Notices
All CurrentHistoricalCancelledProposed 7,860 documents
- Notice N JO 6820.43Interim Notice to change TACR to TACANCancelledAug 26, 2017
- Notice N JO 6820.44Interim Notice to Clarify Battery Maintenance in the Latest Edition of Order JO 6820.7CancelledAug 18, 2017
- Notice N JO 6820.45Verification of a Safety Modification, EEM 6820.6, Chapter 79, Change 115CancelledJan 2, 2020
- Notice N JO 6820.46Temporary Suspension of Battery Charger Power Supply (BCPS) Maintenance in FAA Order 6820.7D for FA-10391 3rd GEN VOR/DMECancelledFeb 3, 2025
- Notice N JO 6820.47Temporary Suspension of Battery Charger Power Supply (BCPS) Maintenance in FAA Order 6820.7D for FA-10391 3rd GEN VOR/DMEJan 29, 2026
- Notice N JO 6820.48Notice: FA-9996 Optional Pullup Resistor to Improve the CASS ConnectionHistoricalOct 6, 2026
- Notice N 6830.1Mls-RfpCancelledMay 1, 1983
- Notice N 6830.2Development of 6830, Maintenance of Microware Landing System EquipmentCancelledApr 1, 1986
- Notice N 6830.3CERTIFICATION Parameters for Allied Signal (formerly Bendix) Microwave Landing Systems (MLS)CancelledDec 1, 1994
- Notice N 6830.4Certification Parameters for Allied Signal (formerly Bendix) Microwave Landing Systems (MLS)CancelledJan 1, 1996
- Notice N 6830.5Interim Certification Parameters for Allied Signal (formerly Bendix) Microwave Landing Systems (MLS)CancelledJan 1, 1997
- Notice N 6830.6Certification Parameters for Allied Signal (formerly Bendix) Microwave Landing Systems (MLS)CancelledFeb 1, 1998
- Notice N 6850.20Technical Instruction Books for Lir StructuresCancelledSep 1, 1982
- Notice N 6850.21High Intensity Approach Lighting System With Sequenced Flashing Light (ALSF-2), Instrctn. BookCancelledAug 1, 1983
- Notice N 6850.22Malsr, Hvre & Reil Flashing Light System, Ti 6850.54CancelledJan 1, 1984
- Notice N 6850.23Instruction Book for Low Impact Resistant (LIR) StructuresCancelledJul 1, 1987
- Notice N 6850.24Standards/tolerances and Periodic Maintenance Requirements, Lighted Navigational AidsCancelledFeb 1, 1992
- Notice N 6850.25Alignment of the Sonicraft Precision Approach Path Indicator (PAPI), Fa-10147CancelledMar 1, 1993
- Notice N 6850.26Limit Alsf-2 Monitoring to Brightness Level 5CancelledJun 1, 1993
- Notice N 6850.27Scheduled Revision of 6850.5b, Maintenance of Lighted Navigational AidsCancelledOct 1, 1993
- Notice N 6850.28Alignment of the Sonicraft Precision Approach Path Indicator (PAPI), Fa-10147CancelledMay 1, 1994
- Notice N 6850.29Limit Alsf-2 Monitoring to Brightness Level 5CancelledJun 1, 1994
- Notice N 6850.30Limit Alsf-Ii Monitoring to Brightness Level 5CancelledJul 1, 1995
- Notice N 6850.31Limit Alsf-2 Monitoring to Brightness Level 5CancelledAug 1, 1996
- Notice N 6850.32Safety Hazard in Lighted Navaids EquipmentCancelledSep 1, 1996
- Notice N 6850.33Possible Incorrectly Wired Fuses, Precision Approach Path Indicator (PAPI) Type Fa-10265CancelledNov 1, 1996
- Notice N 6850.34Mals, Malsf, and Malsr Par-38 Wattmiser Lamp ReplacementCancelledDec 1, 1996
- Notice N 6850.35Interim Maintenance and Certification of the Dual Mode High-Intensity Approach Lighting System WithCancelledJan 1, 1997
- Notice N 6850.36Approach Lighting System Flasher Individual Control Cabinet Potential Shock HazardCancelledApr 1, 1997
- Notice N 6850.37Limit Alsf-2 Monitoring to Brightness Level 5CancelledSep 1, 1997
- Notice N 6850.38Mals, Malsf, and Malsr Par-38 Wattmiser Lamp ReplacementCancelledNov 1, 1997
- Notice N 6850.39Limit ALSF-11 Monitoring to Brightness Level 5CancelledJan 1, 1999
- Notice N 6850.40Recall of the Flasher Monitor Cca for the Airflow Alsf-2, Type Fa-10048CancelledFeb 1, 1999
- Notice N 6850.41Limit Alsf-Ii Monitoring to Brightness Level 5CancelledMar 1, 2000
- Notice N 6850.42Limit ALSF-11 Monitoring to Brightness Level 5CancelledApr 5, 2001
- Notice N 6850.42Limit ALSF-11 Monitoring to Brightness Level 5CancelledApr 5, 2001
- Notice N 6850.43Interim Procedure to Limit ALSF-11 Monitoring to Brightness Level 5CancelledJul 28, 2003
- Notice N 6850.44Notice of Intent Rev of 6850.5c, Maint of Lighted Navigational AidsCancelledMar 25, 2005
- Notice N 6850.45Interim Guidance for Locally Established Vertical Standard for Vasi and PapiCancelledMar 25, 2005
- Notice N 6850.46Survey to Verify Number and Location of Papi Systems With Incorrectly Positioned Red FiltersCancelledJan 19, 2006
- Notice N 6850.47Interim Guidance for Locally Established Vertical Alignment Standard for Vasi and PapiCancelledJul 11, 2006
- Notice N JO 6850.49Interim Guidance for Flight Inspection After LHA Vertical Angle Adjustment of 12 Minutes or More for VASI and PAPICancelledAug 25, 2008
- Notice N JO 6850.50Survey of Multi-Electric MALSRs with Master B Flasher TimersCancelledAug 2, 2010
- Notice N JO 6850.51Interim Guidance to Field Personnel on PAPI First Fault MonitorCancelledAug 5, 2010
- Notice N JO 6850.52Survey of Type FA-8091 Multi-Electric MALSRs and Multi-Electric MALSRs with Mechanical Flasher TimersCancelledSep 24, 2010
- Notice N JO 6850.53Interim Standards and Tolerances and Certification Parameters for RLMS and ALSF-2/SSALR in JO 6850.5CCancelledNov 22, 2010
- Notice N JO 6850.54Revised Procedure to Reduce Impact of ALSF-2 CCR Power Supply Failure (NBP)CancelledApr 12, 2011
- Notice N JO 6850.55Revised Procedure to Reduce Impact of ALSF-2 CCR Power Supply Failure (Airflo)CancelledApr 12, 2011
- Notice N JO 6850.56Revised Procedure to Reduce Impact of ALSF-2 CCR Power Supply Failure (Godfrey)CancelledApr 12, 2011
- Notice N JO 6850.57Interim Loop Current Calibration Procedures for Godfrey ALSF-2/SSALR SystemsCancelledOct 27, 2011
- Notice N JO 6850.58Interim Loop Current Calibration Procedures for AIRFLO ALSF-2/SSALR Systems - WEB RELEASE ONLYCancelledNov 7, 2011
- Notice N JO 6850.59Interim Loop Current Calibration Procedures for New Bedford Panoramex (NBP) ALSF-2/SSALR Systems - WEB RELEASE ONLYCancelledNov 23, 2011
- Notice N JO 6850.60Temporary Hold on SSM-ALSH-009CancelledJan 24, 2013
- Notice N JO 6850.61Notice of Intent for New Maintenance Handbook, JO 6850.XX, Maintenance of the Runway Status Lights (RWSL) System, Type FA-29900CancelledApr 24, 2013
- Notice N JO 6850.62Release of Temporary Hold on SSM-ALSH-009CancelledSep 27, 2013
- Notice N JO 6850.63Order JO 6850.5C Interim Procedure Change, ALSF 1-Second Power Transfer TestingCancelledApr 16, 2014
- Notice N JO 6850.64Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5CancelledDec 12, 2014
- Notice N JO 6850.65Interim Update to Order JO 6850.38, Maintenance of the Runway Status Lights (RWSL) System, Type FA-29900CancelledMar 17, 2015
- Notice N JO 6850.66Interim Procedures and Guidance for Vertical Aiming of Par-56 Lamps on Approach Lighting Systems (ALS)CancelledJul 24, 2015
- Notice N JO 6850.67Interim Guidance for Lighted Navigational Aid Cable MaintenanceCancelledJul 24, 2015
- Notice N JO 6850.68Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5CancelledJun 24, 2016
- Notice N JO 6850.69Interim Guidance for Lighted Navigational Aid Cable MaintenanceCancelledAug 19, 2016
- Notice N JO 6850.70Interim Notice to MALSR PAR-38 Steady Burning Lamp ApplicationCancelledOct 7, 2016
- Notice N JO 6850.71Interim Procedures and Guidance for Vertical Aiming of Par-56 Lamps onCancelledOct 18, 2016
- Notice N JO 6850.72Interim Guidance for the Quarterly Series Circuit Loop Voltage Measurement for the Runway Status Lights (RWSL) SystemCancelledNov 17, 2016
- Notice N JO 6850.73SAFETY NOTICE - Type FA-8736 Portable Tester, Sequenced Flashing Lights, Electrical Safety Hazard WEB RELEASECancelledDec 15, 2016
- Notice N JO 6850.74SAFETY NOTICE - ALSF-2\SSALR with RLMS Electrical and Fire Safety Hazard WEB RELEASE ONLYCancelledDec 15, 2016
- Notice N JO 6850.75Interim Guidance on Flasher Tester Type (FTT) retirement for ALSF-2/SSALR and RLMS SystemsCancelledMar 3, 2017
- Notice N JO 6850.76Technical Instruction Book TI 6850.101 Replacement Lamp Monitoring System (RLMS) Type FA-10724 Interim Procedure Change for Lamp MonitorCancelledFeb 28, 2017
- Notice N JO 6850.77Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5CancelledJun 27, 2017
- Notice N JO 6850.78Interim Guidance for Lighted Navigational Aid Cable MaintenanceCancelledMar 30, 2018
- Notice N JO 6850.79Mandatory Use of PAPI Tilt Switches at all TimesCancelledSep 28, 2017
- Notice N JO 6850.80Resolving Potential Fire Hazard in FA-21000 MALSRsCancelledOct 30, 2017
- Notice N JO 6850.81Interim Guidance for the Quarterly Series Circuit Loop Voltage Measurement for the Runway Status Lights (RWSL) SystemCancelledFeb 20, 2018
- Notice N JO 6850.82SAFETY NOTICE - Runway End Identifier Lights (REIL) Dual Power Source Electrical Shock HazardCancelledMay 2, 2018
- Notice N JO 6850.83Interim Procedures and Guidance for Vertical Aiming of PAR-56 Lamps on Approach Lighting Systems (ALS)CancelledJun 5, 2018
- Notice N JO 6850.84Mandatory Use of PAPI Tilt Switches at all TimesCancelledSep 27, 2018
- Notice N JO 6850.85Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5CancelledOct 9, 2018
- Notice N JO 6850.86Interim Notice to MALSR PAR-38 Steady Burning Lamp ApplicationCancelledJan 29, 2019
- Notice N JO 6850.87Upcoming Changes to Runway Status Lights (RWSL) Technical Instruction Book (TIB) 6850.107: New Light FixturesCancelledFeb 1, 2019
- Notice N JO 6850.88Interim Changes to Order JO 6850.5C, Maintenance of Lighted Navigational AidsCancelledFeb 11, 2019
- Notice N JO 6850.89INTERIM CHANGES TO ORDER JO 6850.5C, MAINTENANCE OF LIGHTED NAVIGATIONAL AIDSCancelledMay 29, 2019
- Notice N JO 6850.90Interim Guidance for Lighted Navigational Aid Cable MaintenanceCancelledApr 5, 2019
- Notice N JO 6850.91Mandatory Use of PAPI Tilt Switches at all TimesCancelledSep 26, 2019
- Notice N JO 6850.92Interim Certification Parameters and Tasks for FA-30200 PAPI to Order JO 6850.5CancelledOct 8, 2019
- Notice N JO 6850.93Interim Notice to MALSR PAR-38 Steady Burning Lamp ApplicationCancelledJan 23, 2020
- Notice N JO 6850.94Low Impact Resistance (LIR) Structure Operation and Support Equipment Inspection - Interim ProceduresCancelledDec 20, 2019
- Notice N JO 6850.95INTERIM PROCEDURE TO REMOVE AND REPLACE THE IBUTTON ON THE ACE MAIN CONTROL PCBCancelledJan 6, 2020
- Notice N JO 6850.96Interim Changes to Order JO 6850.5C, Maintenance of Lighted Navigational AidsCancelledJan 30, 2020
- Notice N JO 6850.97SAFETY NOTICE - Potential Shock Hazard REIL Type FA-9628CancelledMar 5, 2020
- Notice N JO 6850.98Interim Guidance for Lighted Navigational Aid Cable MaintenanceCancelledMay 25, 2020
- Notice N JO 6850.99Interim Changes to Order JO 6850.5C, Maintenance of Lighted Navigational AidsHistoricalApr 1, 2020
- Notice N JO 6850.100Delay Implementing Guidance in N6850.96 for VASI-2 Tilt Monitoring SystemsCancelledMay 12, 2020
- Notice N JO 6850.101Changes to Runway Status Lights (RWSL) Maintenance: New Light Fixture and Master Controller UnitCancelledJun 15, 2020
- Notice N JO 6850.102Investigate NBP ALSF/RLMS Loop Sync CCA Field Asset DistributionCancelledDec 7, 2020
- Notice N JO 6850.103Prevent and Correct FA-30200 LED PAPI Wiring ErrorsCancelledJul 22, 2020
- Notice N JO 6850.104Notification of Correction to FA-24000 PAPI Standards & Tolerances and eTPRCancelledMar 22, 2021
- Notice N JO 6850.105Delay Implementing Guidance in JO 6850.5D for VASI-2 Tilt Monitoring SystemsCancelledAug 24, 2021
- Notice N JO 6850.106Interim Notice to MALSR PAR-38 Steady Burning Lamp ApplicationCancelledOct 14, 2021
- Notice N JO 6850.107Interim Changes to Order JO 6850.5D, Maintenance of Lighted Navigational Aids for FA-10147 PAPICancelledJan 26, 2022