AC 150/5000-12 Announcement of Availability: Passenger Facility Charge (PFC) Application (FAA Form 5500-1)
Provides guidance for the submission of the PFC application. View more recent versions of the PFC Application.
This document is cancelled. It may have been replaced. Check the official source before relying on it.
U.S. Department Advisory of Transportation
Federal Aviation Administration Circular
Subject: ANNOUNCEMENT OF AVAILABILITY-- Date: 7/15/94 AC No: 150/5000-12 PASSENGER FACILITY CHARGE (PFC) Initiated by: APP-530 Change: APPLICATION (FAA FORM 5500- 1)
1. PURPOSE. This advisory circular provides guidance for Lhe submission of the Passenger Faciiity Charge (PFC) application, FAA Form 5500-1, Appendix 1. A pubiic agency may apply for the authority to impose a PFC at any commercial service airport it controls to finance airport-reiated projects to bc carried out at that airport or at any existing or proposed airport which the public agency conmols. Federal Aviation Regulation (FAR) Part 158 gives complete details on how to complete the application.
2. HOW TO ORDER. Copies of FAA Form 5500-1 may be obtained from any Federal Aviation Administration local Airports office. The National Stock Number is 0052-00-915-9000. For additional information, contact the local
rts office or the PFC Branch, FAA Headquarters, (202) 267-3845.
?a~u
PAUL L. GALIS Director, Office of Airport Planning and Programming
1 AC 150/5000-12
7/1 5/94 Appendix
PASSENGER FACILITY CHARGE (PFC) APPLICATION
(FAA FORM 5500-1)
-! . . . ,. YE . . ...-=. - , .“–”.,., , t! Passenger Facility Charge (PFC) Application US Oeponment of Trans~rlot#on Federal Avlatlon Administration
(FAA FORM 5500-1)
, ,,,::..<>.~..,.;,,.,~ ., ,,.: ,... ~ FAA USE ONLY I >. 1. Appllcatlon Type (Check all fhal app/y) -.— .—. -,- .- _.. . q a. Impose PFC Charges Data Received Action q Approvad Date of
U b. Use PFC Revenue q Approved in Pad Actton: q C)sappreved PFC No.: . . ..: ... ~..,.: ..:. .’ ... ,..::....’.’>:.. :..,.,. q c. Amend PFC No: ~_ ..—_ ‘ _,,..J
PART I
PART I
2. Public Agency Name, Address, and Contact Person 3. Airport(a) To Use
Agency Name
Address
City, State, ZIP
Contact Person
PART II 4. Charqes
a. Airport 10 Impose: b. Total Estima!ed Net c. Level: d. Proposed Effective Date e. Estimated Expiration Date:
PFC Revenue q $1.00 q $2.00 q $3.00
PART II 4. Charqes
PART Ill 5. Attachments (Check all Thaf App/y)
Attached Submitted with Application Dated
Airporf Capital Improvement Plan
bun Project Information
con
a170
Air Carrier Consultation information
don Request to Exclude Class(es) of Carriers
elJ(J Alternative Uses / Projects
fun
6a. Data of Written Notice to Air Carrier% 6b. Date of Consultation Meeting with Air Carriers:
PART IV
PART IV
7. With respect to this PFC application I hereby certify as follows:
To the best of my knowledge and belief, all data in this application are true and correct
This application has been duly authorized by the governing body of the public agency
The public agency will comply with the attached assurances if the application is approved; and
For those projects for which approval to use PFC revenue is requested, all applicable ALP approvals, airspace determinations, and environmental reviews required by the National Environmental Policy Act have been completed. — a. Typed Name of Authorized Rep!.-mlative b. Title c. Telephona Number
d. Fax Number
e. Signature of Authorized Representative f. Date Signed
-------- . klckl. Mclnl%ofc.ocukl FAA FOrm WXJU-1 [6-S41 ,., m.. w.,’. –”-- ! - .-./ 1
AC 150/5000-12 Appendix 1 7115/94
Instructions for Preparation of
Passenger Facility Charge (PFC) Application Form
1. Application Type (Check all that apply.)
a. Impose PFC Charges. Check box when applying for authority to impose.
b. Use PFC Revenue. Check box when: (1) applying for authority to use where the authority to
impose a PFC has previously been approved or (2) applying for authori~- to impose and authority to use concurrently.
c. Amend PFC No. Check box when propmsing to amend an approved PFC. Enter the PFC number
assigned by FAA.
2. Public Agency Name, Address, and Contact Person. Enter the legal name and full address of the public agency as well as the name of a person to contact concerning the application.
3. Airport(s) To Use. Enter the official name of the airport or airports at which a PFC financed project is proposed.
4. Charges.
a Airport to Impose. Enter the official airport name at which the PFC is to be imposed.
b. Total Estimated Net PFC Revenue. Enter the total net PFC revenue estimated to be collected as a result of this application.
c. Level. Check the one block which reflects the PFC amount to be imposed.
d. Proposed Effective Date. Enter the proposed charge effective date, which is the date air carriers
are expected to begin collecting the PFC.
e. Estimated Expiration Date. Enter the estimated charge expiration date, which is the date carriers are expected to cease collecting the PFC.
5. Attachments.
a. Attached. Check each block that applies to the particular application being submitted. Additional details on each attachment are provided in the section entitled “Instructions for Attachments to PFC Application Form.”
b. Submitted With Previous Application Dated. Check each block that applies, i.e., the attachment
has been submitted with a previous application which has been approved. For each block checked, provide the date of the application with which the attachment was submitted.
6. a. Date of Written Notice to Air Carriers. Enter the date written notice was provided to air carriers as required by 14 CFR Part 158, section 15823(a).
b. Date of Consultation Meeting with Carriers. Enter the date of the consultation meeting as required by 14 CFR Part 158, section 158.23(a)(4).
7. a TYoed Name of Authorized Representative. Self-explanatory. . . b. Title. Enter the title of the authorized representative given in 7.a
c. Telephone. Enter the telephone number, including area code, of the authorized representative.
d. FAX Number. Enter the FAX number, including area code, of authorized representative.
e. Signature of Authorized Representative. Self-explanatory.
f. Date Signed. Self explanatory.
8. Submit two copies of be application and all attachments to the local FAA Airports Office. Also, submit one copy of the application and all attachments to:
Federal Aviation Administration Passenger Facility Charge Branch, APP-530 600 Independence Avenue, SW. Washington, DC 20591
iA Form 5500-1 [6-94 NSN: 0052-00-915-90@3
I
AC 150/5000-12 7/1 5/94 Appendix
Instructions for Preparing Attachments for PFC Application Form Section 5 of FAA Form 5500-1 (Put each applicable attachment on separate pages of plain bond paper)
a. Airport Capital Improvement Plan.
For an application to impose a PFC or a concurrent application 10impose and use, submit:
A copy of the airport capital improvement plan or other documentation of planned improvements (AIP, PFC, and non-federally funded) for each airport at which a PFC financed project is proposed.
For an application to use PFC revenue where authori(y to impose has been previously approved, include:
Any revision or update to the airport capital improvement plan since the previous approval,
b. Project Information.
Complete a separate Attachment B for each proposed project using the form provided. In addition to the hard copies submitted with the application, submit one copy of each Attachment B on a computer diskette in ASCII format. The following are instructions for completing the form. The paragraph of FAR PART 158 which pertains to the information required is provided in parenthesis.
(1) AIRPORT WHERE PROJECT IS LOCATED [158.25(b)[4)] (2) TYPE OF APPROVAL REQUESTED [158.25(a)] (3] PROJECT TITLE [158.25(b)(16)] (4) PROJECT DESCRIPTION [158.25(b](6]]:
a) For.ferminal development projects adding gates, include the number of gates being added. b) For a USE project where the impose authority was previously approved, highlight any changes from the
originally approved description. Note that “material” changes to a project, such as increasing the Ienglh of a taxiway, are acceptable when applying for USE approval. However, changing a taxiway project to extension of a runway is not a “material” change, Such changes require the submittal of the project as a new IMPOSE and USE project, c) Where appropriate, include a sketch showing the location of the work.
(5] PROJECT JUSTIFICATION [158.25(b)(7)]:
a) If Ihe proposed project involves terminal development, including gates and related areas, discuss any
existing conditions that limit competition between and among air carriers and foreign air carriers at the airport, any initiatives proposed to foster opportunities for enhanced competition between and among such carriers, and the expected results of such initiatives. b) For projects such as runway extensions and new runways, project justification bears on AIP project eligibility.
Further discussion and documentation is required in such cases. Referenced documents should be attached, For example, runway extensions need a justification in terms of numbers and types of operations which require a longer runway. Also, land acquisitions need a discussion of the proposed use for the property,
(6) PROJECT OBJECT!VE [158.25(b)[7)]:
Provide information on the extent to which the project achieves one or more of the following objectives: a) Presewe or enhance safety, securii, or capacity of the national air transportation system; b) Reduce noise or mitigate noise impacts resulting from the airpot or, c] Furnish opportunities for enhanced competition between or among air carriers. State how the project accomplishes the specific objective listed above. For example, widening a runway to meet FAA standards enhances safety. Explanations maybe limited.
(7) ESTIMATED PROJECT IMPLEMENTATION and COMPLETION DATES [158.25(b](l 4](iv]]:
a) List projected dates of project implementation and completion. .b) Indicate any pending actions upon which the project implementation is dependent.
c] Implementation of a project means
1) with respect to a construction project, issuance of a notice to proceed or Ihe start of physical construction; 2) with respect to non-construction projects, other that land acquisition, commencement of work by a contractor or public agency to carry out the statement of work or 3) with respect to prope~ acquisition projects, commencement of title search, surveying, or appraisal for a significant portion of the property to be acquired. 4) If the proposed project contains both design and construction work, the project implementation date is the date of the notice to proceed (or start of physical construction) for the construction project (8) For an IMPOSE ONLY project, estimate date that USE application will be submitted to the FAA[158.25(b)(14)(iii)], (9) ALP APPROVAL [15&25(c)(l)(ii(A]]: Projects submitted for IMPOSE and USE or USE approval must be shown
on an FAA approved ALP (if applicable). (10) ENVfRONMENTAL REVIEW[158.25(c)(1)(ii)(B)]:All environmental reviews required by NEPA must be complete
for projects submitted for IMPOSE and USE or USE approval (if applicable).
FAA Form 5500-1 16.94 NSN 0052-00-91 5-901X
AC 150/5000-12
Appendix 1 7/1 5194
(11] AIRSPACE DETERMINATION[158.25(c)(l)(ii)(C)]:The final FAA airspace determination must be CompletefOrprojects
submitted for IMPOSE and USE or USE approval (if applicable). (12) CARRIERS CERTIFYING AGREEMENT [158.25[b](l 1)(iii]]: List all air carriers which certified a9reement with this
Appendix 1 7/1 5194
project following consultation. (13) CARRIERS CERTIFYING DISAGREEMENT [158.25[b)(flI)(iii) and (iv)]:
a) List all air carriers which certified disagreement with this project following consultation. b) Provide a recap of each disagreement and the reasons for proceeding with the project in the face of this disagreement. Be specific. Similar disagreements by Iwo or more air ca~riers do not have to be repeated, (14] FINANCING PLAN [158,25(b](l 3)]: Use the format provided in Attachment B. If the project was previously approved
for authority to IMPOSE and costs or method of financing have changed, provide the original financing plan and a current financing plan. Note that PFC “Pay-as-you-go” is defined as PFC funds used to pay construction costs directly as opposed to paying debt service on bonds. (15) BACK-UP FINANCING PLAN [158.25[b)(l 6)]: If proposed AIP discretionary funds are included in the Financing
Plan (No. 14 above], provide a Back-up Financing Plan (using the format in No. 14 or in narrative form], or a project phasing plan, in the event the discretionary funds are not available for the project.
c. Air Carrier Consultation Information. For an application to impose a PFC or a concurrent application to impose and use, suppfy:
A summary of consultation with air carriers and foreign air carriers operating at the airporf, including: (1) A fist of such carriers and those notified: (2) A fist of carriers that acknowledged receipt of the notice (3) A copy of the information provided to the carriers at or before the consultation meeting, and after the meeting
(if applicable). For an application to use PFC revenue where authorify to impose has been previously approved, submit:
A summary of further consultation undertaken with the air carriers and foreign air carriers operating at the airport. [A consultation meeting is optional.] For an application to amend an existing PFC, submit:
A summary of further consultation undertaken with the air carriers and foreign air carriers operating at the airporl including the carriers’ agreement or disagreement. In the event of any carrier disagreement, submit the reasons presented by the carriers for disagreeing with the proposed amendment and ths public agency’s reasons for requesting the amendment in the face of such disagreement.
d. Request to exclude a class or classes of carriers from PFC collection.
For an application to impose a PFC or a concurrent application to impose and use that includes a request that a class or classes of carriers not be required to collect PFC’S,submit:
(1] A request to exclude a class or classes of carrier< (2] A copy of the information provided to the carriers during consultation including;
(i] the designation of each such class, (ii) the names of the carriers belonging to each such class, to the extent the names are known, (Wheestimated numb?r of passengers enplaned annually by each such class, and (iv)~~ ~~~ic agency’s kdsons for requesting that carriers in each such class not be required IO collect
(3) A copy of tie carriers’ comments with respect 10such information; (4) A list of any class or classes of carriers that would not be required to collect a PFC if the request is approved; [5) The public agency’s reasons for submitting the request in the face of any opposing comments. For an application to amend an existing PFC when requesting to establish a new class of carriers or to amend a previously approved class of carriers that would not be required to collect the PFC.
If applicable, a request to exclude a class or classes of carriers from the requirement 10 collect PFCS including that informationrequiredby itemsd(l ) through(5) above. For an amended request includea summatyof further consultationwith all carriers operating at the airporl and the public agency’s justification for the request.
e. Alternative Uses/ Projects.
For an application to impose a PFC (which is not accompanied by a concurrent application for authority to use PFC revenuej, submit a description and justification of alternative uses of the PFC revenue to ensure such revenue can be used on eligible projects in the event the proposed project cannot be implemented.
f. Other.
Please indicate any other materials attached to the application.
… - ---..--- FAA Form 5500-1 {6-941 NSN: W5Z-W-Y10-YWU
*U.S. G. P. O. :1994-301-717:28 4