the object is fastened. MONUMENT—A structure that marks the location of a point determined by surveying. In the case of a disk in concrete, the monument would be the entire structure. Mark, monument, and station can mean the same thing. NAD 27—North American Datum of 1927. NAD 83—North American Datum of 1983. NAVD 88—North American Vertical Datum of 1988. NGS—National Geodetic Survey, NOAA. Disks inscribed with this name have been set from 1970 to the present. NGVD 29—National Geodetic Vertical Datum of 1929. NOAA—National Oceanic and Atmospheric Administration. No survey disks have been set with this name. NOS—National Ocean Survey, NOAA. Disks inscribed with this NOS name were set from about 1970 to December 3, 1982. NOS—National Ocean Service. Disks inscribed with this NOS name were set from about 1983 to the present. NSRS—National Spatial Reference System. PACS—Primary Airport Control Station. RM—Reference Mark. A survey mark of permanent character close to a survey station to which it is related by an accurately measured distance and azimuth. For a triangulation station,
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 6. DATA FORMATS.
reference marks are pre-stamped survey disks, usually within 30 meters (one tape length) of the triangulation station. Standard procedure was to set two reference marks, numbered clockwise from north, with the next consecutive reference number used if an earlier number was destroyed. See Appendix 1. SACS—Secondary Airport Control Station. STATION—A physical location or site at which, from which, or to which survey observations have been made. See Mark and Monument. USACE—U.S. Army Corps of Engineers (Blue Book abbreviation is USE). USCG—U.S. Coast Guard. USC&GS—U.S. Coast and Geodetic Survey. Disks inscribed with USC&GS were set from about 1900 to 1970. Over 10 different pre-stampings were used (Bluebook abbreviation is CGS). USE—U.S. Army Corps of Engineers or U.S. Engineers Department (old acronym; present Blue Book abbreviation). WAAS—Wide Area Augmentation System (FAA). WGS 84—World Geodetic System 1984.
5. QUALITY CONTROL. Check all data to ensure it is complete, reliable, and accurate. The Contractor’s personnel must become thoroughly familiar with this AC, the Appendixes, the definitions of surveying terms, and the material covered in the other references and publications, as required. See Section 4 for References and Glossary. 5.1. QUALITY CONTROL PLAN. Submit a Quality Control Plan (QCP) covering all project tasks prior to beginning survey work on this project. The QCP must describe how the Contractor will meet the technical specifications required for the project. The QCP must include at least the following elements: a check of all manual computations (including check marks and initials), a check of all manual data computer entries, a check of file formats, and a check of all reports and data submitted. The Contractor must also describe how data will be backed up and how the Contractor will ensure original data is not modified. See paragraph 8.3, “Project Survey Plan”, and Section 11, “Deliverables to NGS”. Comments on quality control and a copy of the Quality Control Plan must be included in the Final Project Report. 6. DATA FORMATS. 6.1. ORIGINAL DATA. Original, raw digital data must be submitted and their formats must be documented in the Final Project Report. Original paper records must also be submitted; see
AC 150/5300-16A, General Guidance and Specifications for Aeronautical… › 8. SURVEY WORK.
paragraph 2.7. Observations for positioning PACS and SACS must be submitted in Blue Book format. See paragraph 4.1a. 6.2. FINAL DATA. Final project data must be submitted in Blue Book format or in the appropriate formats specified by this AC (for example, digital photographs). 7. DATA MEDIUM AND FILE NAMING CONVENTION. 7.1. DATA MEDIUM. Submit the data for review and approval on a CD-ROM or other preapproved medium. 7.2. FILE NAMING CONVENTION FOR GPS GROUND SURVEYS. See the naming convention for Federal Base Network (FBN) projects on the NGS website at http://www.ngs.noaa.gov/PROJECTS/FBN/. 8. SURVEY WORK. 8.1. PURPOSE. The establishment of geodetic control provides the required accuracy for aeronautical information, engineering surveys, and mapping to support planning, design, construction, operation, maintenance, and management of airport facilities and establishes a tie to the NSRS. The NSRS provides airports with a common, consistent set of geographical coordinates (reference points) relative to other parts of the National Airspace System. A project may include planning, reconnaissance, mark recovery, mark setting, GPS observations, spirit leveling, data processing, data analysis, data adjustment, data submittal in specified formats, and preparing reports. GPS ground surveying methods must be used for Airport Geodetic Control survey work specified in this section. 8.2. RECONNAISSANCE. Reconnaissance activities for each survey must include, but are not limited to, the following:
a. Review of station descriptions in the NGS database. b. Coordination with airport authorities (see checklist in Appendix 3). c. Mark recovery. d. Selection of PACS, SACS, and NSRS ties. e. Preparation of required descriptions, sketches, photographs, and other documentation. f. Compilation of a Project Survey Plan. 8.2.1. CONTROL STATIONS. The following types of control stations (survey marks) must be considered for use in these projects (see Appendix 1 for drawings of typical NGS disks):
8.2.1.1. HORIZONTAL.
a. All control stations with a stability code of A, B, or C (see paragraph 8.5 for an explanation of stability codes), and
b. All high-accuracy GPS control stations, including CORS, FBN, CBN, HARN, and PACS.
8.2.1.2. VERTICAL. Utilize all first-order and second-order NAVD 88 vertical control stations (bench marks) within the project area, sufficient to provide vertical control for the project. 8.2.1.3. NSRS TIE. All horizontal and vertical points used as control must be part of the NSRS. 8.2.2. DATABASE SEARCH. NGS and U. S. Coast and Geodetic Survey (USC&GS) (former name for NGS) station descriptions are contained in the NGS Integrated Database (NGSIDB) and are available via the NGS website. Perform a database search for all control stations on and around the airport meeting the criteria in 8.2.1 prior to performing the field reconnaissance. Use the review to develop a priority list of HARN stations and bench marks for use in NSRS ties. Many airports have existing monuments suitable for use as PACS/SACS. Suitable stations are defined as a survey disk, rod, or similar type monument meeting at least a stability code of “C” with a known history of stability, considered suitable for GPS observations, and recovered in good condition.
Directly access the NGS database using the NGS website at http://www.ngs.noaa.gov/datasheet.html. 8.2.3. CONTACT WITH AIRPORT AUTHORITIES. Close communication with airport management is a critical part of the reconnaissance. Make appointments with airport management well in advance to ensure a qualified airport representative is available to discuss the survey and the procedures for working on the airport. Proper clearances to work in the aircraft operations areas must be obtained before performing any work at an airport. A security and safety briefing may be required before field crews are allowed to work on the airfield. Follow standard safety procedures, and equip all vehicles with flashing yellow lights and aircraft radios. Contact with the airport traffic control tower is mandatory during surveys at controlled airports unless an escort is provided. Interview checklists for these meetings are located in Appendix 3 of this AC.
Inquire about planned construction or changes in the airport layout. Briefly summarize any future construction plans in the Project Survey Plan. Discuss optimal locations for the practical use and survivability of the monuments, and finalize the PACS and SACS monument site selections with airport management. Inquire about underground utilities and other hazards to setting monuments. Emphasize the importance of keeping the area surrounding the monuments, especially the PACS, clear of any future equipment installations or construction that might result in loss of intervisibility between the monuments, loss of visibility to GPS satellites, or a source of multi-path interference.
8.2.4. MARK RECOVERY. 8.2.4.1. SEARCH. Make an extensive physical search in the field for all suitable control stations found during the database search(s) described in paragraph 8.2.2. Use existing marks meeting the PACS and SACS requirements before setting a new monument. The use of existing marks reduces the proliferation of marks on airports, reduces mark setting costs, and makes it easier to maintain an accurate, up-to-date survey database. For a discussion of “Existing Monumentation in the Vertical Network”, see pages 43-44, Geodetic Bench Marks, NGS, 1978. Before using an existing mark, thoroughly check the description to confirm the station's identity, stability, and location and to provide input for an updated description or recovery note. Do not stamp existing disks or logo caps. NGS has set “A” or “B” order marks at many airports within the United States. Use these marks if they meet PACS requirements.
If there is an existing “A” or “B” order station just off an airport, and it has visibility onto the airport, an exception requiring the PACS be located on the airport may be granted. If this situation is encountered, make a recommendation, with justification, in the Project Survey Plan for the approval of the FAA and NGS. If there is an existing “A” or “B” order station just off an airport, and appropriate sight lines onto the airport are not available, an exception may be granted if an intermediate station (a third SACS) is set providing visibility from the “A” or “B” order station through the third SACS to the other two SACS on the airport. The third SACS may be located off the airport. If a situation is encountered at an airport requiring a third SACS, identify the requirement in the Project Survey Plan. The contractor must prepare digital updated descriptions or recovery notes in the three-paragraph standard NGS format described in Appendix 4 for all NSRS marks searched for and all marks used in the project. 8.2.4.2. MARK RECOVERY DEFINITION.
The “recovery” of a control station includes a physical visit to the station to determine its usability. Check each control station to— Determine proper identity. Check the mark type, disk type, and stamping against the NGS datasheet.
Ascertain its unmoved position. Measure the distances and angles to and from the reference marks and/or the distances from the reference points and the Witness Post.
Determine its condition, stability, and visibility.
Prepare a digital updated description or recovery note in NGS format. Submit station descriptions and recovery notes in computer-readable form using WINDESC software available online at http://www.ngs.noaa.gov/PC_PROD/PARTNERS/index.shtml. Appendix 4 provides detailed instructions on writing station descriptions and recovery notes.
8.2.4.3. USING MARKS OF OTHER ORGANIZATIONS. An existing mark of another organization meeting the siting, construction, and intervisibility requirements established by this AC may be used as a PACS. Normally this would be limited to a disk set in a drill hole in bedrock or a stainless steel rod if there is an indication the rod was driven to NGS driving requirements. Marks previously established by other organizations may be used for a SACS if they meet all siting, construction, and intervisibility requirements and are stability A, B, or C. 8.2.4.4. MARKS ON PRIVATE PROPERTY. Contact property owners and obtain permission before using or setting marks on private property. Take care to return the landscape to the original condition, and Do Not include the name and phone number of the property owner in the station description unless the land is owned by a business or the owner requests the information be included in the description.
Figure 8.2. Example Station Recovery
Log.
Figure 8.2 · page 18Picture of the page from the copy saved here
8.2.4.5. DESTROYED SURVEY MARKS. A moved, damaged, or very loose metal survey disk that’s stability indicates it can no longer serve as survey mark is to be removed, the recovery notes written describing the mark as destroyed, and the disk sent to NGS. Do not describe a mark as destroyed unless the disk is found and returned to NGS.
8.2.4.6. DAMAGED SURVEY MARKS. Any existing disk selected for use as a PACS or a SACS should be repaired if found loose or with edges exposed. Any work done to repair a disk must be described completely in the digital recovery note. Take extreme care not to alter the existing horizontal or vertical position of the disk. Disk longevity can be increased substantially by simply adding highway epoxy or equivalent when the edges of a disk are exposed. This will prevent ice from forming under the disk or a vandal from prying the disk from its location. For all marks, perform mark maintenance as required, to include replacing logo cap lids if missing. When an unusual situation arises, contact NGS for recommendations before taking any action on the mark. If time permits, send a photograph to NGS along with the description of the situation. Notify NGS of any other marks needing mark maintenance. Examples of mark maintenance problems include loose disks, exposed disk edges, missing logo caps, missing logo cap lids, exposed edge of concrete monuments, or imminent danger of destruction.
8.2.4.7. MARKS NOT FOUND. As stated in paragraph 8.2.4.1, make an extensive physical search for all control stations found in the database search(s). If a mark is not found, enter the number of person-hours spent searching for it in the digital recovery note. Do not state the mark is destroyed simply because it was not found. If strong evidence suggests a mark is destroyed, clearly state the evidence, so NGS can determine if it is destroyed and replace it as required.
8.2.4.8. MARKS RECOVERED BUT NOT USABLE. For marks recovered but are positively not usable due to complete tree canopy, etc., the recovery requirements may be reduced to just a simple recovery note such as, “RECOVERED AS DESCRIBED. THE MARK CAN NOT BE OCCUPIED BY GPS DUE TO COMPLETE TREE CANOPY”. For marginally usable marks, fulfill the normal recovery requirements, including Visibility Diagram and photographs, because, depending on other marks in the area, the mark might be needed. 8.2.5. BENCH MARK SPIRIT LEVEL TIES. If the reconnaissance indicates the number and/or distribution of bench marks with good sky visibility is inadequate, spirit level ties may be made to transfer an elevation from a bench mark to a nearby existing or new survey point having good sky visibility. Every effort should be made to recover existing bench marks before using this method; however, transferring elevations to existing horizontal control marks is preferable to setting new marks. Temporary marks must not be used. Refer to paragraph 8.7.4.4 for more information regarding the use of bench mark ties.
Figure 8.1. Example Station Location
Sketch and Visibility Diagram.
8.2.6. VISIBILITY. Adequate GPS satellite visibility is required for all horizontal and vertical stations selected. The visibility should be minimally restricted from 15 degrees above the horizon to the zenith, in all directions; see paragraph 8.4 for details. Minor obstructions are acceptable, but must be depicted on the Station Location Sketch and Visibility Diagram (see paragraph 8.2.8). For new stations, select a site relatively free of present and future anticipated obstructions. Utility poles in the GPS field of view are tolerable, and they provide security and a reference to help locate the mark. Set new marks at least 2 meters to the south (if possible) from a pole. Do not use existing marks located within 2 meters of a pole. Marks should not be set or used if within 5 meters of a chain link fence. 8.2.7. NATIONAL SPATIAL REFERENCE SYSTEM (NSRS) TIES. Each PACS must be tied to at least one “A” or “B” order HARN station and two First- or Second-order NAVD 88 bench mark stations. The stations selected for these ties must be recovered during the field reconnaissance.
Figure 8.1 · page 19Picture of the page from the copy saved here
Details for selecting and positioning the PACS (and Central Temporary Continuously Operating Reference Station (CTCORS)) ties are listed in paragraph 8.7.4, “GPS Observation Requirements”. All reconnaissance deliverables required for “suitable” stations are also required for the NSRS ties. 8.2.8. STATION LOCATION SKETCH AND VISIBILITY DIAGRAM. For all marks, observed and proposed, the contractor must prepare and submit a station location and visibility diagram. The form is available at http://www.ngs.noaa.gov/PROJECTS/FBN/ (click on “Forms”, then “Visibility Obstruction Diagram”). The station location sketch and visibility diagram should show the survey marks’ relation to nearby features, such as
Figure 8.3. An example of the NGS suggested
Type 1 digital photograph
Figure 8.3 · page 20Picture of the page from the copy saved here
runway ends, taxiways, airport lights, fence lines, and buildings. Label prominent features and draw dashed lines along the reference measurements to indicate the reference objects listed in the description (in NGS standardized format) for the station. The D-File is a clear, concise, accurate and complete description of the station in the NGS standardized format. The description (D-File) should enable one to go with certainty to the immediate vicinity of the mark, and by the measured distances to reference points and the description of the character of the mark, it should inform the searcher of the exact location of the mark and make its identification certain. It should include only essential details of a permanent character.” Complete the visibility diagram and sketch the inscription and stamping detail of the disk in the space provided. The form must be neatly and accurately completed.
Figure 8.4. Station Pencil Rubbing Form.
Figure 8.4 · page 20Picture of the page from the copy saved here
8.2.9. PENCIL RUBBINGS. Rubbings are not required during the recovery of a survey mark. However, rubbings are required at the time of each observation at that station. See Figure 8.3 and paragraph 8.7.5.3 for details. 8 P .2.10. HOTOGRAPHS. 8.2.10.1. PURPOSE OF DIGITAL PHOTOS. Is to define the digital photographic standards for images of survey marks collected and for other reconnaissance photographs. Many of these images will be stored in the NGS database and available to the public so the subject matter (survey equipment, personnel, background, etc.) must be in good taste and professional in nature. Digital photographs are useful for station (mark) reconnaissance, mark recovery, mark stability assessment, and quality control and as an aid during data processing and data verification. Some projects might require digital photographs during several stages. Generally, three photographs per station are stored in the NGS database.
8.2.10.2. PHOTOGRAPHIC REQUIREMENTS. 8.2.10.2.1. NUMBER OF PHOTOGRAPHS. At least three digital photographs taken during daylight hours are required for each mark recovered or described during the current project. This requirement is for marks where a written, NGS format, digital description or recovery note is prepared. For consistency within the NGS database, numbers are used to describe the three photographs. Photograph type one is an extreme close up as shown in Figure 8.4. Photograph type number two (Figure 8.5) should be taken at eye-level with the station 5 to 6 feet in the distance, and photograph type three should be taken horizontally with the station approximately 10 to 30 feet in the distance (Figure 8.6). All three photographs require a digital caption and correct file name as specified in paragraphs 8.2.10.3 and 8.2.10.4.7.3. Include a small, temporary sign in photographs two and three. 8.2.10.2.2.
Figure 8.5 · page 21Picture of the page from the copy saved here
Take sufficient photographs to describe the stamping, appearance, condition, and location of the mark and points of potential interest, including visibility obstructions, roads, runways, taxiways, or other dangers and any special setup requirements. Alter the orientation of the photographs as necessary to include this information in as few photographs as possible. (For example, for a tall obstruction, rotate the camera 90 degrees so the long axis of the image is vertical, as in the photo in Figure 8.6. Capture the tops of nearby obstructions if possible. If acceptable photographs exist in the NGS database, additional photographs are not required, unless changes have occurred or more than 1 year has passed. A photograph is acceptable if it meets the requirements of this AC, it is of good visual quality, and no changes have taken place at the location that a new photograph would help clarify. 8.2.10.3. CAPTION. The photographer must write a caption for each photograph. The caption should contain the following information in a commaseparated format:
Figure 8.6 · page 23Picture of the page from the copy saved here
Figure 8.5. Example of the NGS suggested Type 2
digital photograph.
a. Station designation (name). b. Station Permanent Identifier
(PID) for existing stations in the NGS database; leave blank if this is a new station. c. Airport Location Identifier (LID)
if on airport; leave blank if not on airport. d. Photo number with the cardinal
direction (N, NE, E, SE, etc.) the camera is pointing; only photo type 3 has a direction. e. Station type (i.e. PACS, SACS, FBN, CBN); otherwise leave blank. f. Date photo was taken (DDMMYYYY).
SAMPLE CAPTION FOR NEW MARK
JONES, 2, 8JAN2001
SAMPLE CAPTION FOR EXISTING PACS ON AIRPORT
SMITH, AB1234, LAX, 3N, PACS, 8JAN2001 The cardinal direction should not be included in the captions for photographs 1 and 2 since they are taken from above the above. The caption may be digitally captured on the image at the time of exposure or may be inserted later, offline. If possible, record at least the date online. If caption information is added later, take careful notes at the time of exposure to ensure the correct caption is added. The caption must not obstruct any pertinent aspects of the station or surroundings. To ensure the letters of the caption are visible, use software to erase a rectangular area for the caption’s lettering as depicted in Figures 8.4, 8.5, and 8.6. 8.2.10.4. DESCRIPTION OF PHOTOGRAPH TYPES. 8.2.10.4.1. CLOSE-UP. For survey marks, the first photograph (photo type 1, Figure 8.4) is a close-up, oriented downward to show the survey mark from directly above, with the disk or logo cap nearly filling the image. Brush any dirt or debris off the mark to show the disk. If it has a logo cap, the logo cap should be open.
The intent of this photograph is to clearly show the condition of the mark and all stamping on the mark or logo cap so it is clearly legible. Use extra care to ensure the stamping is clear. Consider setting the camera to its highest quality and resolution modes; rub a yellow crayon across the stamping to highlight the letters; set the camera to “macro” mode, if available; take into account the minimum focusing distance of the camera (take test photographs to determine the minimum focusing distance, and consult the owner’s manual); and, if a flash is used, hold the camera above and off to the side so the flash does not create a bright spot in the middle of the disk’s image. Medium-quality camera setting and resolution modes may be used for photographs other than the close-ups. If additional photographs are required, number these close-ups as 1A, 1B, etc.
8.2.10.4.2. EYE-LEVEL. For survey marks, photo type 2 is oriented vertically downward from eye level to show the monument from directly above and to cover an area about 1 meter in diameter. Brush any dirt or debris off the mark to show the disk and the setting, if it is a concrete monument, clear off debris to the edge of the monument. If it has a logo cap, the logo cap should be open. Include a small, temporary sign in this photograph with the station designation (name) printed so it is clearly visible in the photograph. The intent of this photograph is to show the general condition of the mark and the immediate surrounding area. If additional photographs are required, number these photos 2A, 2B, etc. 8.2.10.4.3. HORIZONTAL VIEW(S). For survey marks, take at least one additional daylight photograph oriented near horizontal, and show the mark, with tripod and antenna (if possible), in the foreground and its identifying surroundings, including any significant obstructions or possible sources of multi-path in the background. Show the top of nearby obstructions if possible.
Consider rotating the camera 90 degrees to use the long axis of the image to capture an entire obstruction. Place a temporary sign in this photograph with the station designation (name) and the direction the camera is pointing, both printed so they are clearly visible in the photograph. If additional photographs are taken, move around the mark to locations that are 90 degrees apart (preferably cardinal directions). Name these photographs number 3XX, where the “XX” is the cardinal direction the camera is pointing, for example, 3N or 3NE. Figure 8.6. Example of Photo Type 3. 8.2.10.5. RECONNAISSANCE PHOTOGRAPHS. Some or all of the digital images described in this section may be required on a given project; refer to the project instructions. Each of these photographs requires a sign, a caption, and the correct file name. The filenames for all reconnaissance photographs must begin with “RE” to indicate reconnaissance.
Table 8.1. Digital Photograph Requirements Matrix
Required Item Contents Description Sign in Photo Name and Direction (unless vertical photo)
Place a sign in this photograph with the station designation (name) and the direction the camera is pointing, both printed so they are clearly visible in the photograph. Digital Caption Name, PID, LID, Number, Type, Date See paragraph 8.2.10.3. Photo File Name
RE-Name-PID-Number-Date.jpg See Section 8.2.10.5.7.3 below. Generally these recon images will not be loaded in the NGS database but might be required for use during planning and review. All reconnaissance photographs will have digital captions. These captions may be captured on the image or added later. In this AC, “RE” stands for “reconnaissance” and “R” stands for “right” runway. See the project instructions to determine which of the following reconnaissance photographs are required.
8.2.10.5.1. PROPOSED LOCATIONS FOR MARKS. Take two photographs of each proposed permanent mark location. These may be one (each) type two photograph and one type three or two type three photographs (3A and 3B), depending on which combination better shows the proposed mark location. Include a tripod, stake, sign, or other device showing the proposed mark location.
8.2.10.5.2. RUNWAY END PHOTOGRAPHS. Take at least three photographs at the end of each runway (including thresholds and stopways) surveyed in the current project, as follows:
a. Eye-Level (photo type 1). Photo taken from directly overhead above the mark, showing about 1 meter in diameter (See Figure 8.7).
b. Approach (photo type 3). Photo showing tripod over mark in foreground and approach in background (see Figure 8.8). Figure 8.7. Example End of Runway Survey Point
Photo.
Figure 8.8. Example End of Runway reconnaissance Photo Type 3.
Figure 8.7 · page 24Picture of the page from the copy saved here
c. Across runway (photo type 3). Photo taken from the side of the runway looking across the end of the runway, with a tripod or arrow indicating the end point; include any features used to identify the runway end (Figure 8.9).
8.2.10.5.3. NAVIGATION AIDS (NAVAIDS). Take photo(s) (type 3) of all NAVAIDs surveyed. Show the survey tripod in place surveyed, or if positioned remotely, add arrows and labels to the photograph indicating the horizontal and/or vertical point(s) surveyed. 8.2.10.5.4. DEPTH OF HOLE PHOTOGRAPHS. Take at least one photograph showing the hole dug or drilled for a concrete or rod mark. Place a measuring device (e.g., tape measure or level rod) in the hole, clearly showing the depth of the hole.
Figure 8.9 illustrates a photo taken across the runway.
Figure 8.10. Is a NAVAID photo with the horizontal and vertical survey points identified.
Figure 8.10 · page 26Picture of the page from the copy saved here
8.2.10.5.5. PHOTOGRAMMETRIC CONTROL POINTS (Paneled and photo identified). Take two type 3 photographs of all photogrammetric control points clearly showing the point. These photographs will be used later as an aid in identifying the point on the aerial photographs. Show the mark in the foreground and the nearest identifiable feature in the background. The two photographs should be taken from two different directions, ideally 90 degrees apart (such as from the East and the South). 8.2.10.5.6. OTHER REQUIRED PHOTOGRAPHS. Additional photographs may be required depending on the airport and surroundings. These additional requirements should be outlined in the Statement of Work for the project. 8.2.10.5.7. GENERAL INFORMATION FOR PHOTOGRAPHY. 8.2.10.5.7.1. IMAGE and FILE SIZE. Each image should be about 800 by 1000 pixels when submitted. The maximum file size for each image is 500 KB, typical file size should be about 50 to 100KB. 8.2.10.5.7.2. IMAGE FORMAT. Store the digital photographs in JPEG format, approximately 50 percent reduction. 8.2.10.5.7.3. PHOTOGRAPH FILE NAME. Use the following file naming convention: the optional “RE” (for reconnaissance), dash, the station designator, dash, the PID, dash, the photo
number (e.g., 1, 1A, 2, 3N, 3NE), dash, date, dot, jpg. For new marks, there is no PID. Use a maximum of 30 alpha-numeric characters to the left of the dot.
Sample File Names For new stations: SMITH-3-date.jpg For existing stations: SMITH-AB1234-1-date.jpg For recon photos: RE-SMITH-AB1234-3-date.jpg For runway end point: RE-LAX_CL_END_RWY_12R-3-date.jpg For the runway end point example, “RE” = reconnaissance, dash, LAX = LID, dash, “CL END RWY 12R” = runway end point designator (CL = centerline, END = end, RWY = runway, 12 = runway number, and R = right (or C = center, or L = left), dash, “2” = photo number, and date. Use underscores ( _ ) to fill blanks. In this AC, “RE” stands for “reconnaissance”, and “R” stands for “right” runway (used if there is a parallel set of runways). Also, the LID may be four characters rather than just three. 8.2.10.5.7.4. STORAGE MEDIUM. Submit all digital photographs together on their own medium (CD), not on the same medium with other types of data. For airport work, submit all photographs for a given airport in a subdirectory named for that airport. 8.2.10.6. Take photographs of all stations as outlined in this AC. For RECOVERED STATIONS, take at least three photographs of each existing control station. For PROPOSED SITES OF NEW STATIONS, take two photographs (paragraph 8.2.11) and additionally take three photographs of NEW STATIONS, AFTER SETTING. If the mark is a CONCRETE MARK HOLE, then only a single photograph is required.
8.2.11. PROPOSED NEW STATION SITES. Use existing marks rather than setting new marks. If required, the contractor must propose sites for new stations and propose the type of mark to be set in the “Comments/recommendations” column of the “Station Table” as defined in paragraph 8.3b. Prepare preliminary digital descriptions and station location sketch and visibility diagrams. Take two photographs of the proposed sites; one at eye level, oriented vertically downward showing the ground in the area of the proposed mark (photo type 2) and one oriented horizontally showing the nearest satellite obstruction or identifying feature if no obstructions (photo type 3). After the mark is set, capture photo type 1, and update others as required. See Appendix 3 for digital photograph requirements. Proposed sites for new PACS and SACS must be approved by NGS prior to setting the marks. NGS may approve station selections based on preliminary Project Survey Plans to facilitate efficient field operations. New PACS and SACS should only be set if no existing mark can meet the requirements. See paragraph 8.6, MARK SETTING, for mark setting guidelines.
8.2.12. GPS POSITIONS. Obtain a hand-held GPS (pseudo-range) position for all marks found and for proposed sites for new marks. Include this position in the text of recovery notes and descriptions. Specify the position in the format DDD MM SS.ss. Use the description you wrote to return to the station; this verifies the description and provides a check on the adequacy of the description and the GPS position.
8.3. PROJECT SURVEY PLAN. After reconnaissance but prior to mark setting or observations, submit a Project Survey Plan to NGS. The data can be submitted online using the NGS Project Proposal Form available at http://www.ngs.noaa.gov/PROJECTS/proposals/project1.shtml or by sending the data (one paper copy and one digital copy) to the NGS Point of Contact (POC). NGS will review the plan as soon as possible, normally within 5 work days, and send the contractor written comments and/or approval. The contractor must not begin mark setting or data collection until the plan is approved by NGS. At minimum, the plan must include the following sections:
a. Airport Summary Report. A separate paragraph for each airport to include—airport contact and access information; whether airport is controlled; whether escort is required; airport radio frequencies; intervisibility conditions between the PACS and SACS; comments on any future construction, unusual circumstances, use of witness posts, and any other miscellaneous information. Include any comments or deviations from this AC. The Airport Summary Report can be combined with the Station Table described below.
b. Station Table. For each airport, submit a table listing station designation name, PID, establishing agency, order, stability, condition at recovery, and comments for each station. For new stations, include the proposed name in the “Name” column, identify them as “proposed” in the “Type” column, and indicate the proposed type of mark (rod, concrete, disk in bedrock) in the “Comments/Recommendations” column. For existing stations, the name and PID must be used exactly as listed in the NGS database and must be this way in all survey records. For existing stations found but not proposed for use, state the reason(s) in the “Comments/Recommendations” column. Identify the PACS, SACS, and all NSRS ties for the airport. Give status of marks not used and the reason. Appendix 5 contains both a blank and completed example station table.
c. Airport Control Plot. Plot all “suitable” control on or near each airport on an airport map. Label each station with its designation and indicate if it is a PACS, SACS, Bench Mark, HARN Tie, or subsidiary control. Hand plotting on 8.5 x 11 paper is acceptable. See Appendix 5 for an example.
d. Photographs. Submit photographs in accordance with paragraph 8.2.10 for all suitable stations recovered during the survey, and for all new monuments that will be set.
e. Station Location Sketch and Visibility Diagrams. Submit for all suitable stations recovered during the reconnaissance, and for all new monuments set (See paragraph 8.2.8).
f. Station Descriptions. Submit Recovery Notes or Descriptions for existing marks. Encode the descriptions using WINDESC software. These descriptions should be used, reviewed and corrected by GPS observers when they travel to marks. See paragraph 8.2.4.2 and Appendix 4 for details on writing station descriptions.
g. GPS Observing Scheme. If applicable, group airports together for observation/processing simultaneously. Include length of sessions and number of occupations.
List CORS, HARN, Bench Mark, and any A-order ties for each airport. See Appendix 6 for an example.
h. Project Vector Diagram. Depict the entire project area showing all occupied stations, except SACS (because of scale). Symbolically distinguish whether each station is a CORS, PACS, HARN Tie, Bench Mark or combination. Include 300km (or appropriate scale) dashed circles around CORS and CTCORS, and 50 km circles around PACS. Show the GPS vectors used for processing. For multiple airport projects, use one sheet of large size and additional smaller sheets depicting individual airports or airports grouped together for GPS observations. Provide a scale or note distances from the PACS to the CORS, HARN, and Bench Mark Ties.
i. Proposed Instrumentation List. Tabulate the brand and model numbers of GPS equipment.
j. Data Processing Software. Specify software name and version for the software used. Ensure the current version of all software is used.
k. Quality Control Plan. See Section 5. Note: Printouts of the NGS station datasheets are not required.
8.4. SELECTION GUIDELINES FOR AIRPORT GEODETIC CONTROL SURVEYS
8.4.1. REQUIREMENTS. Establish three permanent survey marks on, or within one km of, the airport. One of these marks must be designated the Primary Airport Control Station (PACS). Horizontal and vertical datum ties must be made directly between the PACS and the National Spatial Reference System (NSRS). The other two marks must be designated Secondary Airport Control Stations (SACS). Horizontal and vertical connections must be made directly between the SACS and the PACS. 8.4.2. MONUMENT SELECTION. Proper monument site selection for PACS and SACS is a primary goal for these surveys and must be carefully considered. Consider the following basic factors when using a existing site or selecting a new site.
a. Monument stability. b. Intervisibility requirements. c. Visibility from the monuments to airport features such as runways, navigation aids, and airport obstructions off the end of runways
d. Any previous high accuracy connection to the National Spatial Reference System (NSRS).
e. Accessibility and survivability of the monuments.
8.4.3. USE OF EXISTING STATIONS. Use existing stations as the PACS and SACS if they meet the accuracy, siting, construction, accuracy’s and other criteria identified in advisory circular. 8.4.3.1. CONTROL STATION SELECTION PRIORITIES–PACS. An existing mark may be used as a PACS if the mark meets the stability codes of A or B in that order of preference (see mark stability standards in paragraph 8.5). An existing concrete mark with stability code C (and 4+ feet deep, belled bottom) may be used for a PACS if the monument meets the following seven (7) requirements.
a. The disk already exists.
b. The monument is poured in place in concrete.
c. The monument is a triangulation station, reference mark, azimuth mark, or bench mark stamped “U.S. Coast and Geodetic Survey”, or any mark stamped “National Geodetic Survey”.
d. The monument is set below the frost line.
e. The monument is set in non-expansive soils.
Figure 8.11. Identifies some key points about the proper setup for GPS positioning. f. The monument shows no evidence of movement.
g. The monument meets all siting, construction, and intervisibility requirements. Note: An existing HARN station (“A” or “B” order station) does not necessarily qualify to be a PACS; it must still meet PACS stability and siting requirements. 8.4.3.2. CONTROL STATION SELECTION PRIORITIES–SACS. An existing mark may be used as a SACS if the mark meets the stability codes of A, B, or C in that order of preference. Other USC&GS, NGS, or NOS marks should be used as SACS if they meet all siting, construction, and intervisibility requirements.
8.4.4. MONUMENT ACCESSIBILITY.
Figure 8.11 · page 30Picture of the page from the copy saved here
The monuments must be accessible to survey crews, and allow for unattended, secure setup of GPS equipment for long periods without hindering airport operations. PACS and SACS must allow for setup of both conventional (optical) and satellite surveying equipment. If possible, SACS should be sited on high ground near the approach end of the primary runways so they can be better utilized for obstruction surveys. Monuments must be established in areas clear of future construction, and should be slightly recessed to protect them from snow removal and mowing equipment. 8.4.5. MONUMENT SITING CONSIDERATIONS. Consider the following items in the siting of all monuments (new or old, control station or local network station) in the project. The object of these standards is to ensure the stations are stable and usable years after the survey is completed. Give equal weight to each consideration item listed below.
a. Adequate GPS satellite visibility (unrestricted at 15 degrees above the horizon). Minor obstructions are acceptable, but must be depicted on the Visibility Obstruction Diagram.
b. Accessible by vehicle (two-wheel drive preferred).
c. Stability, bedrock being most preferred.
d. Permanency.
e. Ease of recovery.
f. Minimal multi-path.
g. Appropriate geographic location and spacing.
h. Location allows efficient use by surveying community.
i. Accessible by public. Public property should be utilized where feasible.
j. No known potential conflict with future development.
k. Aerial-photo identifiable. 8.4.6. PACS AND SACS PROXIMITY TO OTHER AIRPORT FEATURES. 8.4.6.1. Establish the PACS in a secure area on airport property. A GPS suitable site should be selected where surveying equipment may be left unattended at the mark with a minimum probability of disturbance.
8.4.6.2. SACS should be established on airport property if practical. However, if the siting requirements, such as, intervisibility and spacing as described below, cannot be met, one SACS may be set off the airport but no further than 1 km from the nearest airport boundary. 8.4.6.3. If establishing the PACS and SACS requires new monumentation, the new monuments should be set no closer than 60 meters from a runway edge, or 60 meters from the imaginary runway extension. If an existing control station is used, this station should be at least 15 meters from a runway edge. In all cases, PACS and/or SACS should be at least 400 meters apart. 8.4.6.4. Ensure sites selected for use as PACS AND SACS meet the following minimum distance requirements to other airport features. In addition to distance from other airport features, ensure the PACS and SACS are separated by at least 400 meters from each other. 8.4.6.4.1. PACS and SACS should be located so that a surveying tripod can be situated over the mark. In addition, if the mark could be in peril from snow removal, mowing, and other operations, it should be slightly recessed. 8.4.6.4.2. PACS and/or SACS must not be within 305 meters (1000 ft) of the critical side of an—
a. Instrument Landing System (ILS) Glideslope Antenna
b. Instrument Landing System (ILS) Localizer
c. Microwave Landing System Elevation Station
d. Microwave Landing System Azimuth Station 8.4.6.5. PACS and SACS should be strategically located so as to provide maximum use for subsequent surveys yet situated where the chances of future disturbance will be minimal. An elevated site with runway end visibility is desirable. PACS and SACS should also be located where future station occupation will cause no interference to or from aircraft, including from prop and jet blast. 8.4.7. INTERVISIBILITY CHOICES FOR PACS and SACS in order of priority are—
a. The PACS and both SACS are all intervisible with each other.
b. The PACS is intervisible with both SACS but the SACS are not intervisible with each other.
c. The PACS is intervisible with one SACS and both SACS are intervisible with each other. 8.5. MONUMENT STABILITY. Stability codes A, B, and C are defined in the Blue Book, Volume 1, Annex I, with examples given below. Only codes A and B are recommended, however concrete posts may be selected with code C stability if the mark is deemed stable from review of soil conditions and average frost depth.
a. Stability code A = expected to hold an elevation. Examples: rock outcrops; rock ledges; bedrock; massive structures with deep foundations; large structures with foundations on bedrock; or sleeved deep settings (10 feet or more) with galvanized steel pipe, galvanized steel, stainless steel, or aluminum rods.
b. Stability code B = probably hold an elevation. Examples: unsleeved deep settings; massive retaining walls; abutments and piers of large bridges or tunnels; unspecified rods or pipe in a sleeve less than 10 feet; or sleeved copper-clad steel rods.
c. Stability code C = may hold an elevation but subject to ground movement. Examples: Metal rods with base plates less than 10 feet deep; concrete posts (3 feet or more deep); large boulders; retaining walls for culverts or small bridges; footings or foundation walls of small to medium-size structures; or foundations such as landings, platforms, or steps. 8.6. MARK SETTING. After the Project Survey Plan is approved by NGS, fieldwork may begin. Marks must be set to NGS specifications for type, length, material, stability, stamping, driving, etc. outlined in NOAA Manual NOS NGS1, Geodetic Bench Marks, Floyd, 1978 and this document. The importance of setting quality monuments cannot be over emphasized. Properly located and set monuments provide decades of valuable use for surveying operations. Proper attention and workmanship must be given to all the steps in the process including the basic tasks of hole digging, rod driving, concrete mixing and pouring, and finishing the monument.
The only physical evidence remaining after a survey is completed are the monuments; therefore, permanency and neatness of the monument and the surrounding area are of utmost importance. Where new marks are required, PACS and SACS must be monumented in accordance with the following criteria: the paragraphs below, and the Appendixes to this document. Additional requirements are found in: Federal Base Network Station Selection Guidelines; and NOAA Manual NOS NGS1, Geodetic Bench Marks, Floyd, 1978. Proposed sites for new marks should be discussed with airport management after existing marks are recovered. Inquire about underground utilities and future construction affecting mark longevity. “MISS UTILITY”-type services offered through local utility companies should be contacted before driving rod or digging, and may be required by state or local regulation. The preliminary station descriptions and sketches must be updated after the mark is set, and photo type 1 (close-up, see 8.2.10.4.1 and Figure 8.5) must be captured along with updates of other photographs, as required.
For concrete marks, take a photograph after the hole is dug and before the concrete is poured showing a level rod in the hole (to show the depth of the hole). The file name for this photograph must start with “RE” for reconnaissance; see 8.2.10.4.7.3.
a. PACS. New PACS must meet stability code A or B requirements as defined in paragraph 8.5. New rod marks must meet the “Quality Code B” requirements found in the NGS Document NOAA Manual NOS NGS1, Geodetic Bench Marks, Floyd, 1978.
b. SACS. New SACS must meet stability code A, B, or C requirements as defined in paragraph 8.5. Bronze disks set in rock outcrops, massive structures, or as concrete monuments must be used for new SACS. 8.6.1. STAMPING. New PACS and SACS must have a unique stamping. Marks set at an airport with an official FAA location identifier must be stamped with that identifier, followed by a sequential letter, followed by the year the mark was set. Disks and “logo caps” must be stamped before they are set in place. 8.6.2. BRONZE DISKS. 8.6.2.1. Standard bronze, horizontal disks must be used for rock outcrop, massive structure, and concrete marks. A rock outcrop in which a disk is set must be hard and a part of the main ledge and NOT a detached fragment. A disk set in a drill hole must be well countersunk and adequately fixed in place using highway epoxy or equivalent material. The disks must be fastened so they will effectively resist extraction, change of elevation, or rotation. Disks also must be well countersunk in areas where snow plowing is possible. If the top of the disk is not below the level of the surrounding material, a snow plow can scrape off the brass from the top of the disk or, worse, break the disk off the stem. Traditionally, NGS has set disks so the lettering can be read normally (correct side up) when the observer is south of the disk and facing north across the disk.
8.6.2.2 SETTING A DISK IN BEDROCK OR A STRUCTURE. Sound bedrock is the most desirable setting for geodetic survey control points. Besides the ease and cost effectiveness with which a disk can be installed in bedrock, it provides the most stable setting for use in terms of both underground activity and disturbances inflicted by people. Always use bedrock when a suitable outcrop exits. As a rule of thumb, the bedrock is considered potentially good if the distance between joints and fissures is greater than 1 meter. The National Geodetic Survey geodetic control disks are made of brass or bronze. They are about 9 centimeters in diameter and have a spherical surface to support the foot of a leveling rod and a center point for plumbing survey equipment. Information is imprinted on this surface to identify the monument and to aid the user in obtaining data on it. This logo is recessed so it does not interfere with the leveling rod or other survey equipment. A deformed shank, about 7.5 centimeters long, is silver-soldered or otherwise attached to the bottom surface of the disk to help prevent the disk from being dislodged.
Figure 8.13. Illustrates the proper methods for establishing a Bronze Disk in an outcrop.
The step-by-step procedure for setting the disk in bedrock utilizing cement is as follows:
a. Stamp the station designation and setting year on the top surface of the disk using 4.75-millimeter (3/16-inch) alphanumeric steel dies.
b. Pick a fairly level and accessible spot on the outcrop that is fully attached to the bulk of the rock. A simple test can be performed to help determine the condition and integrity of the rock by placing ones hand in the area that the disk will be set, then striking the outcrop with a moderately heavy hammer and feeling for vibration. Sound outcrop will force the hammer to rebound with each impact and vibration through the rock should be minimal at best.
Figure 8.13 · page 34Picture of the page from the copy saved here
c. Drill a 2.5-centimeter diameter hole about 10 centimeters into the bedrock and recess the area around the top of the hole to a diameter slightly larger than that of the disk. When the installation is completed, the top of the surface of the disk should sit level and slightly below the surface of the surrounding rock. Chisel a drain channel through the low edge of the drilled recess to allow water to drain from around the finished mark. Safety goggles should be worn when drilling into bedrock or masonry.
d. Clean the disk by wetting then rubbing all surfaces with cement to remove unwanted oils and rinse. Fill the depression on the underside of the disk with mortar using a trowel. Hold the disk loosely upside down by the end of the shank, then gently tap the domed surface of the disk from below with the handle of the trowel several times. This will allow the mortar to settle and trapped air to escape. This is very important because it will prevent the existence of highly undesirable voids under the disk once it is in place.
e. Place the shank of the disk into the drilled hole and press the mark firmly into place. A slight rotation of the disk back and forth and gentle tapping with the end of the trowel handle helps settle the disk completely and evenly into the drilled recess in the bedrock. The disk is considered set when the slight back-and-forth movement stops and the disk sets firmly in place. Work excess mortar around the outer edge of the disk, making sure it is smooth and slightly overlapping the top outside edges of the disk for security. An exposed edge of the disk would provide an area that could be used to dislodge it. Fresh mortar on the upper surface of the disk can be easily cleaned off and out of any stamping.
f. Sprinkle some dry cement on the exposed surface of the disk, then rub it with a clean rag or short bristled brush using circular strokes. This will clean the disk very nicely, removing all excess mortar from its surface and recessed letters. Rubbing the wet mortar around the edge of the disk in the same manner is done intentionally to finish its surface and help prevent cracking. Brush away loose cement and make sure the finished product has a neat appearance.
g. While the mortar is still wet, it must be covered to prevent heavy rains or other foreign debris from ruining its surface and to conceal the disk from people who might tamper with it. A piece of wood, cardboard, heavy paper, or similar biodegradable item will suffice.
The installation is complete. Once all accumulated trash is picked up, leave the site clean and in good order.
8.6.3. STAINLESS STEEL ROD MARKS. A stainless steel rod three-dimensional (3-D) drivable survey monument is the recommended survey marker producing the stability required for most conditions. These monuments are suitable for a PACS if the stability meets code “B” (see paragraph 8.5 for stability requirements) requirements. The principal component of this monument is a 9/16-inch stainless steel rod driven into the ground, utilizing a gasoline-powered
Figure 8.13. Example 3-D Monument.
reciprocating hammer, until refusal or a reduced driving rate has been achieved. The rod must be driven until the rod refuses to drive further, or until a driving rate of 60 seconds per foot is achieved. The rounded top of the rod is the survey datum point. Record the length of rod driven for entry into the station description. The minimum acceptable length of rod is 4 meters (see Table 3, page 27, Geodetic Bench Marks) unless the rod becomes embedded in rock and cannot be extracted. New rod marks should be allowed to settle for at least 1 day before observations. A 1-meter long, grease-filled finned sleeve must be used with this mark. These monuments have the upper 3 feet of the rod encased in a 1-inch grease filled
plastic extruded fin sleeve held horizontally stable by back-filled, washed sand. Effects of up-and-down ground movement during freeze/thaw or wet/dry conditions are alleviated by the grease-filled sleeve promoting vertical stability. A 5- or 6-inch PVC pipe with attached standard aluminum logo cap protects and identifies the top of the monument. Either a 5- or a 6-inch diameter PVC pipe may be used as long as the logo cap fits correctly. The logo cap can fit on either the inside or the outside of the pipe.
Figure 8.14. Cut-Away Illustration of 3-D Monument.
8.6.3.1. If bedrock is found only a few feet beneath the surface, a concrete mark may be set instead of a rod mark if the concrete will rest directly on the bedrock. Drill several holes in the bedrock so the concrete monument will be affixed to the bedrock. Utilize rebar to anchor the monument if feasible. The area of the bedrock where the concrete will be placed must be brushed or washed off thoroughly. Install a standard concrete monument with brass disk (see paragraph 8.6.4).
Figure 8.14 · page 36Picture of the page from the copy saved here
8.6.3.3. Recommended Equipment for Setting Monuments. This information and photographs in this document are intended only for the purpose of providing the user with guidelines for planning and implementing this style of survey monument. The distribution of this document or the mention of a commercial company or product contained herein does not constitute, in any way, an endorsement by the FAA, NGS, or any agency of the U.S. Government.
Figure 8.15. Shows the NGS Mark Setting Truck
and associated equipment Rod Drivers and Accessories:
Figure 8.15 · page 37Picture of the page from the copy saved here
1–Any driver with a minimum impact force of 25-foot pounds per blow, such as Wacker Model BHB 25 (with tool kit) or Pionjar Model 120 (with tool kit), for driving stainless steel rods. 1–Rod Driving Insert, holds machine on rod and acts as impact point while driving rods. 1–Shovel Bit, for machine to help start and dig holes (not required but might be helpful). 1–Pint Required Oil Type and Calibrated Container, for determining gas/oil mix. 1–Gas Container and Gasoline, for driving machine and generator. Digging the Hole: 1–Post Hole Digger, capable of digging a hole 4 feet deep. 1–Gas Powered Post Hole Digger with Augurs (not required but increases productivity). 1–Digging Bar, for rocks and hard to dig holes. Driving the Rod: 1–2-pound Hammer, to start rods, stamp designations, etc. 2–8-inch Quality Pipe Wrenches (i.e. Rigid), for attaching lengths of stainless steel rods. 1–Bottle Loctite, for cementing threads into the stainless steel rods. Finishing the Rod: 1–Hack Saw with extra Quality Blades, for cutting stainless steel rod. 1–4- or 5-inch Grinder (electric or battery powered), for finishing top of rod. 1–Gas Powered Electric Generator, to power grinder and or drill. 2–Sanding Disks (medium grade), for grinder. 1–Steel File(s), for fine finishing top of rod. 1–Centering Sleeve, to help center punch mark on top of rod. 1–Center Punch, to punch plumbing point on top center of rod. Assorted Sand Paper or Sanding Pad, for fine finish to top of rod. Finishing the Monument: 1–1/4-inch Stamping Set, for lettering and numbering station designation/date. 1–Hand Saw, for cutting 5- or 6-inch PVC pipe. 1–Bucket or Wheel Barrel, to mix cement/move unwanted dirt.
2–5-gallon Water Wontainers and Water, to mix cement and clean equipment. 1–Hoe, to mix cement (can be replaced by Sharp Shooter Shovel). 1–Heavy Rubber Mallet, to help lower logo cap/5- or 6-inch PVC pipe into cement. 1–Cement Finishing Trowel, to smooth top of concrete for neat appearance. 1–Stiff Vegetable Type Brush, to clean logo cap and hinges. Assorted Accessories: 1–Tool Box with regular assortment of tools, for incidental repairs: Slotted and Phillips Head Screwdrivers, Pliers, Needle Nose Pliers, Wire Cutters, Assorted Wrenches, Sockets, Allen Wrenches, Wire Brush. 1–Round Nose Shovel, to help dig hole and move unwanted dirt. 1–Tile Spade sometimes referred to as a Sharp Shooter Shovel, to help dig hole and mix cement. 1–Roll Black Tar Paper (Felt Paper), for making a round form for top of monument. 1–30-Meter Tape Measure, for distances in station description. Leather or Cotton Gloves. Assorted Rags or Paper Towels. Materials Required for Each Mark: Lengths of 9/16-inch Stainless Steel Rods, 4-foot sections.
1–4- to 5-inch piece of Stainless Steel Rod, used as impact point and protection while driving rods. Adequate supply of 3/8-inch Threaded Stainless Steel Studs. 1–Steel Spiral (fluted) Rod Entry Point, standard order. 1–Aluminum Logo Cap, standard order. 1–Schedule 40 PVC Pipe, 5- or 6-inch diameter, 24-inch length. 1–Plastic Extruded Fin Sleeve, 1-inch diameter, 3-feet minimum length. 2–Plastic End Cap Alignment Bushings, center drilled to 9/16-inch (for extruded fin sleeve). 1–Pint PVC Cement, can be replaced with adequate Epoxy type. 1–Pint PVC Cleaning Solvent, when using PVC cement. 1–17-ounce tube, Non-Toxic, Food Grade Grease, with Applicator (i.e. grease gun). Ready Mix Concrete (amount depends on width and depth of hole). 2–Pounds Portland Cement, added to enhance integrity of ready mix concrete if necessary. 0.5–Cubic Feet Washed Sand, fills bottom of hole and inside of PVC pipe around grease sleeve.
Setting Procedures: The time required to set an average mark using the following procedures is 2 to 3 hours. Several steps, such as steps C, D, and F, should be accomplished at a maintenance shop.
Figure 8.16. Initial Site Selection away from traffic areas.
Figure 8.16. Initial Site Selection away
from traffic areas. Figure 8.16. Initial Site Selection away from traffic areas.
a. Ensure the monument site selection is discussed with airport management and/or property owners, and the location meets all station siting requirements. Inquire about future construction that might affect mark longevity.
b. Contact “MISS UTILITY”-type services offered by local utility companies to inquire about underground utilities before digging or driving rod.
c. Stamp station designation and year of establishment into the blank area on the collar of the logo cap.
Figure 8.16 · page 39Picture of the page from the copy saved here
d. Cut a 20-inch section of 5- or 6-inch PVC pipe. Ensure the end that will receive the logo cap is cut true and is clean. Using primer and solvent cement formulated specifically for PVC, glue the stamped aluminum logo cap to the end of the 20-inch PVC section. If this step is performed on site, allow time for the glue to set by digging the hole and driving the rod after preparing the PVC and logo cap.
e. Using a power auger or post hole digger, drill or dig a round hole in the ground 12 to 14 inches in diameter and 22 inches deep. Extend the center of the bottom of the hole by drilling or digging a 3- to 6-inch diameter hole an additional 21 inches for a total depth of 43 inches. This extended area will be back-filled with washed sand around grease sleeve.
f. Glue both plastic end cap alignment bushings on a 3-foot section of the plastic extruded fin sleeve. Let glued ends dry completely. Pump food grade grease into capped sleeve until 3/4 full, allowing for displacement by rod and completing the grease filled sleeve.
Figure 8.18. Digging the 43" deep hole; 12"- 14" diameter for the top 22" in depth, and 3"- 6" diameter for the bottom 21"
Figure 8.17. Stamp the station designation on the collar of the logo cap
Figure 8.17. Stamp the station designation
on the collar of the logo cap.
Figure 8.18. Digging the 43" deep hole; 12"- 14" diameter for the top 22" in depth, and 3"- 6" diameter for the bottom 21" (Note, Dirt removed with a wheelbarrow)
Figure 8.18 · page 39Picture of the page from the copy saved here
g. Using a standard 3/8-inch threaded stud coated with Loctite™ (use Loctite™ on all permanent connections), attach two 4-foot sections of stainless steel rods together. At one end of the length of rod, attach a standard spiral (fluted) rod entry point with a 3/8-inch threaded stud. On the opposite end, attach a short 4- to 5-inch piece of rod with a 3/8-inch threaded stud. Tighten all connections using two pipe wrenches a 1/4 to 3/4 turn past the point of contact of all rod ends except the impact point, which will be continually removed. This tightening requires a certain “feel” and ensures that the rod ends are seated together with the greatest possible tension but not to the point of breaking a stud. Rods tightened in this fashion should not vibrate loose when they are driven into the ground.
h. Center the 8-foot-long connected rod into the bottom of the hole and drive with a 2-pound hammer until the rod is secure and as plumb as possible. A 2x4 with a 1/2-inch hole can be centered and braced over the hole to help guide the rod straight into the ground. Drive the section of rod to about the top of the hole with a gas-powered reciprocating driver, such as Whacker model BHB 25, Pionjar model 120, or another machine with an equivalent driving force.
Figure 8.19. Starting the stainless steel rod with a hammer.
Figure 8.19. Starting the stainless steel
rod with a hammer.
Figure 8.20. Driving the stainless steel rod to refusal.
Figure 8.20. Driving the stainless steel
rod to refusal.
Figure 8.19 · page 40Picture of the page from the copy saved here
i. Remove the short piece of the rod (impact point), leaving the threaded stud in the section of rod in the ground. Attach another 4-foot section of rod and, using a new threaded stud, thread on the impact point. This “cycling” of a new stud from impact point into the top of rods in the ground ensures unweakened studs at all connections. Remember to coat threads on the permanent connections with Loctite™. Tighten securely utilizing pipe wrenches as described above in step f. Always tighten rods maintaining a clockwise pressure to avoid loosening rods already in the ground. Drive the new length of rod into the ground with the reciprocating driver.
j. Repeat step I until the rod refuses to drive further (anchored) or until a driving rate of 60 seconds per foot is achieved. In the event the rod will not sufficiently slow down to meet desired driving rate, terminate upon reaching 90 feet (22.5 rods). This will leave about 2 feet of rod out of the hole. If possible, let the rod set overnight, then drive the remaining 2 feet of rod to determine whether driving rate has reduced. If the rod feels secure in the ground, use this depth even though the minimum
driving rate of 60 seconds per foot has not been met. If the rod turns freely in clockwise direction, contact NGS for a decision about driving additional rods. Sometimes, all that is necessary to achieve a well-anchored rod is driving it a few more feet. In other instances, an additional 100 feet might be required. Indicate in the written station description the depth of rod and whether it was driven to refusal or met the slow driving rate. Also include a description of any unusual mark setting circumstances.
k. When refusal or prescribed driving rate is reached, cut off the rod with a hacksaw or comparable tool, always removing at least the tapped and threaded portion, leaving the top of rod about 3 inches below ground surface. Shape the top of the rod to a smooth, hemispherical surface using
a portable grinding machine with a grinding attachment or sanding wheels, files, and sand paper to produce a nicely finished, rounded surface. Ragged edges or grinding marks are not acceptable on the top of the finished rod.
l. The datum point must then be created by center punching a dimple on top of the rod to provide a plumbing (centering) point. Place the centering sleeve over the top of the rounded rod to facilitate locating the exact center of the rod. Punch a substantial dimple, 1/16-inch deep, into the top of the rod using a punch and hammer or spring-loaded center punch. Several blows might be needed to create a sufficient dimple. Remember, this is the actual survey point, so do not hesitate to spend a few
extra minutes to produce a professional, finished product.
m. Insert the grease-filled sleeve, produced in step E, over the rod with the unfilled portion at the top. The upper end of sleeve will fill as the rod displaces grease from the bottom. The datum point on the top of the rod should protrude through top of the sleeve about 3-inches with the sleeve extending to the bottom of the hole. Clean the residual grease off the exposed top of the rod.
Figure 8.21. Cutting off the top of the stainless steel rod using a hydraulic cutter approximately 3 inches below the surface.
Figure 8.21. Cutting off the top of the stainless steel rod using a hydraulic cutter approximately 3 inches below the surface.
Figure 8.22. Cutting off the top of the stainless steel rod using a hydraulic cutter approximately 3 inches below the surface.
Figure 8.22. Cutting off the top of the stainless steel rod using a hydraulic cutter approximately 3 inches below the surface.
Figure 8.23. Preparing one-inch PVC grease filled “finned” sleeve.
Figure 8.23. Preparing one-inch PVC grease
filled “finned” sleeve.
Figure 8.21 · page 41Picture of the page from the copy saved here
n. Back-fill and pack with washed sand the bottom 23 or more inches of the hole around the outside of grease sleeve. This fills the bottom of the hole and helps stabilize the sleeve.
o. Place the 5- or 6-inch PVC pipe and logo cap over and around the grease sleeve and rod in the center of the hole. The bottom of the PVC pipe should extend into the top of the sand in the bottom of the hole. Leave the top of the logo cap and PVC pipe slightly higher than the top of the ground surface until the concrete is in place. Back-fill the center of the PVC pipe with washed sand around and to within 1-inch from the top of the grease-filled sleeve. The rod should be centered in the PVC pipe.
p. Mix concrete in a bucket or wheel barrel to a pasty, well-moistened consistency, like mashed potatoes. Add Portland cement, if necessary, in sufficient quantity (1 to 2 pounds) to enhance concrete mix or dry an over-moistened mixture to maintain adequate consistency. A good indication of adequate consistency is that the mix neither runs nor falls off the
shovel but sluggishly slides off and flattens upon hitting the ground. Pour concrete into the hole around the logo cap and PVC pipe casing, filling to slightly below the ground surface.
Figure 8.24. Backfilling the bottom two feet of the hole with washed sand
Figure 8.24. Backfilling the
bottom two feet of the hole
with washed sand
Figure 8.25. Preparing to place 5 or 6 inch PVC pipe over and above the centered grease sleeve and stainless steel rod
Figure 8.25. Preparing to place 5 or 6 inch PVC pipe over and above the centered grease sleeve and stainless steel rod
Figure 8.27. Shaking the PVC pipe to settle concrete and fill any voids.
Figure 8.26. Mixing concrete for use in completing the monument.
Figure 8.27. Shaking the PVC pipe to settle concrete and fill any voids.
Figure 8.24 · page 42Picture of the page from the copy saved here
q. To avoid frost heaving of the PVC collar, a round form should be used to ensure the outside walls of the concrete are vertical and do not produce a mushroom-shaped wedge at the top of the mark. Open the logo cap and grasp the PVC pipe, then shake to settle concrete around the pipe to fill voids. Add concrete to within 1/2-inch of the ground surface.
r. Trowel smooth the top of the concrete to a fairly finished surface. Tap alternate edges of the logo cap, using a rubber mallet or hammer and wooden block, lowering it and attached PVC pipe into the surface of the concrete. Finish the top of the concrete by troweling a smooth, finished surface, round in appearance, and sloped slightly outward to aid drainage of rain water.
Figure 8.27a. Trowel the top of the concrete until there is a smooth finished surface.
Figure 8.27a. Trowel the top of the concrete until there is a smooth finished surface.
Figure 8.28. Completed monument and access cover should be slightly lower than the surface of the ground.
Figure 8.27a · page 43Picture of the page from the copy saved here
Figure 8.28. Completed monument and access cover should be slightly lower than the surface of the ground.
s. Add sand to the inside of the PVC pipe to bring its level to within 1 inch of the top of the grease sleeve. Clean any overlapping concrete from the surface of the logo cap using the vegetable brush. The finished height of the logo cap and access cover should be slightly lower than the surface of the ground. The logo cap should be approximately in the center of the top of the concrete. The datum point should be about 3 inches below the cover of the logo cap and centered in the 5- or 6-inch PVC pipe. The top of the grease-filled sleeve should be about 3 inches below the datum point and the washed sand 1 inch below top of the sleeve. Clean any cement that might have gotten onto the exposed rod or datum point.
Figure 8.28 · page 43Picture of the page from the copy saved here
t. Clean all equipment and remove all debris, such as extra cement, excess dirt, and trash, leaving the area in the condition it was found. 8.6.4 CONCRETE MARKS. New concrete marks, with standard NGS bronze disks, may be used for SACS only. Construction requirements are detailed below. New concrete marks should be set slightly recessed with the ground and allowed to settle for at least 1 day before observations. Disks set in concrete must be centered in the top of the concrete surface and be flush or slightly recessed with the surface of the concrete; the top of the disk must be free of concrete. A round form must be used for the top of all concrete marks and logo cap protective collars. This will help ensure a neat finish and help protect against “mushrooming”, which can result in frost heave. Black tar paper (felt paper) or ready-made cardboard frames (available at
home supply stores) can be used to easily construct a form. All loose concrete and other debris around the construction site must be removed and the site left in excellent condition. 8.6.4.1. CONCRETE CHARACTERISTICS. 8.6.4.1.1. GENERAL. The concrete should be workable, strong, and durable. Workability refers to the ease concrete can be effectively placed, consolidated, and finished while remaining free from segregation. Workability depends on the proportions of the ingredients and the shape of the individual particles of aggregate. Strength refers to the ability to withstand external forces without rupturing. For survey monuments, high strength is not the most important property, although strong concrete usually indicates it is durable. Durability is the ability to withstand deterioration over a long time and is primarily influenced by the water tightness of the cured concrete. 8.6.4.1.2. DESTRUCTIVE FORCES. Several forces can lead to weakening or deterioration of concrete.
The freezing of water in cured cement exerts great pressure against the inner walls of the pores, tending to break down the concrete. In fresh concrete, the expansion of freezing water breaks the bonds developing between solid particles, making the concrete weak and porous. Leaching and chemical attack are also detrimental effects on concrete. Leaching occurs over a long period when water slowly percolates through concrete and dissolves some of its constituents. Chemical attack is particularly common in alkali soils. Dense, impervious concrete is resistant to these destructive forces. 8.6.4.1.3. INGREDIENTS. The quality of the ingredients and their proportions help determine how dense and impervious the cured concrete will be. The ingredients include aggregate, cement, and water. The aggregate should be clean (free from silt and clay, harmful chemicals, and organic matter) and well-graded, i.e., it contains proportionate amounts of many particle sizes.
In specifying mix proportions, the aggregate is usually divided into two parts—sand (particle size less then 2/3 cm) and gravel (particle size greater than 2/3 cm). Both parts should be well-graded. Porous aggregates split easily or are otherwise weak or permeable resulting in poor concrete. Examples of poor aggregates include shale, claystone, sandstone, and micaceous rocks. Portland cement is designated by one of five types. Type I is for general use where no special properties are needed. Type III is a high-early-strength type for use when concrete will be curing during cold weather. Type V is used where the concrete will be subject to an alkali environment. Types II and IV are not suited for setting marks. Contact local concrete companies to determine the best concrete type for use in the work area. The water used in a concrete mix should be relatively free of impurities such as acids, alkalies, salts, oil, organic matter, and silt. These can decrease the strength and durability of cured concrete. As a rule, do not use water that you would not drink. 8.6.4.1.4.
MIXING, PLACING, AND CURING. Pre-mixed concrete materials may be used. If raw materials are used, the suitable proportions (by bulk volume) of cement to sand to gravel are 1:2:3. If the gravel is made up of fragmented or angular particles, use a little less gravel and proportionately more sand. Add only enough water to make the mix workable. About half the water added to the mix is used in the chemical reaction (hydration) that causes the paste to harden into binder. If too little water is used, however, the mix will not compact properly, and
spaces will be left in the mass. A good indication of the right amount of water is that the mix neither runs nor falls off the shovel but sluggishly slides off and flattens upon hitting the ground. 8.6.4.1.5. COLD WEATHER PRECAUTIONS. The freezing of fresh concrete has a damaging effect because the expansion of water as it freezes separates the solid particles in the mix. This reduces the strength of the bond and makes the concrete more porous and correspondingly less durable. Three protective measures should be taken in cold weather, either singly or in combination.
8.6.4.1.5.1. USE WARM INGREDIENTS. During the first 24 hours after a mix has been placed, it develops little heat of its own to prevent freezing. After 24 hours some heat is developed as a product of the chemical reactions occurring in the mix. The use of warm ingredients is especially beneficial during the first 24 hours. Note, however, that mixing water above 165° F could cause a flash set. To keep the aggregate and cement warm, store them indoors. 8.6.4.1.5.2. Use Type III (high-early-strength) cement or special additives that speed curing. Calcium chloride is good for this in amounts not exceeding 2 pounds per 94-pound sack of cement. The calcium chloride should be dissolved in the mixing water instead of mixing it with the other ingredients. Other additives include Thoroguard ™ and Trimix ™. If a large number of concrete marks are being installed by mass production using a “ready-mix” concrete, fast-curing additives should not be added until the concrete is delivered on site. 8.6.4.1.5.3. Insulate the finished mark for a week after the concrete is poured. One method is to cover the mark with boards resting on supports. This construction is covered with paper or plastic, then by a layer of straw, Styrofoam, or similar insulating materials more than 15 centimeters thick and finally by a layer of soil 15 to 30 centimeters thick. Pile snow loosely on top if it is available. 8.6.4.2. CONSTRUCTING CONCRETE MONUMENTS1 STEPS.
a. Obtain permission from the property owner before proposing new mark locations.
b. Install a tall stake (lath) at each proposed site for a new mark. Write the proposed station name on the stake.
c. Obtain clearance from “MISS UTILITY“-types services offered by local utility companies (underground utilities) before digging.
d. Drill or dig a 12- to14-inch diameter hole in the ground 3.5 to 8 or more feet deep. The depth depends on frost penetration in the area. The minimum depth is 3.5 feet. Keep the sides of the hole as smooth as possible. The rounded, bottom portion of the monument must extend at least 1 foot below the frost line. See NOAA Manual NOS NGS 1, Geodetic Bench Marks, which contains a diagram showing average frost line depth. 1 Portions of this paragraph apply to concrete collars around rod marks as well as to concrete monuments.
e. Enlarge the bottom portion of the hole using a shovel, such as a “sharp-shooter” (also called a “drain spade”) so the hole is at least 2 inches larger in radius than the main shaft of the hole. This will make the bottom of the monument bell-shaped; see Figure 8.15.
f. Remove or tamp down the loose dirt at the bottom of the hole.
g. Remove any loose dirt that might fall into the hole during concrete installation. A layer of loose dirt from the sides or top of the hole, mixed with the concrete, will create a fracture line (or plane), which could lead to the monument breaking, thus destroying the mark.
h. Procure a round, cardboard form 12 inches in diameter to line the top 12 to 18 inches of the hole. Test fit the form in the top of the hole. This form will help avoid any shoulders or mushrooming effect near the top of the monument, which might allow for frost heave. The form will also help make a neater looking monument. A cardboard, biodegradable, 12-inch diameter form is commercially available. Allow the form to protrude from the ground 2 to 6 inches.
i. Mix the concrete well before it is placed, otherwise the minute particles of cement will not be sufficiently wet and the aggregate will not be completely covered with paste. Prior to adding water, mix the ingredients well. Then, slowly add water and continue to mix. Do not make the mixture too wet.
j. Dampen the hole before concrete is added so moisture will not be drawn from the fresh concrete into the surrounding soil. In no case should it be so wet as to be muddy.
k. Place concrete in the hole. Continuously tamp the mix into a compact mass so it becomes less pervious and consequently more durable. Do not contaminate the interior of the monument with dirt.
l. Place the form into the hole when the level of the concrete is approximately 1 foot below the surface. Continue to be careful not to allow any dirt to fall into the hole.
m. Add concrete until the top is even with or slightly below the surface of the ground. This helps ensure the monument is not struck by lawn mowers, snow plows, etc.
n. Smooth off the top of the monument with a trowel. Create a gentle slope toward the outside so rain water will drain off. Bevel the outside edge of the monument.
o. Stamp the disk prior to installing it in a concrete monument or a drill hole. Stamp the disk on a stamping block that has a curved surface that matches the curvature of the underside of the disk. Neatly stamp the station designation (name) above the triangle, centered below “HORIZONTAL CONTROL MARK”, and then stamp the year below the triangle.
p. Set the disk into position in the top center of the monument with the top of the triangle below the name pointing north (so a visitor facing north will be able to read the disk's
lettering). Placing a small amount of concrete on the underside of the disk before setting helps ensure that air is not trapped under the disk.
q. Press the disk into the concrete until the disk edge touches the concrete. Then tap the disk with the handle end of the trowel until the top edge of the disk is flush with or slightly recessed into the concrete (to the point that vandals can not get a pry bar under the disk). Do not recess the disk a greater amount because this makes a hollow that will collect rainwater and possibly shorten the life of the mark due to freezing action.
r. Clean the disk. Sprinkle some dry cement on the exposed surface of the disk, and then rub it with a clean rag or short bristled brush using circular strokes. This will clean the disk, removing all excess mortar from its surface and recessed letters. Rubbing the wet mortar around the edge of the disk in the same manner is done intentionally to finish its surface and help prevent cracking. Brush away loose cement and make sure the finished product has a neat appearance.
s. Cover the mark for at least 7 days. This prevents rain from making the mix too wet and from ruining the finished surface. It also prevents the surface from drying too rapidly, leaving too little water for complete hydration. In addition, it prevents debris from sticking to the surface of the wet concrete. A 12-inch diameter lid is available that fits on the 12inch cylindrical form. This lid will also keep out the dirt during the next step and final clean up.
t. Replace dirt round the form and tamp into place. At the surface, replace dirt and sod around the form and tamp into place.
u. Rake the area until neat, and remove excess materials. Do not leave any construction or other materials at the site. Leave the area as neat as or neater than when you arrived. Note: The protruding form and lid must be removed later during survey observations.
v. Remove excess dirt and dispose of it properly. In some rural areas there might be a logical spot to dump the extra soil. If the mark is in an area consisting of groomed lawns, the dirt must be removed from the site. Figure 8.29 Cut-Away Illustration of Concrete Monument.
w. Remove excess concrete from the
site. Proper planning should minimize excess concrete. Any excess must not be dumped onsite.
x. Installation of NGS Witness Posts (see paragraph 8.6.5) are at the option of the firm. Generally do not use Witness Posts in areas of high population density nor on airports. They are very useful to future surveyors in more remote areas.
y. Do not add magnetic materials to the monument. 8.6.5. WITNESS POSTS. Placement of witness posts on airport property must be pre-approved by the airport manager. Witness posts should be used on an airport only when they can be placed in a non-obtrusive area, such as a fence line or no-mow/snow plow area, and should be driven as deep as practical so they do not obstruct any restricted safety areas. Witness posts should not be used when the property owner objects, when the post cannot be driven, or when the mark should not be made easily visible because of a high risk of vandalism.
8.7. GPS POSITIONING PROCEDURES.
GPS observation requirements are detailed in the paragraphs below. A GPS equipment list and GPS observation scheme must be approved by NGS prior to commencing the field observations. Observing windows must be selected, and modified as necessary, to maximize satellite visibility and minimize Positional Dilution of Precision (PDOP) for each session. Incorporate any information from Notice Advisory to NAVSTAR Users (NANU) messages, available from the USCG Navigation Center webpage, when scheduling GPS observations to ensure optimal survey conditions.
Figure 8.30. Illustrates how PACS are tied to the NSRS.
Figure 8.30 · page 48Picture of the page from the copy saved here
8.7.1. CORS SELECTION. The CORS sites selected must be included in the NGS National CORS system. Use as many National CORS sites in the project area as feasible. Position each PACS directly to the nearest National CORS station. In areas such as Alaska where a PACS is not within 300 km of a CORS, a CTCORS must be established. CORS maps, data, and information are available on the NGS National CORS website (see Appendix 7 for access). Each CORS is designated by a three- or four-letter name, followed by the antenna number. The correct antenna name must be used when downloading data and the antennas coordinate information. Each CORS site usually has two or more antennas. Check the
“data availability” feature on the NGS CORS website to determine which CORS antenna was in use during observations and to see if there are any gaps in the data. The CORS station coordinate file contains several positions based on different Antenna Reference Points (ARP), in either the International Terrestrial Reference Framework (ITRF) or NAD 83 reference system. Ensure the proper coordinates are used when processing the data. The survey disks (usually two) at each CORS site might have names similar to the antenna names. Take care not to confuse the disk names and positions with the antenna names and positions. The weekly CORS Newsletter is available through the NGS CORS webpage. The Newsletter provides information on the status of the CORS system. Users may subscribe to the newsletter at this site. 8.7.2. CTCORS SELECTION. A Central Temporary Continuously Operating Reference Station (CTCORS) must be used if the nearest CORS is more than 300 km from the PACS.
The CTCORS must be established by setting up a GPS receiver on a suitable existing horizontal NSRS station and must provide the CORS function in the positioning of the PACS. The position of the CTCORS must be verified by using the GPS observation requirements in paragraph 8.7.3.1. Because of the long distances involved and the additional stations being positioned from the CTCORS, extreme care should be taken during the observation and processing of this data. Separate tripod setups are required at both the CTCORS and the PACS for each session. During all CTCORS operations, ensure the CTCORS antenna remains fixed. Sandbags are recommended to stabilize the tripod, and frequent checks should be made of the antennas centering and height. CTCORS Station Selection Criteria are listed below. The CTCORS station selection must be approved by NGS prior to commencing field observations.
Table 8.2. CTCORS Station Selection Criteria.
PRIORITY TYPE OF STATION STATION IS BENCH MARK
STATION IS AT AIRPORT 1 WAAS, USCG, or USACE CORS mark YES YES 2 WAAS, USCG, or USACE CORS mark YES NO 3 WAAS, USCG, or USACE CORS mark NO YES 4 WAAS, USCG, or USACE CORS mark NO NO 5 A-ORDER HARN STATION YES YES 6 A-ORDER HARN STATION YES NO 7 A-ORDER HARN STATION NO YES 8 A-ORDER HARN STATION NO NO 9 B-ORDER HARN STATION YES YES 10 B-ORDER HARN STATION YES NO 11 B-ORDER HARN STATION NO YES 12 B-ORDER HARN STATION NO NO Acronyms: Wide Area Augmentation System (WAAS); FAA U. S. Coast Guard (USCG)
U.S. Army Corps of Engineers (USACE) High Accuracy Reference Network (HARN) 8.7.3. ACCURACY STANDARDS. The required accuracy standards for PACS and SACS are outlined in Table 8.3.
Table 8.3. PACS and SACS Accuracy Standards.
VERTICAL ITEM HORIZONTAL ORTHOMETRIC ELLIPSOID Primary Airport Control Station (PACS)
1 5 cm 25 cm 15cm
Secondary Airport Control Station (SACS) 2 3 cm 5 cm 4 cm
Wide Area Augmentation System (WAAS) Reference Station 1 5 cm 10 cm 10 cm
Wide Area Augmentation System (WAAS) Reference Station 3 1 cm 0.2 cm 2 cm
Notes: 1 Accuracies are relative to the nearest NGS- anctioned CORS. s 2 Accuracies are relative to the PACS and other SACS at the airport. 3 Accuracies are relative to the other WAAS Reference Station at the site. 8.7.4. GPS OBSERVATION REQUIREMENTS. GPS observation requirements are described in the sections below for each type of mark. When 4hour sessions are specified, at least 4 hours of data are required in the final computer reductions. Observation of sessions longer than the minimum is highly recommended. Separate tripod setups are required for each session.
Figure 8.31. PACS are tied to the NSRS. Several PACS can share common points.
8.7.4.1. CTCORS SITES. The position of the CTCORS must be checked by observing three or more independent, continuous, simultaneous observation sessions of at least 4 hours with a CORS station. These sessions should be the
Figure 8.31. PACS are tied to the NSRS. Several PACS can share
common points.
Figure 8.31 · page 50Picture of the page from the copy saved here
first sessions observed while positioning various PACS. In addition, one 4-hour session must be used as a check at the end of the project. If the distance between the CORS and CTCORS is greater than 300 km, or at extreme latitudes, contact NGS for guidance on increasing the length of observation sessions. All CTCORS must be tied by GPS surveys to nearby GPS-suitable, North American Vertical Datum of 1988 (NAVD 88) bench mark(s). See specific requirements in the Bench Mark Ties section in paragraph 8.7.4.4.
2 8.7.4.2. PRIMARY AIRPORT CONTROL STATION (PACS) AND HARN TIE . Each PACS must be positioned from the CORS/CTCORS in two or more independent, continuous,
observation sessions of at least 4 hours in length. The observations to position the PACS must be
performed simultaneously with the
CORS/CTCORS observations. The start time of a PACS observing session on subsequent days should be at least 2.5 hours different than the previous PACS session to incorporate different satellite geometry. All PACS must have a separate positional check by simultaneously observing at least one session of 4 hours or more in length with an “A” or “B” order HARN station. The HARN station should be within 100 km of the PACS and should be at least 50 km from the CORS. Tie to as many “A“ order stations as possible during the project. Figure 8.31a. GPS Positioning of the PACS using CORS and HARN stations.
Figure 8.31a. GPS Positioning of the PACS using CORS and HARN stations
Figure 8.31a · page 51Picture of the page from the copy saved here
A single HARN station meeting the distance requirements to more than one PACS can be used. Generally, no more than two PACS should be tied to a single HARN station in one session. Use additional observation sessions on the same HARN, or occupy an additional HARN station to satisfy the HARN tie to other PACS in the same area. An existing “A”or “B” order HARN station on an airport should be used as a PACS if it meets the siting, construction, and intervisibility requirements. The station must be checked with at
2 If a CTCORS is required for connections, substitute CTCORS for CORS.
least one 4-hour session to a CORS. A tie to an additional HARN station is not required. The vector processing results of the two PACS sessions must check within 3 cm. The final adjusted positions of the HARN ties should check within ±5 cm horizontal and ±10 cm ellipsoidal height of the published positions. 8.7.4.3. SECONDARY AIRPORT CONTROL STATIONS (SACS). Each SACS must be observed in two or more independent, continuous sessions of at least 1.5 hours. The session start times must be separated by at least 2.5 hours to ensure a significant change in satellite geometry.
a. These observations must be simultaneous with PACS observations for that airport.
b. If a SACS is also one of the bench marks or a HARN tie (see paragraph 8.7.4.4), the two or more 1.5-hour sessions are adequate for the tie, rather than the normal 4-hour requirement. This is due to the short distance from the PACS to the SACS.
Continue reading ↓ 120 of 229 passages shown